CM-08-02-055DATE: February 22, 2008 SUBJECT: City Manager -February 29, 2008 ITEM: Action authorizing City Manager to approve Change Order No. 11 with FT Woods Construction for the Round Rock Police Facility. Department: Engineering and Development Services Staff Person: Tom Word, Chief of P.W. Operations Larry Madsen, Construction Manager Justification: Change Order No. 11 includes credit for value engineering and cost for unforeseen site conditions. The armory, room #712 and the south exterior wall costs were reduced through value engineering. The additional costs resulted from improperly placed moisture barrier during original construction, capping and sealing exterior louvers and re -designing and extending the entry/exit gates. These items have been reviewed by architect, contractor and city staff for approval. Funding: Cost: Source of funds: 2002 GO Bonds & General Self Finance Construction $24,075.22 Outside Resources: Brinkley Sargent Architects FT Woods Construction Background Information: On February 22,2007 the City Council approved resolution number R -07-02-22-8C2 to enter into a Standard Form of Agreement with FT Woods Construction for construction of the new Police Facility at 3001 Tellabs Dr. Public Comment: N/A Blue Sheet Format Updated 01/20/04 Amount % Change Original Contract $ 10,884,000.00 N/A Previous Change Orders $ 500,391.29 4.60% Change Order No. 11 $ 24,075.22 0.22% Revised Contract $ 11,408,466.51 4.82% Outside Resources: Brinkley Sargent Architects FT Woods Construction Background Information: On February 22,2007 the City Council approved resolution number R -07-02-22-8C2 to enter into a Standard Form of Agreement with FT Woods Construction for construction of the new Police Facility at 3001 Tellabs Dr. Public Comment: N/A Blue Sheet Format Updated 01/20/04 ROUND ROCK POLICE FACILITY CONSTRUCTION CHANGE ORDER Project Round Rock Police Facility Change Order No.: Address: 3001 Tellabs Drive 11 Initiation Date: 2/12/2008 Round Rock, Texas Contract For: General Construction To: FT Woods Construction Contract Date: 1966 South Austin Avenue Georgetown, Texas 78626 (Contractor) The Contract is changed as follows: 2/22/2007 #134 Concrete floor treatment to lay linoleum flooring #136 Re -design stainless countertop at armory #137 Delete extra light arm Room # 712 #139 Replace existing exterior door #449 at rear of building entrance #144 Delete paint at South Exterior Wall #151 Re -Design and extend two entry gates #153 Metal panels to cover louvers at exterior Add Credit Credit Add Credit Add Add $ 17,440.68 $ (1,000.00) $ (1,712.00) $ 609.16 $ (4,800.00) $ 12,956.33 $ 581.05 Total $ 24,075.22 This Change Order is not in effect and will not be included in the Contract Documents until signed by the Owner, Architect and Contractor. Changes included herein are subject to all conditions affecting them under the substitution specification section. Summary The original Contract Sum was. Net change by previous authorized Change Orders. The Contract Sum prior to this Change Order was. The Contract Sum will be increased by this Change Order The new Contract Sum including this Change Order will be. The Contract time will be unchanged The Date of Substantial Completion as of the date of this Change Order therefore is: $ 10,884,000.00 $ 500, 391.29 $ 11,384,391.29 $ 24,075.22 $ 11,408,466.51 Brinkley Sargent Architect FT Woods Construction City of Round Rock Contractor 5040 6 6nruntDrive, Suite 600 1966 South Austin Avenue : ddress D ifas, Txas`75254 Gary Beeman k f ec) Date Cnu,-Ob-04-055 Address Georgetown, Texas 78626 By S.C. Inman, IV Date zl124fle Owner 221 East Main Street 3/12/08 Address Round Rock, Texas 78664 James R. Nuse, P.E Date Change Request II MOODS Construction To: Gary Beeman Brinkley Sargeant 5000 Quorum Suite 600 Dallas, TX 75240 Ph: 972-960-9970 Description: Install moisture treatment under hnoieum flooring P.O. Box 122 Georgetown, TX 78627 Ph : 512-930-2607 Number 134 Data: 1/8/08 Job: 2007-010-001 Round Rock Police Department Phone: (512)238-0930 We are pleased to offer the following specifications and pricing to make the fogawing changes: Moisture treatment of existing stab foundation to bring it into compliance to Mow installation of linoleum flooring. Final Mktg for moisture treatment. The total amount to provide this work is $17,440.68 (Please refer to attached sheet for details.) The schedule is not affected by this cage. If you have any questions, please corrtact me at . Submitted by: SC Inman FTW00DS Cc: Approved by. Date - Page 1 of 2 t34`