Loading...
Contract - Page Southerland Page - 7/23/2015 STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: PAGE SOUTHERLAND PAGE, INC. ("Engineer") ADDRESS: 400 West Cesar Chavez Street, Suite 500,Austin, TX 78701 PROJECT: Southwest Downtown Infrastructure Improvements Phase 5A This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Page Southerland Page, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 24th day of July, 2014 for the Southwest Downtown Infrastructure Improvements Phase 5A Project in the amount of$280,626.24; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$148,505.85 to a total of$429,132.09; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $148,505.85 the lump sum amount payable under the Contract for a total of $429,132.09, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rev.12/01/08 0199.1483;00337400 84275 �j r 1 PAGE SOUT A PA C. By: (Q17A I f�z Date CITY OF/ROUND RO K APP D A TOL M: By: _J;/-n a Alan McGraw, Mayor Stepha L. Sheets, City Attorney '+-2-� '- 15 Date Supplemental Contract Rev.12/01/08 0199.1483;00337400 84275 2 ADDENDUM TO EXHIBIT B Engineering Services PROJECT: Southwest Downtown Infrastructure Improvements— Phase 5A for following streets: MAYS STREET(HS&A); WEST MAIN ST. (HS&A); portions of S. BLAIR STREET(BAI and PAGE Utils), W. LIBERTY AVE. (BAI & PAGE Utils), ROUND ROCK AVE. (BAI w/ HDR; PSP Utils) Scope: 1) PAGE will compile Drawings and a Project Manual for Bid Documents in one Project Manual from the single Manual combined previously(Ph 5-Bids not approved)from Manuals prepared by: - Baker-Aicklen Inc. (BAI), and their sub-consultant HDR; and - Huggins Seiler&Assoc. (HS&A); - PAGE will assist the City in obtaining bids; review bids and recommend award;and provide Construction Phase Services. The project will consist of portions of: MAYS STREET(HS&A); WEST MAIN ST. (HS&A);S. BLAIR STREET(BAI and PAGE Utils), W. LIBERTY AVE. (BAI & PAGE Utils), and ROUND ROCK AVE. (BAI w/ HDR; PSP Utils) including the Roundabout. 2) PAGE will develop and issue addenda as appropriate,to interpret, clarify, or expand the bid documents. 3) PAGE will modify sealed plans having minor modifications needed to make plans current for bid.The modifications will be sealed by PAGE and re-issued for the project. 4) PAGE will coordinate Electrical Engineer for Electrical Street Light Redesign for use of single type of luminaire. 5) PAGE will coordinate Structural Engineer for Electrical Street Light Redesign (support elements along bridge)for use of single type of luminaire. 6) PAGE will render color Exhibits of Bridge Elements. 7) PAGE will attend the Pre-Bid Conference. 8) PAGE will assist the City in obtaining bids; review and tabulate bids, recommend award and fill out the Agreement form. 9) PAGE will provide Construction Phase Services. PAGE Construction Phase Services are to be provided for 113 weeks starting at construction notice to proceed. Construction Services include: conducting an environmental site pre-construction meeting, attendance at weekly 1 on-site construction review meetings, review of submittals and shop drawings, response to requests for information (RFI's), issuance of design clarifications via Architect's supplemental instruction's (ASI's), review of monthly construction draw, review any proposed change orders, project close out services, provide record drawings prepared from Contractor supplied "As Builts", and provide engineering management and administrative services associated with the above referenced tasks. Services will include minor sealed plan engineering clarifications associated with original Engineering Plans to be provided in CAD format by: - Baker-Aicklen Inc. (BAI), and their sub-consultant HDR; and - Huggins Seiler&Assoc. (HSA); Construction phase observation is to be provided by the City Inspector. PAGE will endeavor to secure compliance by the Contractor to the plans and specifications. PAGE shall not be responsible for construction means, methods, safety, techniques, sequences or procedures employed by the Contractor in connection with the work and PAGE shall not be responsible for the contractor's errors or omissions or failure to carry out the work in accordance with the contact documents or directives issued via RFI or ASI or submittal responses. 10) PAGE will perform project close out with the City. 11) PAGE will perform permitting close out with TCEQ with respect to the TCEQ WPAP and SCS plans submitted by others and prior approved by TCEQ. 12) PAGE will provide engineering design services for the following: a. New 12" Water Line and Services-Main St. Between Blair St. and Mays St. (C- 78 new sheet) b. New 8" Wastewater Line and Services- Main St. Between Blair St. and Mays St. (C-84 new sheet) c. New Wastewater Manhole and Services-Wastewater Line "C" -Sheet C-85 d. New 12" Water Line and Services- Liberty St. Between Blair St. and Mays St. (Sheet C-77) Services Not Included: The following services are not included in the scope of the Basic Design Services. It is anticipated that some of these services are not required, are additional services, or will be provided by others: Services not Included: 1. Changes or Additions to the Basic Design Services or Approved Civil Master Plan Documents initiated by the Owner or resulting from unforeseen field conditions encountered during construction. 2 2. City, State or other Governing Agency Fees. Services believed not required: 1. Zoning and Re-Subdivision. 2. Environmental Assessments(use previous Geologic Site Assessment provided by Owner). 3. Storm Water Detention Analysis and Facilities Design (previously documented and approved/determined by City to not be required due to proximity to lower Lake Creek). 4. FEMA Flood Plain Analysis/ Revisions. 5. Corps of Engineers Section 404 (Wetlands) Permitting. 6. Tree,Topographical and Boundary Survey(use previous survey provided by Owner). 7. Permitting associated with the following Jurisdictions: US Fish &Wildlife Service 8. Off-Site Roadway Improvements. 9. Off-Site Drainage Studies (areas not located within the Approved Civil Master Plan Area). 10. Pavement section recommendations. (BAI portion of plans use Owner provided PSI Geotechnical Consultants Subsurface Exploration and Pavement Recommendations, dated Feb 6, 2004; and Supplemental Pavement Recommendations, dated May 10, 2004) (HS&A portion of plans use references provided by HS&A plans as proposed by HS&A). Services provided by others: 1. Transportation Studies or Traffic Impact Analysis (by Owner). 2. Americans with Disabilities Act (ADA)TAS/TDLR registration and review—(Provided by Owner). Note : Registration will be coordination by Engineer with a Service Provider Approved by City and any Fees will be paid by the Owner. 3. Preparation of easement dedication/vacation exhibits and Recordation (by Licensed Surveyor and Owner). 4. Landscape and Irrigation Design/Site Furnishings/Signage and Graphics (by Owner). 5. If required, Design of retaining walls (Structural Design required). 3 ADDENDUM TO EXHIBIT C Work Schedule PROJECT: Southwest Downtown Infrastructure Improvements— Phase 5A ESTIMATED PROJECT SCHEDULE City Work Authorization to PAGE .................................................. 4/ 17/2014 Kick off meeting ............................................................... 5/ 19/2014 Compiled Project Manual to City for Final Review(on or before) .... 7/01/2014 Informal City Comments(on or before) ................................. 7/08/2014 AdvertiseforBids: Bid Documents Available to Bidders ................... 11/ 11/ 2014 Saturday, 11/8/2014; Sun 11/9/2014 Saturday, 11/ 15 /2014;Sun 11/ 16/2014 Saturday, 11/22/2014; Sun 11/23/2014 Saturday, 11/29/2014; Sun 11/30/2014 Pre-Bid Conference 2:00 p.m., Wed. ................................................... 7/23/2014 BiclOpening 2:00 p.m.,Tuesday ....................................................... 12/9/2014 Bid Award (elapsed time 30 days) ....................................................... 1/9/2015 Notice to Proceed Issued (elapsed time 10 days) ................................ 3/23/2015 Project Duration (elapsed time 24 months) ......................................... 3/ 12/2017 Project Close Out (elapsed time 2 months) ......................................... 5/ 12/2017 ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page EXHIBIT D ° City of Round Rock Southwest Downtown Infrastructure Improvements(SWDT PHASE 5A): Mas St.;W.Main St., Round Rock Ave. Roundabout,W. Liberty Ave.,,&portion of Blair St..between-Liberty St.and just south of Main St. DIRECT OVERHEAD TOTAL FIXED FEE TOTAL LABOR COSTS BY FUNCTION CODE: LABOR 150.00% LABOR+OVHD 10.00% COST F.C.100 Compile and Revise plans $ 16,688.10 $ 25,032.15 $ 41,720.25 $ 4,172.03 S 45,892.28 F.C.101 Quantity Take Offs(3hrs/per sheet'90 sheets) $ 10,899.65 $ 16,349.48 $ 27,249.13 $ 2,724.91 S 29,974.04 F.C.102 Compile and Revise Specs $ 3,209.25 $ 4,813.88 $ 6,023.13 $ 802.31 S 8,825.44 F.C.103 Electrical Redesign $ 4,193.42 $ 6,290.13 $ 10,483.55 $ 1,048.36 S 11,531.91 F.C.104 Structural Redesign $ 1,240.91 $ 1,861.37 $ 3,102.28 $ 310.23 $ 3,412.50 F.C.105 Rendering Exhibits $ 1,626.02 $ 2,439.03 $ 4,065.05 $ 406.51 S 4,471.56 F.C.110 Constr.Serv.-Bid and Award: $ 3,427.16 $ 5,140.74 $ 8,567.90 $ 856.79 S 9,424.69 F.C.120 Constr.Serv.-Constr.Admin.:(113 wks) $ 23,677.60 $ 35,516.40 $ 59,194.00 $ 5,919.40 S 65,113.40 F.C.130 Constr.Serv.-Weekly Meetings:(113 wks) $ 14,505.81 $ 21,758.72 $ 36,264.53 $ 3,626.45 $ 39,890.98 F.C.160 Construction Services-Project Final Close Out $ 3,424.00 $ 5,136.00 $ 8,560.00 $ 856.00 $ 9,416.00 F.C.170 Permitting Services(TCEQ Close Out Services) $ 513.48 $ 770.22 $ 1,283.70 $ 126.37 S 1,412.07 F.C.200 PROJECT MANAGEMENT(113 weeks) $ 10,902.00 $ 16,353.00 $ 27,255.00 $ 2,725.50 S 29,980.50 SUBTOTAL(ORIGINAL SCOPE) $ 94,307.40 $ 141,461.10 $ 235,768.50 $ 23,576.85 $ 259,345.35 Supplemental 1 F.C.120 Constr.Serv.-Constr.Admin.:-Suppl.1 $ 30,937.17 $ 46,405.76 $ 77,342.93 $ 7,734.29 S 85,077.22 F.C.120 Constr.Serv.-Constr.Admin.(Structural):-Suppl.1 $ 3,123.67 $ 4,685.51 $ 7,809.18 $ 780.92 $ 8,590.09 F.C.130 Weekly Formal Meeting Minutes:-Suppl.1 $ 7,274.30 $ 10,911.45 $ 18,185.75 $ 1,818.58 $ 20,004.33 F.C.140 Additional Civil Design Services:-Suppl.1 $ 7,744.99 $ 11,617.49 S 19,362.48 $ 1,936.25 $ 21,298.72 F.C.200 PROJECT MANAGEMENT,Suppl.1 $ 4,922.00 $ 7,363.00 $ 12,305.00 $ 1,230.50 $ 13,535.50 SUBTOTAL(SUPPLEMENTAL 1) $ 54,002.13 $ 81,003.20 $ 135,005.33 $ 13,500.53 $ 148,505.86 TOTAL $ 148,309.53 $ 222,464.30 $ 370,773.83 $ 37,077.38 $ 407,851.21 DIRECT COSTS: EXPENSES: UNIT RATE QUANTITY TOTAL Final Mylar Plots SF S 20.00 240 $ 4,800.00 Reproduction EA-24 x 36 S 10.00 960 $ 9,600.00 Reproduction EA-8.5 x 11 S 0.10 6,000 $ 600.00 Mileage Mile S 0.56 4,972 $ 2,761.95 113 trips;44 miles/trip Per Diem Day S - $ - Mail&Deliveries EA S _ 250.00 3 $ 750.00 Advertise for Bids $ 1.00 2,500 $ 2,500.00 tollso $ 2-38 113 $ 268.94 $ - $ TOTAL EXPENSES --— — - -------- $ 21,280.89 SUB-CONTRACTS: _ _____ ___ TASK TOTAL iSurveying Company Name Surveys $ - Company Name SUE Level B $ - ,Company Name TDLR Design/Compliance Review $ - TOTAL SUB-CONTRACTS $ - TOTAL DIRECT COSTS $ 21,280.89 TOTAL COST $ 429,132.09 PageSoulherland Page Sheet 2 of 4 Southwest Downtown Infrastructure Improvements BLAIR PLUS PHASE City of Round Rock F.C.110 Constr.Serv.-Bid and Award: Manhours Rate Direct Labor Project Engineer 44 $42.79 $ 1,882.76 Engineer 44 $35.10 $ 1,544.40 Senior Civil Designer 0 $27.40 $ - Civil Designer 0 $26.44 $ - Junior Civil Designer 0 $25.48 $ - Administrative Assistant 0 $18.99 $ - Sub-total 88 $ 3,427.16 F.C.120 Constr.Serv.-Constr.Admin.:(113 wks) Manhours Rate Direct Labor Project Engineer 270 $42.79 $ 11,553.30 Engineer 169 $35.10 $ 5,931.90 Senior Civil Designer 226 $27.40 $ 6,192.40 Civil Designer 0 $26.44 $ - Junior Civil Designer 0 $25.48 $ - Administrative Assistant 0 $18.99 $ - Sub-total 665 $ 23,677.60 F.C.130 Constr.Serv.-Weekly Meetings:(113 wks) Manhours Rate Direct Labor Project Engineer 339 $42.79 $ 14,505.81 Engineer 0 $35.10 $ - Senior Civil Designer 0 $27.40 $ - Civil Designer 0 $26.44 $ - Junior Civil Designer 0 $25.48 $ - Adminislralive Assistant 0 $18.99 $ - Sub-total 339 $ 14,505.81 F.C.120 Constr.Serv.-Constr.Admin.:-Suppl.1 Manhours Rate Direct Labor Project Engineer 723 $42.79 $ 30,937.17 Engineer 0 $35.10 $ - Senior Civil Designer 0 $27.40 $ Civil Designer 0 $26.44 S Junior Civil Designer 0 $25.48 $ Administrative Assistant 0 S18.99 $ - Sub-total 723 $ 30,937.17 F.C.120 Constr.Serv.-Constr.Admin.(Structural):-Suppl.1 Manhours Rate Direct Labor Project Engineer 73 $42.79 $ 3,123.67 Engineer 0 $35.10 $ - Senior Civil Designer 0 $27.40 $ Civil Designer 0 $26.44 $ Junior Civil Designer 0 $25.48 $ Administrative Assistant 0 $18.99 $ - Sub-total 73 $ 3,123.67 F.C.130 Weekly Formai Meeting Minutes:-Suppl.1 Manhours Rate Direct Labor Project Engineer 170 $42.79 $ 7,274.30 Engineer 0 $35.10 $ - Senior Civil Designer 0 $27.40 $ Civil Designer 0 $26.44 $ Junior Civil Designer 0 $25.48 $ Administrative Assistant 0 $18.99 $ - Sub-total 170 $ 7,274.30 F.C.140 Additional Civil Design Services:-Suppl.1 Manhours Rate Direct Labor Project Engineer 181 $42.79 $ 7,744.99 Engineer 0 $35.10 S - Senior Civil Designer 0 $27.40 $ Civil Designer 0 $26.44 $ Junior Civil Designer 0 $25.48 $ Administrative Assistant 0 $18.99 $ - Sub-total 181 $ 7,744.99 PageSoutherland Page Sheet 3 of 4 Southwest Downtown Infrastructure Improvements BLAIR PLUS PHASE City of Round Rock FC 160 Construction Services-Project Final Close Out Manhours Rate Direct Labor Project Engineer 16 $46.00 $ 736.00 Engineer 0 $46.00 $ - Senior Civil Designer 64 $42.00 $ 2,688.00 Civil Designer 0 $42.00 $ - Junior Civil Designer 0 $38.00 $ Administrative Assistant 0 $34.00 $ - Sub-total 80 $ 3,424.00 F.C. 170 Permitting Services(TCEQ Close Out Services) Manhours Rate Direct Labor Project Engineer 12 $42.79 $ 513.48 Engineer 0 $35.10 $ - Senior Civil Designer 0 $27.40 $ - Civil Designer 0 $26.44 $ - Junior Civil Designer 0 $25.48 $ - Administrative Assistant 0 $18.99 $ - Sub-total 12 $ 513.48 F.C. 100 Compile and Revise plans Manhours Rate Direct Labor Project Engineer 390 $42.79 $ 16,688.10 Engineer 0 $35.10 $ - Senior Civil Designer 0 $27.40 $ - Civil Designer 0 $26.44 $ Junior Civil Designer 0 $25.48 $ - Administrative Assistant 0 $18.99 $ - Sub-total 390 $ 16,688.10 F.C. 101 Quantity Take Offs (3hrslper sheet 90 sheets) Manhours Rate Direct Labor Project Engineer 185 $42.79 $ 7,916.15 Engineer 85 $35.10 $ 2,983.50 Senior Civil Designer 0 $27.40 $ - Civil Designer 0 $26.44 $ - Junior Civil Designer 0 $25.48 $ - Administrative Assistant 0 $18.99 $ - Sub-total 270 $ 10,899.65 F.C.103 Electrical Redesign Manhours Rate Direct Labor Project Engineer 98 $42.79 $ 4,193.42 Engineer 0 $35.10 $ - Senior Civil Designer 0 $27.40 $ - Civil Designer 0 $26.44 $ - Junior Civil Designer 0 $25.48 $ - Administrative Assistant 0 $18.99 $ - Sub-total 98 $ 4,193.42 F,C.104 Structural Redesign Manhours Rate Direct Labor Project Engineer 29 $42.79 $ 1,240.91 Engineer 0 $35.10 $ - Senior Civil Designer 0 $27.40 $ - Civil Designer 0 $26.44 $ - Junior Civil Designer 0 $25.48 $ - Administrative Assistant 0 $18.99 $ - Sub-total 29 $ 1,240.91 PageSoutherland Page Sheet 4 of 4 Southwest Downtown Infrastructure Improvements BLAIR PLUS PHASE City of Round Rock Manhours Rate Direct Labor Engineer V 0 $46.00 $ - Engr Spec V 0 $46.00 $ - Engineer III 0 $42.00 $ - Engr Spec III 0 $42.00 $ - Engineer 1 0 $38.00 $ - Engr Tech III 0 $34.00 $ - Sub-total 0 $ - Manhours Rate Direct Labor Engineer V 0 $46.00 $ - Engr Spec V 0 $46.00 $ - Engineer III 0 $42.00 $ - Engr Spec III 0 $42.00 $ - Engineer 1 0 $38.00 $ - Engr Tech III 0 $34.00 $ - Sub-total 0 $ - F.C. 200 PROJECT MANAGEMENT(113 weeks) Manhours Rate Direct Labor Engineer V 237 $46.00 $ 10,902.00 Engr Spec V 0 $46.00 $ - Engineer III 0 $42.00 $ - Engr Spec III 0 $42.00 $ - Engineer 1 0 $38.00 $ - Engr Tech III 0 $34.00 $ - Sub-total 237 $ 10,902.00 F.&._260 PROJECT MANAGEMENT, Suppl. 1 Manhours Rate Direct Labor Engineer V 107 $46.00 $ 4,922.00 Engr Spec V 0 $46.00 $ - Engineer III 0 $42.00 $ - Engr Spec III 0 $42.00 $ - Engineer 1 0 $38.00 $ - Engr Tech 111 0 $34.00 $ - Sub-total 107 $ 4,922.00 Manhours Rate Direct Labor Engineer V 0 $46.00 $ - Engr Spec V 0 $46.00 $ - Engineer III 0 $42.00 $ - Engr Spec I II 0 $42.00 $ - Engineer 1 0 $38.00 $ - Engr Tech III 0 $34.00 $ - Sub-total 0 $ -