Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
R-2015-2728 - 8/13/2015
RESOLUTION NO. R-2015-2728 WHEREAS, the City of Round Rock has duly advertised for bids for the Purple Sage Drive Culvert Replacement Project; and WHEREAS, Austin Underground, Inc. has submitted the lowest responsible bid; and WHEREAS, the City Council wishes to accept the bid of Austin Underground, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Austin Underground, Inc. for the Purple Sage Drive Culvert Replacement Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 13th day of August, 2015. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: 9*m/t"-- k&it SARA L. WHITE, City Clerk 0112.1504;00339564 THE CITY Or ROUND ROCK BIDS EXTENDED AND CHECKED Utilities&Environmental Services " 2008 Enterprise Drive } Ik' BY: Danny Halden&,Iorae Rosenthal li 2 Round Rock, Texas 78664 DATE: 7/15/2015 BID TABULATION SHEET: I of 2 CONTRACT:Pur le Sage Drive Culvert Replacement Austin Underground,Inc. Patin Construction,LLC JKB Construction Co., LLC LOCATION: 2008 Enterprise Drive Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes DATE: 7/14/2015 Time:2:00 PM Addendum(s)? Yes Addendum(s)? No Addendum(s)? Yes Project Duration: 75 Calendar Das Bid Bond? Yes Bid Bond? Yes Bid Bond? Yes APPROX. UNIT UNIT UNIT ITEM# ITEM DESCRIPTION OTY. UNIT PRICE COST PRICE COST PRICE COST I Clearing&Grubbing I LS $3,000.00 $3,000.00 $2,500.00 $2,500.00 $9,000.00 $9,000.00 2 Remove P.C.Slab 2808 SF $2.00 $5,616.00 $3.00 $8,424.00 $3.00 $8,424.00 3 Remove P.C.Curb 157 LF $9.00 $1,413.00 $3.00 $471.00 $5.00 $785.00 4 Street Excavation 128 CY $20.00 $2,560.00 $30.00 $3,840.00 $50.00 $6,400.00 5 Flexible Base 12" 110 CY $110.00 $12,100.00 $40.00 $4,400.00 $50.00 $5,500.00 6 HMAC 2"Type D 264 SY $23.00 $6,072.001 $35.00 $9,240.00 $30.00 $7,920.00 7 Trench Protection 224 LF $2.50 $560.00 $10.00 $2,240.00 $5.00 $1,120.00 8 Riprap for Wingwall Apron 79 SY $130.00 $10,270.00 $80.00 $6,320.00 $143.00 $11,297.00 9 Riprap for Flume 27 SY $230.00 $6,210.00 $80.00 $2,160.00 $148.00 $3,996.00 10 Concrete Curb&Gutter 165 LF $42.001 $6,930.00 $30.00 $4,950.00 $28.00 $4,620.00 11 Safety End Treatment I EA $5,200.00 $5,200.001 $2,200.00 $2,200.00 $3,900.00 $3,900.00 12 Remove Storm Sewer Pipe 719 LF $7.00 $5,033.00 $20.00 $14,380.00 $20.00 $14,380.00 13 Waterline Removal 50 LF $51.00 $2,550.00 $40.00 $2,000.00 $105.00 $5,250.00 14 ACM Handling/Disposal 35 LF $38.00 $1,330.00 $40.00 $1,400.00 $255.00 $8,925.00 15 Remove/Dispose Gas Pipe 50 LF $9.50 $475.00 $40.00 $2,000.00 $200.00 $10,000.00 16 PVC C900 Waterline 50 LF $95.00 $4,750.00 $200.00 $10,000.00 $60.00 $3,000.00 17 Ductile Iron Fittings 0.3 TON $1,200.00 $360.001 $10,000.00 $3,000.00 $6,500.00 $1,950.00 18 Sch 80 PVC Sleeve 50 LF $30.00 $1,500.00 $25.00 $1,250.00 $50.00 $2,500.00 19 Concrete Box Culvert 224 LF $455.00 $101,920.00 $600.00 $134,400.00 $335.00 $75,040.00 20 30"RCP 7 LF $290.00 $2,030.00 $500.00 $3,500.00 $75.00 $525.00 21 Wingwall(SW-0) I EA $9,300.00 $9,300.00 $5,000.00 $5,000.00 $21,800.00 $21,800.00 22 Wingwall(FW-0) I EA S10,000.001 $10,000.00 $5,000.00 $5,000.00 $17,300.00 $17,300.00 23 Dry Rock Riprap 139 SY $100.00 $13,900.00 $70.00 $9,730.00 $150.00 $20,850.00 24 Bermuda Block Sodding 245 SY $18.00 $4,410.00 $4.00 $980.00 $6.00 $1,470.00 25 Native Seeding 2140 SY $6.75 $14,445.00 $1.00 $2,140.00 $2.00 $4,280.00 26 Soil Retention Blanket 2140 SY $1.75 $3,745.00 $2.00 $4,280.00 $1.70 $3,638.00 27 Sediment Containment Dike 1.0 LF $8.00 $80.00 $10.00 $100.00 $6.00 $60.00 28 Rock Berm 40 LF $36.00 $1,440.00 $50.00 $2,000.00 $16.00 $640.00 29 Stabilized Construction Entrance 1 EA $1,000.001 $1,000.00 $1,200.00 $1,200.00 $1,100.00 $1,100.00 30 Culvert Railing 100 LF $40.00 $4,000.00 $100.00 $10,000.00 $70.00 $7,000.00 31 Mobilization 1 LS $5,000.00 $5,000.00 $14,000.00 $14,000.00 $14,500.00 $14,500.00 32 Traffic Control 1.5 MO $2,500.00 $3,750.00 $850.00 $1,275.00 $7,000.00 $10,500.00 GRAND TOTAL: $250,949.00 $274,380.00 $287,670.00 Corrected Upon Bits Tabulation No Written unit Prices on.BidEortn THE CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Utilities&Environmental Services i� 2008 Enterprise Drive ,1= BY: Danny Halden&.)orae Rosenthal-%, /- Round Rock, Texas 78664 DATE: 7/15/2015 BID TABULATION SKEET:2 of 2 CONTRACT:.Pur le Sage Drive Culvert Replacement Whitestone Civil Chasco Constructors,Ltd., Central Road&Utility, Construction,LLC L.L.P Ltd. LOCATION: 2008 Enterprise Drive Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes DATE: 7/14/2015 Time:2:00 PM Addendum(s)? Yes Addendum(s)? Yes Addendum(s)? Yes Pro'ect.Duration: 75 Calendar Das Bid Bond? Yes Bid Bond? Yes Bid Bond? Yes APPRO�. UNIT UNIT UNIT ITEM f/ ITEM DESCRIPTION TY. UNIT PRICE COST PRICE COST PRICE COST I Clearing&Grubbing 1 LS $10,000.00 $10,000.00 $37,000.00 $37,000.00 $7,500.00 $7,500.00 2 Remove P.C.Slab 2808 SF $5.00 $14,040.001 $3.00 $8,424.00 $7.00 $19,656.00 3 Remove P.C.Curb 157 LF $9.00 $1,413.00 $8.00 $1,256.00 $25.00 $3,925.00 4 Street Excavation 128 CY $35.00 $4,480.00 $130.00 $16,640.00 $55.00 $7,040.00 5 Flexible Base 12" 110 CY $95.00 $10,450.00 $60.00 $6,600.00 $80.00 $8,800.00 6 HMAC 2"Type D 264 SY $23.001 $6,072.00 $27.00 $7,128.00 $50.00 $13,200.00 7 Trench Protection 224 LF $15.00 $3,360.00 $20.00 $4,480.00 $5.001 $1,120.00 8 Riprap for Wingwall Apron 79 SY $109.00 $8,611.00 $100.00 $7,900.00 $110.00 $8,690.00 9 Riprap for Flume 27 SY $110.00 $2,970.00 $120.00 $3,240.00 $160.00 $4,320.00 10 Concrete Curb&Gutter 165 LF $19.00 $3,135.00 $25.00 $4,125.00 $50.00 $8,250.00 11 Safety End Treatment I EA $4,600.00 $4,600.00 $3,000.00 $3,000.00 $3,500.00 $3,500.00 12 Remove Storm Sewer Pipe 719 LF $26.00 $18,694.00 $20.00 $14,380.00 $40.00 $28,760.00 13 Waterline Removal 50 LF $18.00 $900.00 $50.00 $2,500.00 $25.00 $1,250.00 14 ACM Handling/Disposal 35 LF $75.00 $2,625.00 $70.00 $2,450.00 $200.00 $7,000.00 15 Remove/Dispose Gas Pipe 50 LF $12.00 $600.00 $20.00 $1,000.00 $25.00 $1,250.00 16 PVC C900 Waterline 50 LF $66.00 $3,300.00 $140.00 $7,000.00 $70.00 $3,500.00 17 Ductile Iron Fittings 0.3 TON $7,800.00 $2,340.00 $2,000.00 $600.00 $10,000.00 $3,000.00 18 Sch 80 PVC Sleeve 50 LF $50.00 $2,500.00 $60.00 $3,000.00 $75.00 $3,750.00 19 Concrete Box Culvert 224 LF $440.00 $98,560.00 $600.00 $134,400.00 $575.00 $128,800.00 20 30"RCP 7 LF $140.001 $980.00 $300.00 $2,100.00 $170.00 $1,190.00 21 Wingwall(SW-0) 1 EA $13,852.00 $13,852.00 $12,000.00 $12,000.00 $15,750.00 $15,750.00 22 Wingwall(FW-0) t I EA $9,395.00 $9,395.00 $13,000.00 $13,000.00 $18,000.00 $18,000.00 23 Dry Rock Riprap 139 SY $89.00 $12,371.00 $130.00 $18,070.00 $150.00 $20,850.00 24 Bermuda Block Sodding 245 SY $16.00 $3,920.00 $10.00 $2,450.00 $15.00 $3,675.00 25 Native Seeding 2140 SY $5.50 $11,770.00 $4.00 $8,560.00 $3.00 $6,420.00 26 Soil Retention Blanket 2140 SY $1.55 $3,317.00 $2.00 $4,280.00 $2.00 $4,280.00 27 Sediment Containment Dike 10 LF $7.20 $72.00 $6.00 $60.00 $35.00 $350.00 28 Rock Berm 40 LF $27.50 $1,100.00 $17.00 $680.00 $55.00 $2,200.00 29 Stabilized Construction Entrance I EA $1,400.00 $1,400.00 $1,000.00 $1,000.00 $2,000.00 $2,000.00 30 Culvert Railing 100 LF $80.00 $8,000.00 $90.00 $9,000.00 $125.00 $12,500.00 31 Mobilization l LS $19,000.00 $19,000.00 $30,000.00 $30,000.00 $17,000.00 $17,000.00 32 Traffic Control l.5 MO $3,232.00 $4,848.00 $4,000.00 $6,000.00 $7,500.00 � $11,250.00 GRAND TOTAL: $288,675.00 $372,323.00 $378,776.00 Corrected Upon Bid Tabulation