Loading...
R-2015-2661 - 7/23/2015 RESOLUTION NO. R-2015-2661 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cash Construction Co., Inc. for the Southwest Downtown District Infrastructure Improvements Phase 5A Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Cash Construction Co., Inc. for the Southwest Downtown District Infrastructure Improvements Phase 5A Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 23rd day of July, 2015. AVL ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SMzt-. L SARA L. WHITE, City Clerk 0112.1504;00333201 EXHIBIT Page I ora "A„ Contract Quantity Adjustment/Change Order v,08112 )epartment: Transportation 'roject lame: CORR SWDT Ph 5A Date: 6/23/15 :ity Project Change Order/Quantity D Number SWDT5 Adjustment No. i ustification Aditional quantities for water,wastewater,and electric for Main Street,Liberty,and Mays. Some additional change order electrical items(bore at Liberty, nd Brown,Grande 4"Communication lines,and new electrical manholes). Some misc change order items(gazebo remove,fix exiting WL leak at ,nderson..ect). iUMMARY Amount %Change )riginal Contract Price: $13,773,063.00 revious Quantity Adjustment(s): $0.00 his Quantity Adjustment: $567,481.00 otal Quantity Adjustment(s): $567,481.00 otal Contract Price with Quantity Adjustment(s): $14,340,544.00 revious Change Order(s): $0.00 0% his Change Order: $132,905.00 10/0 btal Change Order(s)To Date: $132,905.00 1% djusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) lus Change Order(s)]: $14,473,449.00 inference between Original and Adjusted Contract Prices: $700,386.00 riginal Contract Time: 720 Calendar Days be Adjustment by previous Quan.Adj./Change Order: 0 Calendar Days ime Adjustment by this Quan.Adj./Change Order: 35 Calendar Days ew Contract Time: 755 Calendar Days Submitted for Approval •epared By: its O.ly — B.J.Cash,Cash Construction Signa re Printed Name,Title,Company Date Approvals mtractor: B.J.Cash,Cash Construction Sig ure Printed Name,Title,Company Date ity Project anager: Bill Stablein, Project Manager,CORRZ& Signature Printed Name,Title Date ayor/City anager Alan McGraw,Mayor,CORR Signature Printed Name,Title Date Page 2 of 3 Contract Quantity Adjustment/Change Order w,Danz Project Name: CORR SWDT Ph 5A Quan.Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment Item# Item Description Unit Qty. Unit Price Amount (Days) 305 Bore EO Duct Bank LF 235 $222.00 $52,170.00 306 Grande Bore at Church 1 EA 4"PVC LF 225 $131.00 $29,475.00 0 307 Grande Manholes EA 2 $9,160.00 $18,320.00 308 AT&T Manhole(Material Only) EA 4 $6,675.00 $26,700.00 309 Remove and Fill Trash Area on Mays LS 1 $4,390.00 $4,390.00 310 Fix Existing Leak at Anderson Ave. LS 1 $6,815.00 $6,815.00 311 Gazebo Remove LS 1 $2,135.00 $2,135.00 Deduction of Material Cost for Oncor 12'x 12'Octaganol 312 Manhole LS -1 $7,100.00 -$7,100.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $132,905.00 0 Page 3 of 3 �Jr_ Contract Quantity Adjustment/Change Order rc,r F zv,08/12 Project Name: CORR SWDT Ph 5A Quan.Adj./Change Order No.: 1 Quantity Adjustment Data Contract Time Adjustment Bid Item# Item Description Unit Qty. Unit Price Amount Water Items 168 12"C-900 SDR 14 PVC Pipe LF 1 828 $210.00 $173,880.00 21 182 12"MJ Gate Valve wNalve Box EA 14 $3,000.00 $42,000.00 177 8"C-900 SDR 14 PVC Pipe LF 240 $200.00 $48,000.00 186 8"MJ Gate Valve w/Valve Box EA 7 $2,000.00 $14,000.00 174 6"C-900 SDR 14 PVC Pipe LF 20 $200.00 $4,000.00 185 6"MJ Gate Valve w/Valve Box EA 1 $1,400.00 $1,400.00 172 4"C-900 SDR 14 PVC Pipe LF 110 $190.00 $20,900.00 184 4"MJ Gate Valve w/Valve Box EA 2 $1,300.00 $2,600.00 187 Fire Hydrant Assembly EA 2 $6,000.00 $12,000.00 173 4"MJ Cap(4 EA 4"Cap&6 EA 8"Cap) EA 10 $250.00 $2,500.00 85 8x8 Tapping Sleeve and Valve with 12x8 Reducer EA 1 $6,500.00 $6,500.00 Wastewater Items Pipe,8"Dia. PVC ASTM D2241 SDR26 WW(all depths), 68 including excavation and backfill LF 245 $140.00 $34,300.00 7 New WW Manhole,48"Dia.,including ring adjustments, 66 lid,interior coatings,etc. EA 3 $6,500.00 $19,500.00 Clean Out Assembly for Pipe,8"Dia.PVC ASTM D2241 SDR26 WW(all depths),including Excavation and 70 Backfill EA 5 $400.00 $2,000.00 Electric Items One each 4-inch Communication line to/from Duct Bank to service provider manhole/handhole(for Additional 90 Grande 4"Comm. Line) LF 1687 $63.00 $106,281.00 7 98 Round Rock Duct Bank 52"Manhole EA 2 $12,000.00 $24,000.00 100 Oncor 12'x 12'Octaganol Manhole. EA 1 $30,000.00 $30,000.00 112 AT&T-Manhole EA 1 $12,000.00 $12,000.00 17"x30"x12"concrete electrical pull box plus AASHTO H- 20 traffic-rated steel non-slip cover,as specified, 117 complete in place(for Grande Handholes) EA 3 $2,000.00 $6,000.00 240 Oncor Pedestal EA 3 $500.00 $1,500.00 Coordination with Time Warner Cable including coordination of installation of wiring(For Grande 105 Communications) EA 1 $9,000.00 $9,000.00 266 PVC CONDUIT(SCH 80)(2")(TXDOT-618) LF 235 $30.00 $7,050.00 267 PVC CONDUIT(SCH 80)(3")(TXDOT--618) LF 1575 $30.00 $47,250.00 268 PVC CONDUIT(SCH 80)(4")(TXDOT-618) LF -200 $32.00 -$6,400.00 110 Time Warner Telecommunications-Manhole EA -1 $12,000.00 -$12,000.00 94 EO-Duct Bank(Electrical&Communications) LF -235 $180.00 -$42,300.00 Stripping $0.00 201 Elim Ext Pav Mrk&Mrks(24") LF 190 $8.00 $1,520.00 $0.00 TOTALS: $567,481.001 35