R-2015-2739 - 8/13/2015 RESOLUTION NO. R-2015-2739 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with Atkins North America, Inc. for the Creek Bend Boulevard Project; and WHEREAS, Atkins North America, Inc. has submitted Supplemental Contract No. 8 to the Contract to modify the provisions for the scope of services; and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 8 with Atkins North America, Inc.,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 8 to the Contract with Atkins North America, Inc., a copy of same being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 13th day of August, 2015. y i"T1 ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: — S"AL gkq SARA L. WHITE, City Clerk EXHIBIT "A„ STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 8 TO CONTRACT FOR ENGINEERING SERVICES FIRM: ATKINS NORTH AMERICA, INC. ("Engineer") ADDRESS: 6504 Bridle Point Parkway, Suite 200,Austin, TX 78730 PROJECT: Creek Bend Boulevard This Supplemental Contract No. 8 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Atkins North America, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 26th day of January, 2012 for the Creek Bend Boulevard Project in the amount of$179,898.43; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on July 12, 2012 to amend the scope of services and to increase the compensation by $805,808.42 to a total of $985,706.85; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on December 14, 2012 to amend the scope of services and to increase the compensation by $21,570.57 to a total of $1,007,277.42; and WHEREAS, the City and Engineer executed Supplemental Contract No. 3 on March 8, 2013 to amend the scope of services and to increase the compensation by $49,900.00 to a total of $1,057,177.42; and WHEREAS, the City and Engineer executed Supplemental Contract No. 4 on August 22, 2013 to amend the scope of services and to increase the compensation by $160,332.84 to a total of $1,217,510.26; and WHEREAS, the City and Engineer executed Supplemental Contract No. 5 on October 15, 2013 to amend the provisions for the scope of services; and WHEREAS,the City and Engineer executed Supplemental Contract No. 6 on March 13, 2014 to amend the scope of services and to increase the compensation by $82,089.99 to a total of $1,299,600.25; and Supplemental Contract Rev.12/01/08 0199.7202;00339022 84275 1 WHEREAS, the City and Engineer executed Supplemental Contract No. 7 on October 9, 2014 to amend the scope of services and to increase the compensation by $186,383.73 to a total of $1,485,983.98; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $159,095.13 to a total of$1,645,079.11; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit Q. Fee Schedule shall be amended by increasing by $159,095.13 the lump sum amount payable under the Contract for a total of $1,645,079.11, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. ATKINS NORTH AMERICA,INC. By: Date CITY OF ROUND ROCK APPROVED AS TO FORM: By: Alan McGraw, Mayor Stephan L. Sheets, City Attorney Date Supplemental Contract Rev.12/01/08 0199.7202;00339022 84275 2 ADDENDUM TO EXHIBIT B Engineering Services PROJECT DESCRIPTION This Supplemental Contract consists of additional construction phase services relating to bridge inspection, progress meetings, review of pay applications, final walk through participation, and punch list preparation. TASK 1: SURVEYING—Not Included with this Supplemental TASK 2: ROUTE STUDY—Not Included with this Supplemental TASK 3: ENVIRONMENTAL STUDIES—Not Included with this Supplemental TASK 4: PRELIMINARY DESIGN/30% PLANS—Not Included with this Supplemental TASK 5: PROJECT MANAGEMENT 1. Manage additional activities described in task 14. TASK 6: DIRECT EXPENSES 1. Mileage for site visits and meetings 2. Inspector vehicle maintenance, insurance, and fuel TASK 7: WATER IMPROVEMENTS—Not Included with this Supplemental TASK 8: UTILITY LOCATIONS/LAYOUTS—Not Included with this Supplemental TASK 9: GEOTECHNICAL DESIGN—Not Included with this Supplemental TASK 10: 60% PLANS—Not Included with this Supplemental TASK 11: 95% PLANS—Not Included with this Supplemental TASK 12: 100% PLANS/FINAL SUBMITTAL—Not Included with this Supplemental Page 1 of 3 TASK 13: 100% LANDSCAPING AND FENCE PLANS — Not Included with this Supplemental TASK 14: CONSTRUCTION PHASE SERVICES 1. The ENGINEER shall provide construction inspection services related to the bridge structure, including foundations, substructure and superstructure, for compliance with the Contract documents. Based on the contractor's baseline schedule it is assumed that the bridge inspection will last for 4 months. Inspection scope of services shall include: • Verify that the bridge structure is built according to the plans and specifications, and all contract documents • Verify the accuracy of the work and determine pay quantities by taking measurements of the quantities placed • Verify all the specifications are met for inspected items of work regarding materials, construction, measurement and payment • Verify and record daily quantities for each item of work for the purposes of review and approval of the contractor's monthly pay estimate • Verify all material sourcing information is from an approved source • Maintain a daily work report (DWR)to document construction activity and progress • Collect and maintain all material tickets for the project files • Conduct pre-activity meetings prior to major operations • Coordinate and schedule necessary materials testing • Review and comment, as appropriate, on applicable material test reports • Document and facilitate the resolution of deficiencies • Conduct hold-point inspections utilizing check lists for the following structure elements: (1) Drill shafts (2) Footings (3) Columns (4) Caps (5) Abutments (6) Reinforcing steel (7) Deck panels (8) Deck forms (9) Overhangs (10) Deck grading (11) Deck reinforcing steel (12) Expansion joints • Attend bi-weekly project progress meetings • Review and comment, as applicable, on the contractor's monthly schedule of reported progress and planning • Review contractor's monthly pay request for approval • Coordinate resolution to requests for information (RFIs) • Assist, as applicable, in the development and review of change orders • Provide input on as-built drawings Page 2 of 3 2. Project Manager will attend weekly project status meetings. 3. Inspector will attend up to 25 bi-weekly progress meetings and prepare meeting notes/action items as appropriate. A site visit will also be performed in conjunction with the meeting to stay familiar with the status of the project. Progress meetings during the bridge inspection are included under bridge inspection. These additional 25 meetings are for the 11 months the bridge inspector is not on-site full time. 4. Review up to 11 monthly pay applications. Pay applications during the bridge inspection are included under bridge inspection. These additional 11 pay application reviews are for the 11 months the bridge inspector is not on-site full time. 5. The ENGINEER shall provide construction schedule support services for the following: • Review, analysis and comment of the contractor's baseline schedule • Review, analysis and comment of the contractor's monthly schedule updates • Review, analysis and comment of the contractor's final as-built schedule 6. Participate in final walkthrough and prepare the punch list. EXCLUSIONS 1. All bridge inspection services not specifically identified above, including but not limited to: • Geotechnical investigations and analysis • Materials testing • Construction survey; verification of contractor's horizontal and vertical control 2. All tasks related to delay and cost claims shall be considered supplemental services and subject to additional fee, specifically, but not limited to: • Time Impact Analyses (TIA) for delay claims • Claims defense, response and resolution DELIVERABLES 1. Meeting notes, when necessary, for bi-weekly progress meetings. 2. Material test report review comments. 3. Review for up to 15 monthly pay applications including supporting documentation. 4. Schedule review comments 5. Punch list. Page 3 of 3 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page Creek Bend Layout Creek Bend Blvd Extension Supplemental 8 - Attachment C Current Date:23-Jul-15 Data Date 22-Jul-15 Activity ID Activity Name Original Remaining Start Finish Duration Duration 2012 2013 2014 2015 2016 2017 F M IAprl M punlJull A I S 1Oc1I N I D Jan' F l M IApr' M IJunlJulI Al S 10511 N I D Jany F I M IAprl M I J gull A I S JOctI N I D Jan' F I M IAprI M I J Jul[ 1 A I S lOctI N I D Janl F 1 M 1Aprl M I J IJull A I S lOctI N I D Jany F I M Apr 1010 Collect Supplmt Field Data&Prepare Mapping 28d Od 10-Feb-12A 28-Feb-12A IligI Collect Supplmt Field Data&Prepare Mapping Route Study Phase 1020 Design Criteria 3d Od 10-Feb-12A 12-Feb-12A j Des gn Criteria • 1040 Typical Sections 3d Od 13-Feb-12 A 15-Feb-12 A I Typ cal Sections 1050 Routes&Exhibits 42d Od 15-Feb-12A 07-Mar-12A •- "outes&Exhibits 1070 Technical Memorandum 7d Od 07-Mar-12 A 08-Mar-12 A Technical Memorandum 1080 QA/QC 7d Od 05-Mar-12A 08-Mar-12A QA/QC 1090 Submit Exhibits,Cost Eats&Tech Memo Od Od 10-Mar-12 A Submit Exhibits,Cost Ests&Tech Memo 1100 Round Rock Review&Comment 21d Od 12-Mar-12 A 16-Mar-12 A Round Rock Review&Comment 1110 Finalize Route Study 14d Od 19-Mar-12 A 23-Mar-12 A Finalize Route Study 1150 Cross Sections 21d Od 26-Mar-12 A 20-Apr-12A Cross Sections 1170 Bridge Preliminary Layout 21d Od 26-Mar-12A 20-Apr-12A Bridge Preliminary Layout 1140 Roadway Plan&Profile 28d Od 26-Mar-12 A 27-Apr-12 A J Roadway Plan&Profile 1160 Drainage Plans 56d Od 26-Mar-12 A 27-Apr-12 A J Drainage Plans 1180 Cost Estimate 7d Od 30-Apr-12 A 02-May-12 A Cost Estimate 1190 QA/QC 7d Od 30-Apr-12A 04-May-12A QA/QC 1200 Submit 30%Plans Od Od 04-May-12 A Submit 30%Plans 1210 Round Rock Review&Comment 10d Od 07-May-12A 18-May-12A Round Rock Review&Comment 1305 I NTP Od Od 09-Jul-12A ' _NTP 1325 Prepare&Submit 30%Water Plans 35d Od 09-Jut-12A 24-Aug-12A Prepare&Submit 30%Water Plans 1330 Round Rock Review&Comment 10d Od 27-Aug-12 A 07-Sep-12 A Round Rock Review&Comment 1345 Survey 75d Od 09-Jul-12A 19-Oct-12A -iiry J- Survey 1335 Prepare&Submit 60%Plans 95d Od 09-Jul-12A 16-Nov-12A -.9 -j Prepare&Submit 60%Plans 1350 Round Rock Review&Comments 10d Od 22-Nov-12A 05-Dec-12 A Round Rock Review&Comments 1360 Prepare&Submit 95% Plans 35d Od 06-Dec-12A 01-Feb-13APrepare&Submit 95% Plans 1365 Round Rock Review&Comments 10d Od 01-Feb-13 A 28-Feb-13 A i � Round Rock Review&Comments 1 1320 Round Rock Acquire ROE 30d Od 09-Jul-12 A 15-May-13 A i+ Round Rock Acquire ROE 1315 ENV Studies,Document Prep&Agency Review 170d Od 09-Jul-12 A 07-Jun-13A -6-L_ ENV Studies,Document Prep&Agency Review 1390 Geophysics Study 25d Od 25-Mar-13A 05-May-14 A Geophysics Study 1355 Geotechnical Investigations&Analysis 96d Od 20-Aug-12A 14-Jul-14A �i Geotechnical Investigations&Analysis 1370 Prepare&Submit 100% Plans(Including 100d Od 01-Mar-13A 15-Dec-14A -...-11.-r-- ► ( Prepare&Submit 100% Plan (Including Extension to Sam Bass) Extension to Sam Bass) 1310 ROW Acquisition Document Prep 126d Od 09-Jul-12A 31-Dec-14A ROW Acquisition Documen Prep 1400 Round Rock Review&Comments 15d Od 16-Dec-14A 05-Jan-15A Romd Rock Review&Conmenls 1410 Finalize 100%Plans&Bid Documents 14d Od 06-Jan-15A 21-Jan-15A Finalize 100%Plans&C Bd Documents 1340 Round Rock Acquire ROW 105d Od 08-Oct-12A 23-Jan-15A �i -.Round Rock Acquire RC W a 1375 Bidding Phase Services 26d Od 17-Jan-15A 11-Feb-15 A -•Ed Bidding Phase Servic rs 1380 Construction Phase Services 291d 291d 12-Feb-15A 31-Aug-16 it ' 1 Construction Phase Services I I Current Work I I Critical Work Actual Level of Effort Page 1 of 1 I 1 Actual Work I 1 Remaining Level of Effort • • Milestone ADDENDUM TO EXHIBIT D Fee Schedule Total Total Other TOTALS Task Labor Hours Loaded Labor Cost Direct Costs Subconsultants Task 5: Project Management 40.0 $ 7,503.88 $ 7,503.88 Task 6: Direct Expenses $ 2,862.50 $ 2,862.50 Task 14: Construction Phase Services 1,190.0 $ 148,728.75 $ 148,728.75 GRAND TOTAL: 1,230.0 $ 156,232.63 $ 2,862.50 $ - $ 159,095.13 Overhead Rate= 170.07% Atkins Raw Labor= $ 51,650.84 Profit Rate= 12% Atkins Overhead= $ 87,842.58 Atkins Profit= $ 16,739.21 Atkins Total Labor= $ 156,232.63 CREEK BEND BLVD EXTENSION SUPPLEMENTAL#8 ATTACHMENT D TASK 5: PROJECT MANAGEMENT Task Description Project Design Admin/ Total Manager EIT Clerical Hours Rates $ 62.02 $ 34.82 $ 31.50 Project Management 1. Manage additional construction activities 40 40 Totals 40 40 Raw Labor $2,480.80 $ - $ $ 2,480.80 Multiplier 3.02 3.02 3.02 $7,503.88 $ - $ $ 7,503.88 Page 2 CREEK BEND BLVD EXTENSION SUPPLEMENTAL#8 ATTACHMENT D TASK 6: DIRECT EXPENSES Direct Cost Unit Quantity Unit Price Total Site Visits&Meetings Mileage Mile 1500 $0.575 $862.50 Vehicle Maintenance, Insurance&Fuel Month 4 $500.000 $2,000.00 Printing Exhibits Color on Bond SF $5.00 $0.00 Photocopies B/W 8.5 X 11 EA $0.05 $0.00 Photocopies BNV 11 X 17 EA $0.10 $0.00 Mylar Plots 11 X 17 EA $2.50 $0.00 Overnight Mail-letter size EA $17.50 $0.00 Overnight Mail-oversized box EA $35.00 $0.00 Courier Services EA $37.50 $0.00 Total Direct Expenses $2,862.50 Page 3 CREEK BEND BLVD EXTENSION SUPPLEMENTAL#8 ATTACHMENT D TASK 14: CONSTRUCTION PHASE SERVICES Senior Project Senior Design Design Project Senior Admin/ Total Task Description Project Manager Engineer Engineer EIT Inspector Scheduler Clerical Hours Manager Rates $ 78.85 $ 62.02 $ 63.59 $ 37.64 $ 34.82 $ 36.50 $ 50.13 $ 31.50 Construction Phase Services 1. Bridge inspection(Assume 4 months) 688 688.0 2. PM attend weekly progress meetings 150 150.0 2. Inspector attend bi-weekly progress meetings(includes site visit and notes prep) 200 200.0 3. Review pay applications 8 20 28.0 4. Review monthly schedule submittals 16 80 96.0 5. Final walkthrough and punch list prep 8 20 28.0 Totals 182.0 928.0 80.0 1,190.0 Raw Labor $ - $11,287.64 $ - $ - $ - $33,872.00 $4,010.40 $ - $ 49,170.04 Multiplier 3.02 3.02 3.02 3.02 3.02 3.02 3.02 3.02 $ - $ 34,143 $ - $ - $ - $ 102,455 $ 12,131 $ - $148,728.75 Page 4