CM-2015-839 - 7/24/2015 STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: KASBERG, PATRICK& ASSOCIATES,LP ("Engineer") ADDRESS: 1008 South Main Street, Georgetown,TX 78626 PROJECT: Dove Creek DrainaEe Improvements This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Kasberg, Patrick &Associates, LP, hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 12th day of December, 2014 for the Dove Creek Drainage Improvements Project in the amount of$28,965.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on May 12, 2015 to amend the scope of services and to increase the compensation by $8,005.00 to a total of $36,970.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$5,485.00 to a total of$42,455.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $5,485.00 the lump sum amount payable under the Contract for a total of$42,455.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rev.12/01/08 0199.1429;00338272 84275 1 0A 1270 15 KASBERG, PATRICK & ASSOCIATES,LP By: 44 Date CITY O OUND ROCK AP ZED AS TO FORM: By: Steph L. Sheets, City Attorney 7-2v � Date Supplemental Contract Rev.12/01/08 0199.1429;00338272 84275 2 ADDENDUM TO EXHIBIT B Engineering Services Exhibit B 'Engineering Services" contained in the Contract for Engineering Services between the City of Round Rock and Kasberg, Patrick & Associates, LP dated December 12, 2014 is amended by Supplemental Contract No.2 to add the following Final Design services_ When and as requested by the City, the Engineer will provide Final Design services for erosion mitigation to protect a public wastewater line;typical services may include: 1. Conduct field visits to the site to assist evaluating project site area and existing erosion extent for limited project site area. 2. Evaluate contributing drainage basin areas and analyze peak flow rates for 2, 10, 25 and 100 year storm events. 3. Analyze stream flow velocities and low water crossing using HEC-RAS. Incorporate survey cross sections provided by the City. 4. Determine rock rip rap sizing based on tractive force theory. To the greatest extent possible, place notes to instruct contractor to use on-site materials, which includes large diameter rock or broken concrete and reinforced concrete pipe. Design concrete weir overflow to be used as low water crossing. 5. Prepare construction exhibits. Anticipate no more than two sheets. 6. Collaborate with City Staff regarding project scope and final design. 7. Provide construction administration, which includes on-site visits and answering contractor questions as necessary. Time may include final walk through. 8. Meet with property owners to answer questions as necessary. ADDENDUM TO EXHIBIT C Work Schedule Exhibit"C Work Schedule" contained in the Dove Creek Drainage Improvements Contract for Engineering Services between The City of Round Rock And Kasberg,Patrick&Associates, LP dated December 12, 2014 is amended as shown below for the services added under Supplemental Contract No.2 Addendum to Exhibit B. Specific deadlines for some services are shown below;all services shall terminate September 30,2015. Deadline Task Within 1 week of Notice to Proceed Conduct field visit. Within 1 week of Notice to Proceed Evaluate Drainage Basin Area&Peak Flows Within 1 week of Receiving survey data Analyze Velocities using HECRAS&Survey Cross Sections Within 1 week of Receiving survey data Size Rock Rip Rap using tractive force theory Within 2 weeks of receiving survey data Prepare construction exhibits Within 1 week of preparing construction Collaborate with City Staff to discuss final design exhibits As needed during construction period Construction Administration Within time specified by City Meet with local residences as necessary ADDENDUM TO EXHIBIT D Fee Schedule Exhibit D"Fee Schedule"in the Contract for Engineering Services between the City of Round Rock and Kasberg, Patrick & Associates, LP dated December 12, 2014 shall be deleted in its entirety and replaced under Supplemental Contract No.2 with the following: Total Total Loaded Other Task Labor Hours Labor Cost Direct Costs Subconsultants TOTALS Task 1:Preliminary Design 72 $ 8,350.00 $ - $ - $8,350.00 Task 2:Final Design 184 $ 20,615.00 $ - $ - $20,615.00 Task 3:Bidding and Construction Administration 58 $ 8,005.00 $8,005.00 Task 4:Erosion Mitigation Design and Construction Admin 49 $ 5,485.001 $5.485.00 GRAND TOTAL= 256 $ 28,965.00 $ - 1 $ - $42,455.00 Fee Wurl(sheet Dove Creek Drainage Improvements-Supplemental Contract 2 Task 1—final Design Clerical CADD Tech Grnduate Project Project principal Total Hours Engineer Engineer Manager Conduct Field Visit 1 2 3 Evaluate Drainage Basin Area&Peak Flows 2 4 1 7 Analyze Velocities using,HLCRAS&Survey Cross Sections Ca 1 7 Size Rock Rip Rap using tractive force theory 4 1 5 Prepare construction exhibits 16 2 I 19 Collaborate with City staff 1 1 2 Construction Administration ,Meet with property owners 2 2 FTota,,1E14ours for Final Design U 18 2U 1 1 i) U e S 55.00 S 100.00 S 110.00 S 135.00 S 160.00 S 200.00 lmiunry DcsignTotal Cost S - S 1,800.00 S 2,200.00 S+ 1,485.t1U - S - S 5,485.00 City of Round Rock .1 ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 2 with Kasberg, Patrick& Associates, LP for the Dove Creek Drainage Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 7/24/2015 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: Indexes: Attachments: SC#2_KPA DoveCreek_CM7.24.15.pdf, Map_DoveCreek_CM4.11.14.pdf Department: Utilities and Environmental Services Text of Legislative File CM-2015-839 Consider executing Supplemental Contract No. 2 with Kasberg, Patrick&Associates, LP for the Dove Creek Drainage Improvements Project. In April of 2014, the City completed a drainage analysis for the southeast portion of the Dove Creek neighborhood to determine the feasibility of implementing drainage improvements to reduce the frequency of street inundation and property flooding that has been experienced during intense rain events. Based on the results of this analysis, the City then identified funding in order to hire a consultant to design improvements that would improve the drainage in this area. In December of 2014, the City Manager approved a Contract for Engineering Services with Kasberg, Patrick &Associates, LP for the Dove Creek Drainage Improvements Project. This Engineering Services Contract provided plans, specifications and related documents necessary for the City to install the aforementioned improvements. In May of 2015, the City Manager approved Supplemental Contract No. 1 in the amount of$8,005 for bidding and construction phase services. During a site visit with a resident who had some concerns about the current project in the Dove Creek area, substantial erosion was identified downstream. After investigation by City staff, it was determined that the erosion was compromising the City of Round Rock Page 1 Printed on 712312015 Agenda Item Summary Continued(CM-2015-839) integrity of an existing wastewater line, and it would be more beneficial and cost effective to address this problem with the current project. This Supplemental Contract No. 2, in the amount of$5,485, will address these concerns and bring the total contract amount to $42,455. Staff recommends approval. City of Round Rock Page 2 Printed on 712312015 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Iters Departlnerit Name: Utilities&Environmental Services Project Name: Dove Creek Drainage Improvements Project Mgr/Resource: Lance Shellenberger ContractorNendor: Kasberq,Patrick&Associates,LP Council Action: E ORDINANCE a RESOLUTION Agenda Wording City Manager Approval CMA Wording Consider executing Supplemental Contract No.2 with Kasberg,Patrick&Associates,LP For the Dove Creek Drainage Improvements Project. Attorney Approval Attorney ,/ Date Notes/Comments i O:\wdoxlSCClnts10199\14291MISC100338394.XLS Updated 6/3/08