Loading...
CM-2014-494 - 8/22/2014City of Round Rock RIX1NO ROCK TIXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with Layne Heavy Civil, Inc. for the Treated Water Transmission Line - Segment 3 Project. Type: City Manager Item Governing Body: City Manager Approval Agenda E3ate: 8/22/2014 Oept Eirector: Michael Thane, Director of Utilities and Environmental Services Cost: $45,719.49 Indexes: Self -Financed Water Construction Attachments: .C3-QA#2_ Treated WLSeg3_Layne_CM8.22.14 Department: Utilities and Environmental Services Text of Legislative File CM -2014-494 The Treated Water Transmission Line - Segment 3 is the final segment required to deliver BCRUA treated water to the City's transmission system from Lake Travis. Segment 3 consists of approximately 12,000 linear feet of 48 -inch waterline. The horizontal alignment of Segment 3 generally follows the future -tension of New Hope C>riv- from Ronald Reagan Blvd. to C.R. 175 north of RM 1431 . The waterline will connect to the east end of Treated Waterline - Segment 2C at Ronald Reagan Blvd. and terminate at an existing 48 -inch stub -out at the northwest corner of the RM 1431 and C.R. 175 intersection and will be constructed within a City of Round Rocic Waterline Easement. Changes requested by City staff members regarding Tracer Tape in the backfill, a change in piping at the dosing Station, and a different brand of PLC (Programmable Logic Center) account for $29,904.99 of the $45,719.49 of the Quantity Adjustm-nt/Chang- Order No. 2. The remaining $15,814.50 is for additional cement stabilized sand backfill necessary in crossing C.R. 272 and additional fencing on the Kri-nk- property. In June of 2014, Quantity Adjustm-nt/Chang- Order No. 1 in the amount of %12,487.39 was -x-cut-d, which modified the original contract total from $5,725,729.25 to $5,738,207.64. please execute Quantity Adjustment/Chang- Order No. 2 in the amount of $45,719.49, which brings the new contract total to $5,783,927.13. Staff recommends approval. City -r Round R- _.. 1 Printed — 8/22/2014 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: utilities & Environmental Services Project Mgr/Resource: Jeff Bell Council Action: ORDINANCE Agenda Wording xx City Manager Approval Project Name: Treated Water Transmission Line — Segment 3 ContractorNendor: Layne Heavy Civil, Inc. ® RESOLUTION %,tvlH woramg Consider executing Quantity Adjustment/Change Order No. 2 with Layne Heavy Civil, Inc. for the Treated Water Transmission Line — Segment 3 Project. Attorney Approval -4 nAttorney " Date Notes/Comments 0:\wdox\SCClnts\0199\1405\MISC\00308827.XLS Updated 8/3/08 a �acrc,?gcw� Project Name: Treated Water Transmission Main No. 3 Contractor: Layne heavy Civic, Inc Engineer. Jacobs Engineering Group, Inc. Pogc I of 3 Contract Quantity Adjustment/Change Order Date: 8/6/2014 Change Omer/Quantity Adjustment No. 2 ustwkation ee the following enclosed documents: (1) CORR-requested CPR #3 with cost information from Layne Heavy Civli, (2) CORR-requested CPR # with Cost information, (3) CORR-requested Request for Change Order No. 002, (4) CORR-requested Request for Change Order No. 006, (5 DRR-requested additional fence replacement. Original Contract price: Previous Quantity Ad)ustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjust nent(s): Previous Change Order(s)- This Change Order: Total Change Order(s) To Date: Original Contract Price Plus Change Order(s) Pius Quantity Adjustment(s): Original Contract'Tinie: ContractTime Prior to this Change Order: Contract Tone with AN Approved Change Orders: Amount % Chan $5,725,720.25 $0.00 $0.00 $5,725,720.25 $12,487.39 0.2.2% $45,719.49 0.80% $58,206.88 1.02% $5,783,927.13 342 calendar days (Final) 344 calendar days (Final) 377 calendar days (Real) Glenn A. Brid9w, P.E., Project Engineer Jacobs En ineermGrou , Inc. 4- Signahrre Print Name, Title andCompany Date se I Approval: ✓' & rs City of Round /iignature Printed Name, Tale and Company Date Rock Approval. Printed Name, Tile Date City of Round Igha Rock r� 1 �fA� i6d� (� Approval: � 1\ _1v[JM1C)OC� lJ�b.A rykiev- � L,/1 Title 0-M- D64- Ito Date Contract Quantity Adjustment/Change Order AOUND AOCIC, TF�CA5 Project Name: Treated Water Transmission Main Segment 3 (TM -3) Quan. Adj./Change Order No.: Chane Order Data i'agc 2 of 3 Contract Time Item # Item Description Unit 59MMIM Unit Price Amount Adjustment a IM Piping revisions per CPR #3, dated lune 1 2, 2014 LS 1 $13,803.07 $13,803.07 6 PLC revisions per CPR #4, dated lune 9, 2 2014 LS 1 $13,979.65 $13,979.65 27 Detector Tape addition, per Request for Change Order No. 002, dated lune 6, 3 2014 LS 1 $2,122.27 $2,122.27 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 o.00 Contract Quantity Adjustment/ Change Order - ROUNb ROCK, t4[/LS Project Name: Treated Water Transmission Main Segment 3 (TM -3) Quan. Adj./Change Order No.: uantfir Adiustment Data Page 3 of 3 Contract Time Adjustment Bid Item # Item Description Unit Unit Price Amount Cement Stabilized Sand Backfill, per Request for Change Order No. 006, dated 2.11A July 9, 2014 CY 44.9 $105.00 $4,714.50 Permanent Fence Replacement (5 -strand barbed wire), per field directive 3.13 from CORR Inspection Department LF 600 $18.50 $11,100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 00 $0.00 $0.00 $0.00 $0.00 $0.00 TUTAMI $15,814.50 0 CPR #3 JACOBS June 2, 20I4 John Peterson Layne Heavy Civil, Inc. 300 E. Broad Street Fairburn, GA 30213 Re: City of Round Rock, Texas Treated Water Transmission Line — Segment 3 Change Proposal Request #3 Dear Mr. Peterson: 2703 Bee Cavo Road SOe 300 Austin Texas 78746 U S A 1 512 314 3100 Fax 1 512 314 3135 Please provide a cost proposal for the following proposed revision to the subject project: 1. Delete piping, valves and fittings as highlighted on the enclosed Sheet M-3. Please note that the 12" wall sleeves will still be installed in the vault. 2. Add caps or plugs as clouded on the enclosed Sheet M-3. 3. Revise steel pipe Mark 216 as redlined on the enclosed copy of NW Pipe Drawing # SA -13-382-A-1044. 4. Add 16" pipe, fittings and valve as redlined on the enclosed copy of NW Pipe Drawing # SA -13-382-A-1044. 5. Delete piping and fittings as highlighted on the enclosed copy of NW Pipe Drawing # SA -13-382-A-1044. If the proposal is accepted, a change order will be prepared for the work. If you have any questions, please do not hesitate to contact me at 512-314-3182. Sincerely, JACOBS ENGINEERING GROUP, INC. Glenn A. Bridg , P.E. Senior Project Engineer XC: Jeff Bell, City of Round Rock Andy Hedrick, Layne Heavy Civil, Inc. wi enclosures F: VAK810awangructionkhange propml requeswiCM Ni,CPR N1 Mier060214.doc Jaccbs Ergineeri,;g Group Inc, 30'HP LOK PLUG OR CAP — 12'HP LOK PLUG OR CAP { 12'TR FLEX PLUG OR CAP waaoala laoY�i g* �•..� � �mww.� a - -._.�J��_..f" _"-7-. rrnLw+►_ .. l.a�oeers t -__ '�,.�_��d,,rc__ /�,�•_''� roroaaalaa.sMw.rw -4_.l :ra-, ! -www aa'�s- .-nwuasnra �.l.wsr lraaa i i e tl�,� �p - a _,. YerYrr as w r r a.oaaawawlrr ���'!!YY elaa Ifwa�-.. � uwlraarMn 4aYMla• 64w1/w'-.. 1 �i � w wanaa lira- —. - 4tWia wamMrwla w,awar•rt wOwa-. _lrLMall,r rwYl !w•w•wa.Ll�wlw� awitn woiaaY !an �� wlanaa !an -!ma lCaawrY ,._.Iwwaw .•f,!®� �« , .,:.. M4rIMC Ypvwll n�5 !aN .' waYLarala lMV Mllr �wwn Ftff�� -A�-, ...� w+wlwrlo � I � � �wL,_. Mt!_., w� � aawr•.wael rNe s l I - 4w+lM. 1 r ...� 4•!lr �... _ .t __._�� _.._-wj r .._... ._�� __-•1.7a w' MUM", z .. -... �PW lnwamarl `}.,. `---«aawlrraarlra '. w.a wwr . !!ver wwwwwwm, 30'HP LOK PLUG OR CAP m • ,'. ...frNlaar ` Ypl.w r 1 a1 1, tawMlL•4aa� Ilrwwlaw rw aaweaeawewlrr �rlwar- raalRi• a !€. wlaw r.00 __ _ ___. _� P�LLIr_-_,- __ ._. .... ___w. _ AN 'IaL ` wrrarArYAaO�Mlrfld�a0 i�l�O a Y1110 OOM.Lr wvmftla�Y a wrr11601A rM�wlMialail�llC:] z, 1.aaMlawaa.MaarrrL.ML.IMMw.rMawML walnwlaa—WN WIwrMMaaarraww aoarrwws+alloa wMMlaMtalaanwwYaawYwYwlMYaa lwwsrawwwaalw�wrawaw wallaYraawLralwsrYr nrla wawawrawurnwwawA ,VALVES AND FITTINGS TO BE DELETED raMMo+wrwlwesaw+waarwalawL a uaawewawlaa,wLrwarr•a0wrwwol rrrYrwLnnaarwraalraaw4rlw a nwYosaasn.MwrMo,wwuwwrwar awrL wr.awrmrwoawaawaa a rrawalagraMsraawawa wLlirawwwwelaw0�aaawaaanc swrawsYraMaowara gpeaaule aMLtw+Lrtlr.rrawuwtww armraaww4raYaalsrwrlr rwrsr,Mwrmlelrw..aaaa r wswsYaa,wrlaaaYalwrLwra rmaa■aa,rw/raraawalll. t lMa•aeaa¢rLra,lra aa•oaranMcaaaaw alaewMr aaarrmwlawlaMMaaaMwr s a uawYw,araaLurrwYwaYal a mwwrwarLwwwwawarwwLwar aYwwwwua aYrrosoLwwaraMlwaae MllwaarwLaaewraw.rwaruY.ww s rwraiYYfww4iwMM1aYP1OaIwawY1 aalrRaL.wMM�IOIYYIMrNNawa omm"MiMm.aarllaNra,a®YMr•aa,wWrlr• wA1gY1WLw,alllalrlL11Rr11M•wa,O01 .L�Mn)aWtOY.Mra►L l/aMlfYrlallaaalwRYYM,wYawawwwnLe.rOL wwrr.ur.was a.wrramauwwOwwL.MwaMae w Malwww,waawwrawolawmawraalw waw/wrlwrwlaraMUNw aru/awnwwMMwMorMMYaaarlwwa alrsawawauaarL rrwrllaOwUaMllaMw.Maaw/MMarl w/raaarla,rarrw waver rraMYwew r.m,awerawraua.awa.rwswarMer�w a ra0.wwawwwarwrYwaw.rawlr�l w111aMawaa,IwlLMwwalMArwrlwar 4wOlawarwarw MflgaawwLaaaw•I.all.« MaNMraiaOalMlMaaaMlYaNw/aawllw•lar raawwAaalMtrawgLwawwrrwaq rlwwwYaraMlrswwaawarMwaw rorn.L 2iSaEO WITR o*R.-v3 nrowawwrwowwaaalM� wMtraMYw.Lom.wownwla�aaasrswa .arrraMarwrarar (v I+ r - -- �aararrw ��0 TREATED WATER TRANSMISSION UNE tasaam SEGMEM 3(i" .11a 1 .._.._........... L JallrllYta k ..-�r... _.�.-_. ave as�aals,vert a0. eeear " a>t w Mh METER I PLOW CONTROL VAULT rw `o,e• aarraa T f „a>arY Isl r1 ala ala * PROCESS MECHANCAL PLAN d.r,wasealwl •w M7 Y NMId 335 3Nn wivw .Mit WM Me "1 U) Qom_ N W ku X T-. kk " Slo 5, lV 17 O M7 O A seoc-v-zacc�-vs+� sono M M HaLv" NMId 335 3Nn wivw .Mit WM Me "1 NM 10 N+u -- 2ktw-1 311JOdd }s Zz ate€;Q9 C O 09 ds aU, H cr �friuvis O rprptnaiM Z S[N,M 6ge Qom_ N Q H " Slo 4 ti Il Lt+96 T 4 N ]C IE s3+� �a S m W W N glut" Np�iiro k LU 2 � � rta v ru+M a � GM to S W � yt� 3 Igo lM+fi r NM 10 N+u -- 2ktw-1 311JOdd }s Zz ate€;Q9 C O 09 ds aU, H cr �friuvis O rprptnaiM Z S[N,M 6ge Additions/Deletions of Meter Vault Redline Drawina Adds 1. Ferguson Adds: $49,042.47 (48" BFV, 16" Valves, misc. parts, restocking charge) 2. US Pipe: $5,585.45 (30" & 12" Caps) 3. NWP: $ 15,522.04 (Pipe modification for 48" BFV, 16"connection) 4. Labor (Layne): $3,240.00 (placement of 48" BFV, 16" connection) 5. Burden: $1,180.00 6. Added Materials: $2,865.00 7. Transportation: $1,800.00 (extra piping, BFV) S. OH&P: $9,720.00 Total $88,954.96 Deletions 1. 16" Ductile Piping: -$10,150.00 ($58/LF x 175 LF Line Item 2.10A) 2. US Pipe: -$34,629.86 (Listed Item deleted) 3. Ferguson: -$30,372.03 (30" Valves, Manholes, etc.) Total -$75.151.89 Net Chanee in pricing: $13.803.07 Price Quotation # B257841 FERGUSON ENTERPRISES, INC. FERGUSON WATERWORKS #1254 200 PARK CENTRAL BLVD GEORGETOWN, TX 78626 Phone : 512-930-2262 Fax : 512-930-2388 Bid No.......: B257841 Bid Date...: 07/18/14 Quoted By: JTC Customer.: LAYNE CHRISTENSEN COMPAN' TREATED WATER TRANS SEC 3 30" BYPASS DELETION 300 EAST BROAD STREET FAIRBURN, GA 30213 Cust PO#..: ROUND ROCK, TX Cust Phone: 303-287-7700 Terms........: NET 10TH PROX Ship To......: LAYNE CHRISTENSEN COMPANY TREATED WATER TRANS SEC 3 300 EAST BROAD STREET FAIRBURN, GA 30213 Job Name.: CPR 3 DELETE RESTOCK Item Description Quantit3 Net Price UM Total CPR #3 ADDITION/DELTION 30" BYPASS DELETION **:*ss.s:s*•sssse�*ss*:**• DELETED ITEMS SP-R400RG3 30" 40ORG 32.00 3+8X10 CPLG 2 2,705.22 EA 5,410.44 MB3211060L 30 FLG OL BFV 2 2,168.86 EA 4,337.73 FBSSI6S30 30 SS 316 FLG BOLT SET 4 686.60 EA 2,746.40 SP-R400RG1 12 400RG-13.20 FLEX REST COUP 3 2 842.20 EA 1,684.40 FNWNBGS61 12 316SS 150# RR FF 1/8 FLG PKG 2 68.99 EA 137.98 SUBTOTAL 14,316.95 END OF QUOTE Subtotal: $14,316.95 Inbound Freight: $0.00 Tax: $0.00 Order Total: $14,316.95 Qa90ed prion are band open receipt or the 19061 gwMhy be hamediate shipment (41 bound. SafPNEWTS BEYOND db IIOVRS SHALL BE AT TIIE PRICE IN EFFECT AT TIME OF SiIIPNENr UNLESS NOTED OTHERWISE. Seger am responsible for delays, lack of product or ieerevse of pricing due to coma beyond our controL owdlvr based open Loci. State and Federal laws governing type of products that tam be said or put Mia commerce. This Quote Is offered contingent upon the Borer's acceptance of SdIve2 terms and condidens, which an lecerporaW by reference and Initial either [mowing thin docomeel, or an the web at hltp:rfwoheleyaa,wmherma_waiUlewsSukbtml. Govt Buyers: AN keno quoted are open market mini noted otherwise. O O co co co O W I D N �N^- � O CNi. 'Oen N L0C3 t00 000 qj 'i CO 1`. r Oi �� c CC C7 117 Cv'! 0D ko m CP W m w I3' w m N GO ti C vr O N O O to ill N C2 N int 69 CA M :`' MCf) 40 cD .c� EA � � � � ..�.. V 6N9 � M !g Cli t¢CIL Ii f�i w ual w w i i 0 t W v y' > O C) O 0p O O Cid N O tD r ^ O CN'i c0�7 N ►0in C]. co CO O ^ CO r N ty9 47 M � r CO in CA CC5 C'D ih Cd V: CC) ltd �- O CA O -, Cr- b9 tog, FR N 00 f% CV V O N cn 00i t00 O C� ti N N b9 60,11 tH T � EM9 69 54 ER 69 69 H !A N CI O N CJf co r O M -Kr CA C M r U') cD Lo LO CA O C) fti M N tt M 00 N CA to r- cr M W y r M ti Q ti f.- of to M C) r M r v QJ C r r CV � N Nx 7 0 4 CT, J C9 J cl J J (7 CO r` s cn } O co `Cl' ti O C r C5 ti M N r N CV N to u CJ L J� 0 0 0 H C7A C LU h uj H _•`-IJ Gli L`` li I.i CL CL 4 O O O N N M ^ c—? M ^ Q r cli co U Q U u a U U Q a� a� Q j m j U ¢ Q Q¢¢ m M J m U Q Co -:1¢ V v C� CMn en in 1n -j U 1n Q 11i� O 1n U L, U � 4a < ; U a 0. LLJ mJj � 0'.) c [L U U 15 a s o ['a a_ t- �- v a x a. O( U O® O J O O O U O LL, O ~ .l J J a m Y a LL a W W W LL W IL CL a r u LL 11_ LL U cL -W 11J X O X o X LA- x X X� x LJf_ L W M M M 3 J Lll d. W _l ,l W LC W• W W --f w a x y LL LL a f-- a r a a a Z: R m O cn O N GY O Q cn F- W p p p O O O O O O N CD t`p c`C? O O M 3 a M M M M M M z ¢Q Q¢ W Coil W W W 111 W W toil LJ t Lll L� W W W tll cj 1L 0 y � Z m O coO N ® Northwest Pipe Company CHANGE ORDER 351 LONGHORN RD SAGINAW,TX 76179 TELEPHONE 817 847-1442 FAX 81 232-0372 Layne Heavy Civil Change Order # 5 Attn: John D. Peterson June 11, 2014 Ronald Reagan Blvd and County Road 272 164nch FINW Bypass Leander, TX 78641 NWP Order #: 89268 SAP #: SA -13-382 City of Round Rock Treated Water Transmission Line - Segment 3 Submltted by: Peter Kientzte Quantity Description Unit Price Amount 1.000 16 -Inch Flanged Outlet $2,853.45 $2,853.45 1.000 24 -Inch Manway $5,587.85 $6,587.85 2.000 Flange Attach for 8FV $3,040.37 $6,080.74 -Total:1 1 $16,522.04 Remarks: Please sign and return one copy of this Change Order sheet indicating your acceptance of the cost. We will need this returned prior to the start of fabrication. All Terms and Conditions per the original Confirming Scope Letter shall apply. Thank You. Accepted by Date Customer Name / Title NWP Track Record # 875054 Printed Jun 11, 2014 02, 05 PM 1 of 1 Round Rock Water Transmission Seament 3(TM3) Request for Chan a Order Number 004 Add Date 6/24/2014 Request for Change By: Layne Heavy Civil 1775 E. 69th Ave Denver, Colorado 80229 Reason for Change and Description Delete all Piping, Valves & Fittings as High lighted on Sheet M-3. Note that 12" wall sleeves will still be installed. Add Caps or Plugs as clouded on Sheet M-3. Revise steel pipe MK 216 as redlined on NWP Drawing 8 SA -13-382-A-1044. Add 16" Pipe, fittings and valve as redlined on NWP Drawing SA -13-382-A-1044. Delete Piping and Fittings as highlighted on NWP Drawing 382-A-1044. Meter Station Add/Deletes Requested Change Order Value Ferguson $ 34,725.52 US Pipe $ 5,679.08 NWP $ 15,522.04 Labor $ 3,240.00 Burden $ 1,180.00 Added Material $ 2,865.00 Transport $ 1,800.00 OH&Profit $ 9,720.55 Total $ 74,732.19 Additional Time for Change: Days 6 SA-13- Round Rock Water Transmission Segment 3(TM3) Request for Change Order _ Number 004 Delete Date 6/24/2014 Request for Change By: Layne Heavy Civil 1775 E. 69th Ave Denver, CO 80229 Reason for Change and Description Delete all Piping, Valves & Fittings as High lighted on Sheet M-3. Note that 12" wall sleeves will still be installed. Add Caps or Plugs as clouded on Sheet M-3. Revise steel pipe MK 216 as redlined on NWP Drawing p SA -13-382-A-1044. Add 16" Pipe, fittings and valve as redlined on NWP Drawing SA -13-382-A-1044. Delete Piping and Fittings as highlighted on NWP Drawing SA -13-382-A-1044. Meter Station Add/Deletes Requested Chanee Order value 16" DP $ (10,150.00) $58x175' Line Item 2.10 A US Pipe $ (34,629.86) Deduct from Line item 4.1 Ferguson $ Ferguson has stock item Labor $ $44,688.98 No return Burden $ - Line item 4.1 Added Material $ - Transport $ OH&Profit $ Total $ (44,779.86) Additional Time for Change: Days Q CPR #4 JACOBS" June 9, 2014 John Peterson Layne Flcavy Civil, Inc. 300 E. Broad Street Fairburn, GA 30213 Re: City of Round Rock, Texas Treated Water Transmission Linc—Segment 3 Change Proposal Request 1w Dear Mr. Peterson: 2705 bee Cave Road. Sudo 300 Austin, texas 78746 US A 1.512.314 3140 Fax 1512,314 3135 Please provide a cost proposal to revise the specified Allen Bradley products to products described in the following Modicon Product Data Sheets (topics enclosed): rition Modi n Pmducl Data Sheet PLC BMXP342020H Power Supply BMXCPS3020H Discrete Input Module BMXDDI1602H Discrete Output Module BMXDRA1605H Analog Input Module BMXAMI0810H Analog Output Module BMXAMO0410H Backplane BMXXBP0600H Memory Card BMXRMS008MPF Programming Software UNYSPUSFUCD80 If the proposal is acceptcd, a change order will be prepared for the work. if you have any questions or need additional information at this time, piease do not hesitate to contact me at 512-314-3182. Sincerely, JACOBS ENGINEERING GROUP, INC. Glenn A. Bridg P.E. Senior Project Engineer XC: Jeff Bell and Brandon Pritchett, City of Round Rock Andy Hedrick, Layne Heavy Civil, Inc. w! enclosures IL, WJXK810G=nsuuiai*u elgnge propoul regnntsACPlt 04.CPH N4 kIt:060414.doe Jacabs Engonea,ing Group Inc Round Rock Water Transmission Segment 3(TM3) Reouest for Change Order Number 004 Date 6/25/2014 Request for Change By: Layne Heavy Civil 1775 E. 69th Ave Denver, Colorado 80229 Reason for Change and Description Provide cost proposal to revise the specified Allen Bradley p the product list attached to Change Proposal Request #4. Requested Change Order Value Labor $ - Burden $ - Rent $ - Fuel $ - Tools $ - Material $ 12,091.00 Transport $ 75.00 OH&Profit $ 1,813.65 Total $ 13,979.65 Additional Time for Change: Days 27 PO Box 859, Florence, Tx 76527 601 South Patterson, Florence, Tx 78527 Phone (254) 793.4344 Fax (254) 7934044 Project: RR Transmission Line Segment 3 Date: June 23, 2014 C.O.R. No. 201411.02- Jacobs PCR#4 - Change to Modicon Change Order Request Description of Change Order Request: Mr. John Peterson, This cost proposal is in reference to attached Jacobs CPR#4, Dated Manch June 9, 2014. Our subcontractor CPUSA has reviewed the change proposal request and has provided a cost for the requested modification. Please make note that CPUSA has provided and submitted Control Panel submittals and Control Panel drawings based upon the Allen Bradley components. Please note that all the present resubmittals are "On Hold" pending a decision on this change proposal request. This change will require a new layout of the Panel Enclosures as well as modifications to the wring diagrams and schematics. They have included those modifications in this proposal. In addition, they have stated that this will add 21 days to the project schedule from the time they receive the approval Any days incurred waiting for a response will need to be added to the 21 days as CPUSA cannot respond to any present submittal review comments until a final decision has been made regarding this new proposed equipment. Please see the attached CP USA Proposal. The following are some notes, clarifications and exceptions we are taking when pricing this proposal: 1) Pricing is good for (21) days from date of proposal. Total Price: 112,091.00 Extension In'nMe Request: We would request an additional (21) days to be added to our contract time to perform this work. If you have any questions, please call me at (512) 848-5032. Sincerely, Sid 7#00d "94Aie Sid Woodmansee Project Manager Control Panels USA Inc. CHANGE ORDER REQUEST 13-6865-01 DATE: June 24, 2014 PROJECT MANAGER: Sid Woodmansee COMPANY NAME: T. Morales Electrical PHONE: (512)848-5032 PROJECT: City of Round Rock — Treated Water Transmission Line Segment 3 DESCRIPTION OF CHANGE: CPR #4 - Change PLC to Modicon Sid, As requested by CPR #4 and the email sent on 6/9/2014, CP USA proposes to provide the Modicon products specified therein. This change order shall include the cost of equipment, CAD time, project management and administrative time. Please keep in mind that prior to this RFP, CP USA had just sent out a full submittal for all equipment and drawings. Thus, CPUSA will have to incur additional design, CAD, project management, and administrative time to swap to Modicon. As such, CP USA proposes a Lump Sum Contract in the amount of $10,608 to provide the above mentioned equipment and the associated man hours required to accommodate this change proposal request. In addition, CP USA requires an additional 3 weeks to provide additional Re -Submittals with all new equipment. CP USA has been on Hold on this project since June 17"', the date we received the submittal comments back from die engineer stating that our submittals were Rejected, and to Re -submit based on providing the equipment per CPR #4. Therefore, as part of this Change Order, CP USA requests the following additional time to the contract to complete the work from the time that the Change Order is approved in writing: • On Hold time from June 17't' until Change Oder is approved, plus • 3 Weeks to produce new Submittals, plus • Time for engineer to comment and return the comments back to CP USA If you have any questions or concerns don't hesitate to contact me. Regards, Thomas Warren Project Manager Tu-arren Cdcontrolpanelsusamet 16310 9ratlon Lane' BuKing 1 Suke 100 ' Austtn, Texas 78728' Phone; (512) 8633224 ' Fax. (512)86&5446' wxw.wnVo0ane1susa.net CHANGE ORDER SUMMARY SHEET 7"".moras Company Project Name: Round Rock Segment 3 Change Description: Change Allen Bradley Products to Modicon Products TMC Change No: COR # 201411-02- Jacobs PCR#4 Date: June 23, 2014 v uwul Tutt ytc nV. I - .y IV,VVO.Vu X 1 .II 1V,GVO. Subcontract Ole No. 2 - $0.00 X 1 $0. Subcontract Qte No. 3 - $0.00 X 1 $0. SUBTOTAL: $0.00 X 1.50% $10,608. OH&P 1st $10,000 of Costs @ 10%: $10,000.00 X 10.00% $1,000.0 OH&P Balance over $10,000 7.5%: $608.00 X 7.50°,6 $45.6 CII _ MTDAP`TC 1 TAI $0.00 X 0.70% •• cr ity / Builders Risk: $11,777.80 X + 2.00% �^ $235. TOTAL: $12,013. Bond $100,000 or Less: $0.00 X 2.50% $0. Bond $100,001 thru $500,000: $0.00 X 1.50% $0. Bond $500,001 thru $2,500,000: $0.00 X 1.00°x6 $0. Bond $2,500,001 thru $5,000,000: $0.00 X 0.75% $0. Bond $5,000,001 thru $7,500,000: $0.00 X 0.70% $0. Bond Over $7,500,0007 $12.013.36 X 0.65% $78. Hours Actual Hour Cost with Overhead (No Markup) Rate/hr Total Project Management Time 38 $ 112.00 $ 4,256.00 CAD Time 24 $ 92.00 $ 2,208.00 Programming Time 24 $ 128.00 $ 3,072.00 Administrative Time 10 $ 72.00 $ 720.00 Man hour Sub Tota) $ id 256.00 Equipment Difference $ (1,100.00) Markup Is 1,452.00 Change Order Total Is id d&'00 REQUEST FOR CHANGE ORDER NO. 002 Round Rock Water Transmission Segment 3(TM3) Request for Chance Order Number 002 Date 6/6/2014 Request for Change By: Layne Heavy Civil 1775 E. 69th Ave Denver, CO 80229 Reason for Change and Description Request that Layne place DET Tape over top of Bedding material as an early indicator of the pipes depth. Requested Chance Order Value Labor $ 300.00 Burden $ 42.00 Rent $ - Fuel $ 25.00 Tools $ 50.00 Material $ 1,384.97 Transport $ 50.00 OH&Profit $ 270.30 Total $ 2,122.27 Additional Time for change: Days i REQUEST FOR CHANGE ORDER NO. 006 Round Rock Water Transmission Segment 3(TM3) Request for Change Order Number 006 Date 7/9/2014 Request for Change By: Layne 1775 E. 69th Ave Denver, Colorado 80229 Reason for Change and Description Change Proposal Request / Extra Cement Stablized Sand Placed per field directive CR 272 Road Crossing Used 44.9 Extra CY of CSS Requested Change Order Value Labor $ 408.56 Burden $ 147.08 Rent $ - Fuel $ - Tools $ - Material $ 4,714.50 Transport $ - OH&Profit $ 749.45 Total $ 6,019.59 Additional Time for Change: Days Q