CM-2015-852 - 7/31/2015 Pagel of 3 Contract Quantity Adjustment/Change Order rev,06/12 Department: Building Construction Division Project Name: Rock N'River Date: 6/26/15 City Project Change Order/Quantity ID Number RRIVR phase2 Adjustment No. 1 Justification Changes due to Permiting SUMMARY Amount %Change Original Contract Price: $6,728,887.00 Previous Quantity Adjustment(s): This Quantity Adjustment: $42,362.00 Total Quantity Adjustment(s): $0.00 Total Contract Price with Quantity Adjustment(s): $6,728,887.00 Previous Change Order(s): 0.00 This Change Order: $42,362.00 0.01 Total Change Order(s)To Date: $42,362.00 0.01 Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: $6,771,249.00 Difference between Original and Adjusted Contract Prices: $42,362.00 Original Contract Time: Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 0 New Contract Time: 0 Submitted for Approval Prepared By: �1MV'3 W,Ih., " a.►sk- Vh�, Signature Printed Name,Title,Company U ilate Approvals Contractor: ALI C.,N WL �Signa�ture Printed Name,Title,Company Date City Project '=✓/ /- ,cam o� Manager: ! / ` GAG 7- ignature Printed Name,Title Date Mayor/Ci Manager 0,46q6w Sigitture PHrited Name,Title JDate cel-2Z ry Z Page 2 of 3 Contract Quantity Adjustment/Change Order rev,09/12 Project Name: Rock N' River Quan.Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment Item # Item Description Unit Qty. Unit Price Amount (Days) permit revisions per DSO upgrade to 1 DR14 water pipe 1 $5,157.00 $5,157.00 RFI #4 WL crossing under existinf reclaim 2 line 1 $6,800.00 $6,800.00 3 MH #1 Cone section 1 $405.00 $405.00 4 Add Rock Theming Alternate#1 1 $30,000.00 $30,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $42362.00 0 OCHASCO Change Proposal Pricing Sheet Rock N'River FAC Expansion Project Chasco Project No:15039 CONSTRUCTORS Kimley Horn Project No:063895008 6.30.15 Chasco CP No: CP-004 Rock theming CORR No: Alternate#1 from Bid Prepared by: Kellin Neiman Description: Aditional Rock Theming per Alternate#1 from Bid Qty LABOR MATERIALS SUBCONTRACT ITEM Cost code DESCRIPTION j UNIT I TOTAL UNIT TOTAL UNIT TOTAL TOTAL Atlantis Aquatics 1 LS 0.00 $0 0.00 $0 28500.00 $28,500 $28,500 SUBTOTALS $0 0.00 $0 0.00 $28,500 $28,500 Further description: Overhead $0 Sales Tax Materials(only) $0 SUBTOTAL $28,500 Fee $900 SUBTOTAL $29,400 Insurance $300 P&P Bond $300 GRAND TOTAL $30,000 Change Proposal Unit Cost Pricing Sheet Rock N'River FAC Expansion Project Chasco Project No: 15039 OCHASCOCONSTRUCTORS Kimley Horn Project No: 063895008 22 June 2015 CHASCO CP#001 -DSO PLAN REVISIONS CORR RFP# BY: Kellin Neiman DESCRIPTION: PLAN REVISIONS PER KIMLEY HORN'S RESPONSE LETTER DATED MAY 8, 2015 AND ASSOCIATED PLANS Cl,C2,LA4, L5&C5 DESCRIPTION QTY UNIT TOTAL DIRTWORK/PAVING/EROSION CONTROLS SAWCUT -57 LF DEMO ASPHALT PAVING -200 SF DEMO CURB&GUTTER -57 LF EXCAVATION -93 CY BACKFILL CURB -168 LF SUBGRADE PREP -279 SY 2"ASPHALT PAVING -204 SY 10" FLEX BASE -155 TN HAUL OFF SPOILS -8 LD SUBTOTAL $ (10,076.00) UTILITIES 12"GROUTED ROCK RIPRAP 46 SF 24" END TREATMENT 1 EA TIE TO EXISTING WWL -1 EA TIE TO EXISTING WWMH 1 EA TIE TO EXISTING WL -2 EA 8" FULL BODY TS&V 2 EA 8" BENDS 9 EA SUBTOTAL $ 9,088.00 SITE CONCRETE CONCRETE STEPS 15 TRFT SIDEWALK 32 SF 6" DUMPSTER PAD 348 SF RIBBON CURB -168 LF SUBTOTAL $ 1,658.00 DR-14 UPGRADE FROM DR-18 PER PLANS TO DR-14 DSO SUBMITTAL REVIEW 1 2,012 1 LF $ 4,487.00 ADDITIONAL DAYS REQUESTED 0 Y Change Proposal Unit Cost Pricing Sheet Rock N' River FAC Expansion Project OCHASCOChasco Project No: 15039 CONSTRUCTORS Kimley Horn Project No: 063895008 6.23.15 CHASCO CP#002R-WL CROSSING AT RECLAIM CORR RFP# BY: Kellin Neiman DESCRIPTION: NEW 8"WL HAD TO GO UNDER THE EXISTING RECLAIM LINE PER RFI#4 RESPONSE. 6.23.15 REVISED FOR WT-10 DETAIL(EXTENDED CASING SECTION). DESCRIPTION QTY UNIT TOTAL DESCRIPTION 45 DEG BENDS 4 EA 8" DI MEGALUGS 8 EA 8" CL 350 DI PIPE- EXTENDED FOR WT-10 DETAIL 60 LF POLYWRAP 1 EA 18"X8"CASING SPACERS 3 EA END SEALS 2 EA 18"STEEL CASING 12 LF SUBTOTAL $ 6,800.00 ADDITIONAL DAYS REQUESTED 0 VAN91 M OMPLING (TYPICAL) (AS REQUIRED) 3/4' TIE ROOS AND BOLTS. 4 MINIMUM NUMBER OF TE ROD FOR SIZES LARGER 'MEN 8` TO Be PROVIDED BY DESIGN ENGINEER (80.000 PSI TENCEL AND PLATED) TIE 8005 (AS REQUIRED PROPOSED STORM SEWER UNE Y EXIMM WATERLINE EXISTING WATEMJNE 2' MINIMUM FROM �1 PIPE CASING b' MIM b' MIN SEAL OR GROUT ENDS ON PIPE CASING 46 RESTRAINED JOINT DUCTILE 21 IRON FITTINGS. MEGA LUGS ARE ACCEPTABLE USE ALL PIPE TD BE DUCTILE IRON SPACER FOR CARRIER PIPE (" (SEE PIPE CASING DETAIL) CONCRETE BLACKING Azul SIZE AND RODDING STEEL PIPE CASINO CENTERED ON PROPOSED STORM SEWER LINE REI7UIRENEN75 SHALL BE PROVIDED BY DESIGN ENGINEER AND THE I.D. OF PIPE CASING SHALL INCLUSED IN THE SIGNED & BE AS SPECIFIED IN DETAIL SFALEO CONSTRUCTION PLAINS CM) (WT-18) OR LARGER. 1. DESIGN ENGINEER MAY SPEC. A COMBINATION RESTRAINT SYSTEM OF RESTRAINED JOINTS AND CONCRETE BLOCKING OR TIE RODS AND CONCRETE BLOCKING. REMMMMMMCOQ CITY OF ROUND ROCK DRa�N10NO: : ON F'II.UZ E AT PUBLiC WORKS APPROVED 12-01-10 WATERLINE AND STORM SEWER LINE n'TE CROSSING DETAIL THE AIBCBn%cT/II'IwmR ASBDYBB ROU�DRDCT.TEXAS ItRRY.0 ft[c'O\FV03i RIII MMNSMM FOR THE APPROPEM (TYPE 2) USE OF THIS DETAIL. (NOT TO SCALE) Change Proposal Unit Cost Pricing Sheet Rock N' River FAC Expansion Project Chasco Project No: 15039 OCHASCO CONSTRUCTORS Kimley Horn Project No: 063895008 22 June 2015 CHASCO CP#003 MH#1 CONE SECTION CORR RFP# BY: Kellin Neiman DESCRIPTION: RAISE EXISTING MH#1 CONE SECTION PER EMAIL DATED 6.18.15 DESCRIPTION QTY UNIT TOTAL DESCRIPTION REMOVE EXISTING CONE & INSTALL 18" RISER AND 3" GRADE RING 1 LS SUBTOTAL $ 405.00 TOTAL is ADDITIONAL DAYS REQUESTED 0 IOUCity of Round Rock ND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider execution of Contract Quantity Adjustment/Change Order No. 1 with Chasco Constructors for Rock N River FAC Expansion Project increasing the total contract price by$42,362.00 Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 7/31/2015 Dept Director: Chad McDowell, General Services Director Cost: $42,362.00 Indexes: 2014 General Obligation Bonds Attachments: Change Order No. 1, LAF- Change Order No. 1 Department: General Services Department Text of Legislative File CM-2015-852 This change order includes adding Additional Rock Theming to match existing, and permit revisions to upgrade water pipe and Waterline crossing under existing reclaim water. Staff Recommends Approval Cost: $42,362.00 City of Round Rock Page 1 Printed on 7/31/2015 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: General Services Project Name: Change Order#1 Rock N'River Expansion Project Mgr/Resource: Travis Wilkes Contractor/Vendor: CHASCO Council Action: ORDINANCE RESOLUTION Agenda Wording City Manager Approval CMA Wording Consider execution of Contract Quantity Adjustment/Change Order No. 1 with CHASCO Constructors for Rock N' River FAC Expansion Project increasing the total contract price by$42,362.00. Attorney Approval Attorney Date 1-7 Notes/Comments O:\wdox\SCCInts\0118\1501\MISC\00338398.XLS Updated 6/3/08