Loading...
R-2015-2725 - 8/13/2015 RESOLUTION NO. R-2015-2725 WHEREAS,the City of Round Rock,Texas(the"City")is a participating and founding member of the Brushy Creek Regional Utility Authority, Inc. (the "BCRUA"), and WHEREAS, the BCRUA has submitted a proposed annual operating budget for Fiscal Year 2015-2016, and WHEREAS, the City Council wishes to approve said proposed budget,Now Therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the annual operating budget submitted by and for the Brushy Creek Regional Utility Authority, Inc. for Fiscal Year 2015-2016, attached hereto as Exhibit"A", is hereby approved. The City Council hereby finds and declares that written notice of the date,hour,place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 13th day of August, 2015. m ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: — �1&&- (AZ44: SARA L. WHITE, City Clerk 0112.1504;00339550 EXHIBIT B'RUSHYCREEK �FY 20'16 Budget-Final Draff � ,. «A» ' REGIONAL UTILITY AUTHORITY A F f It11, o1 CYz r .. I.a 11 J-11 -sa ko:,n d rt o FixedFixed Operating Operating Expensesfor Expensesfor Cities not Cities Variable Non-Operating Receiving Receiving Operating CODE FY 2016 BCRUA Op Bud et Ex enses Water Water Expenses FY2015 3.31.15 Act FY 2016 Cedar Park Leander Round Rock 7510.00 Insurance 100% $ 15 600.00 S 4,416.86 S 15 600.00 S 2,335.32 S 7,363.20 S 5,901.48 7300.00 Security/Fire/Elevator 100%. 4,500.00 308.00 8,200.00 1,227.54 3,870.40 3,102.06 Simplex Grinnell/Elevator Ins ect-License/Mist Repairs 7100.00 Gen Mana er-Admin Services 100% 111,700.00 55,838.79 111,700.00 16,721.49 52 722.40 42,256.11 IGM S106.7K,Admin S5K 9300.00 Capital Outlay 100% 25 000.00 25 000.00 3,742.50 11 800.00 9,457.50 Chemical Feed System Improvements 9305.00 Desks,Files Kitchen Appliances,etc. 100% 2,000.00 2,000.00 299.40 944.00 756.60 7215.00 Grounds Maint/Building Maint 100% 20 000.00 1,070.10 23 000.00 3,443.10 10 856.00 8,700.90 HVAC$4.5K Moven $15K,Misc S3.5K 7220.00 Irrigation Water at Plant-WW-Solid Waste 100% 10000.00 3005.24 11 000.00 1,646.70 5192.00 4161.30 S1,045.44 CTR/S750.00 Month WAVW 7225.00 TCEQ Admin 100% 100.00 100.00 14.97 47.20 37.83 Annual PWS Fee Less 25 Connections=S100 7230.00 Safetv Equip 100% 2,500.00 959.93 3,500.00 523.95 1,652.00 1,324.05 Basic PPE for Employees 7235.00 Treated/Raw Main Maint 100% 48 500.00 20,000.00 2,994.00 9.440.00 7,566.00 7470.00 Audit Fees/Invest/Bank 100% 51 000.00 31,666.60 51 000.00 7,634.70 24 072.00 1 19,293.30 7680.00 Legal Services 100% 40 000.00 7029.30 40 000.00 5,988.00 18,880.00 15,1 2.00 7710.00 Computers&Equipment 33% 67% 7,500.00 543.34 10 500.00 4,271.18 4918.01 1,310.81 Computer/Network Equip/Dahill Contract 7240.00 SCADA/Services 33% 67% 10,000.00 395.00 10,000.00 4,067.79 4683.82 1,248.39 Misc Contract ServiceslHardware 7715.00 Communication/Phones 33% 67% 6 400.00 2339.43 7,000.00 2,847.45 3 278.67 873.87 7245.00 Intake Bare Repair/Maint 33% 67% 104 000.00 43 998.75 20,000.00 8,135.58 9367.64 2,496.78 7430.00 Accountin/Finanace/Personnel 33% 67% 45 000.00 18 440.02 45 000.00 18 305.06 21 077.19 5,617.76 7101.00 Plant Su erintendent 1 FTE 1 33% 67% 112 291.92 59.414.17 116,223.12 47,277.12 54,436.82 14,509.18 1 FTE,Base X 1.5 7105.00 Administration Assistant(operations) 33% 67% 7110.00 Small Tools/Equipment 33% 67% 5,000.00 7,500.00 3,050.84 3.512.87 936.29 7115.00 Office/Building Supplies 3396 67% 6,000.00 557.59 7,000.00 2,847.45 3,278.67 873.87 General Office Su lies/Pa errronerlPens... 7120.00 Plant Winterization Supplies 33% 67% 1,000.00 2,000.00 813.56 936.76 249.68 7720.00 Miscellaneous Ex enses 33% 67% 1.000.00 17.00 2 000.00 813.56 936.76 249.68 7000.00 Plant Operators 3 FTE 100% 195,212.16 100 772.24 200,091.84 106,728.99 93,362.85 3 FTEs,Base X 1.5 7005.00 Maintenance Technician 100% 7010.00 Treatment Materials/Supplies 100% 30 000.00 825.22 30 000.00 16 002.00 13 998.00 Misc repair arts/services 7015.00 Vehicle Repairs/Maint t00% 4000.00 81.55 4,000.00 2133.60 1866.40 2Truck/1 UTV/Backhoe 7020.00 Contract Services Lab Services 100% 11 300.00 15 000.00 8,001.00 6,999.00 Annual/1/4 TCEQ Sampling,VOC,TOC Bact's 7020.50 Laboratory Supplies 100% 20 500.00 20 000.00 10 668.00 9,332.00 Equipment Maint/Reagents/Misc Supplies for Lab 7025.00 Fuel and Oil 100% 5,000.00 5,000.00 2,66700 2,333.00 2 Trucks/1 UN's Gas/Backhoe 7030.00 Janitorial Facility Maint 100% 5600.00 6900.00 3680.46 3,219.54 1XClean perweek 5575.00 Mo,Misc Supplies 7035.00 Equip Facility Maint 100% 25 000.00 361.92 25 000.00 13 335.00 11 665.00 Misc Maint/Repairs 7040.00 Schools/Training 100% 7,500.00 7,500.00 4,000.50 3,499.50 7045.00 License and Membership Dues 1 100% 2,000.00 111.00 2,000.00 1,066.80 933.20 TWUA/AWWA etc... 7050.00 Uniforms 100% 3,600.00 1,358.68 3,200.00 1,706.88 1,493.12 Uniforms 7200.00 Power-Pum in Raw/Treated/Lift Stations 100% 500000.00 22185.65 500,000.00 266700.00 233,300.00 7205.00 Chemicals 100% 155,000.00 185 000.00 98 679.00 86,321.00 7210.00 Sludge Disposal 100% 23.500.00 2350000 12 534.90 10 965.10 $550.00 per Roll Off.75 perweek 9310.00 Contingency46,489.20 24,438.40 1 46,489.20 1 6,592.17 1 21,970.80 117,926,24 Total Annual S 1,663,793 $ 380,135 $ 1,612,004 S 693,498 S 754,525 S 163,982 $ 403,001 $ 773,375 $ 188,631 $ 40,996' LESSi FY15 Reserve Budget (415,948) (176,135) (194,731) (45,083) Roserve Adjustment for FY16 __ (12,947) (2,760) (6,100) (4,087). Round Rock Fee in Lieu of Min Take.- (121,682) 121,682 Total Operating Budget -_.- 1,599,057 569,056 748,425 281;577 FY 2016 Debt Service Budget 7- ` ;g> S 11,809,880 S 1,44;,112 $ 6,047,311 S 4,319,457_ Total Operating and Debt Service Budget S 13,408,937 S 2,012.168 S 6;795,736 S 4,601,034 BCRUA Project Reserved Capacity Allocation Round Rock Fee in Lieu of Minimum Take Calculation Cedar Park :14.97% Leander 47.20% ,BCRUAFY18-GaltansTreatgd;(5MGDx365) ,,;;? 5,000;„8 „ Round Rock "37.83% ;BCRUA FY10WTP;'08M,Exgensea Capacity Allocation for Cities Receiving Water CedarPark ", 53.346/. ,BCRUA Cost per1000 gal. „ i,—Off ,.,;`;,, �: 3��'`'-INI Leander 46.66% Round Rock 0.00% _.. ;,Ceder Paifc FY14 WTP OdM;Fxpe.,, Ultimate Capacity Allocation Cedar Park 14.18% CedaT,�zo FY14;Gallons Treated Leander 47.26% Round Rock, 38.56% jCedar Park Cost„ger1,00Qgal`,_-,.,,�., fD fferenW iq BCRUA and CP Cqs f„e �x ,. ;Round Rock Minimum Annua'fe,, ge&u!1 ' W :Round Rock Fee_in ueu`-'N]inatm.Talie - `3i