R-2014-1682 - 8/28/2014 RESOLUTION NO. R-2014-1682 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract') with Patin Construction, LLC for the Southwest Downtown Infrastructure Improvements — San Saba Street and West Liberty Avenue Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 4, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 4 to the Contract with Patin Construction, LLC for the Southwest Downtown Infrastructure Improvements— San Saba Street and West Liberty Avenue Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A"and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551,Texas Government Code, as amended. RESOLVED this 28th day of August,2014. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Clerk V EXHIBIT Page I of 4 "A„ _. Contract Quantity Adjustment/Change Order A.anz Department: Transportation Project SWDT-San Saba Street and West Name: Liberty Avenue Date: ]uty 25,2014 City Project Change Order/Quantity ID Number TX22AREA Adjustment No. 4 justification Quantity Adjustment/Change Order 0 4 is required for the relocation of unforeseen dry utility tabling and electrical service change outs for Golden Chic,Baker Aiklen's Engineedng office antl Wells Fargo businesses.Alm associated with Nis Change Order/Quandt,Adjustment is additional handrail Nat was requiretl for ADA access.This Change Order/Quantity Adjustment also accounts for some final quantities on Items previously completetl items for roadway construction,along with some deductions for unnecessary bores,Storm water inlets and 12"water main. SUMMARY Amount %Change Orgime Contract Price: §3,9]0,511.00 Previous(uaotity Adjustrungs): $341,94].01) This Quantitymil.sen rt: $60,927.00 Total Quantity Adjumnerv(s): $402,874.00 Total Omtrad Na,with Quantity Adjustment(s): $3,6]3,385.00 Prevlous Change Qrder(s): $166,900.87 4.31% This Charge Order: $150,165.00 3.88% Total Change Order(s)To Date: $317,065.87 8.19% Adjusted Contract Price (Original Contract Price Rus Quantity Adjustment(s)Rus Gauge Odegs)7: $9,190,450.8] Difference between Ongirol ard Adjustecl curbed Prices: §719,939.87 Original Connect Time: DO Calendar Days Time Adjustment by previous Quan.Adj./Change Order: 74 Calendar Days Time Adjustment by this Quan.Adj./Gauge Order: 22 22 New Contract Time: 366 Calendar Days Submitted for Approval Prepared By: r ignature / Todd Neltgen,Transportalion Manager,Dry of Round Rack Date Approvals Signature Printed Name,Ttle,Company Date city Projar Manager. -7—.7 / $gruume / Todd Keltgen,Tansporthdon Manager,City of Round Rork Date Mayor/Dty / Manager Sgmture Alan McGrew,Mayor,city of Round Rock Date Cr ori Page 2 oro Contract Quantity Adjustment/Change Order R,wa Project Name: SWOT-San Saba Street and West Liberty Avenue Quad.Adj./Change Order No.: 4 Change Order Oats Contract Item V Item Description Unit Qty. Unit Price Amount Time Ad'ustinern Da RELOCATE THE AT&T CABLE ON LIBERTY STREET IS 1 $36,000.00 $36,000.00 PROVIDE 3 PHASE ELECTRICAL SERVICE TO BAKER AIKLEN,GOLDEN CHICK, LS 1 $34,440.00 $34,440.00 RELOCATE LIGHT POLE BASES IS 1 $2,400.00 $2,400.00 BAKER AIKLEN SEWER IS 1 $11,590.00 $11,590.00 WELLS FARGO ATM POWER RELOCATION IS 1 $4,500.00 $4,500.00 LIGHTING CONDUIT NORTH END OF LIBERTY LS 1 $2,50D.DD $2,500.00 DUMPSTER PAD GATE IS 1 $3,500.00 $3,500.00 AT&T/TIME WARNER AT LIBERTY AND ROUND ROCK AVE LS 1 $7,000.00 $7,000.00 HANDRAIL AT DENTEST IF 20 $100.00 $2,000.00 ELECTRICAL LIGHTING PANEL LS 1 $27,800.00 $27,800.00 RELOCATE 40 GFCI OUTLETS IN PLANTERS LS 1 $12,200.00 $12,200.00 CHANGE OUT METER CAN AT 410 WEST LIBERTY LS 1 $1,385.00 $1,385.00 TIO DAN'S ATMOS GAS LS 1 $4,850.011 $4,850.00 $0.00 22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TALS:l $150165.00 Pap}of4 Contract Quantity Adjustment/Change Order ...wa Project Name: SWDT-San Saba Street and West Liberty Avenue Quan.Adj./Change Order No.: 4 2uantity Adjustment Data Contras Time Adjustment(Days) Bid Ilam# Item Description Unit Qty. Unit Price Amount Street Excamfion,Excavation complete in place and Properly Dispose Offdte(by 1 Medved e-Plan Quantity). CY 128 $20.00 $2,560.00 Remove P.C.Concrete Curb and Gutter 2 and Properly Dispose Offsite LF 195 $3.00 $585.00 Remove P.C.Concrete Sidewalk, Driveway,and other Miscelleaneous Concrete Apputrenan.antl Properly 3 Dispose ORsile SF 10577 $3.00 $31,731.00 Remove Trees and Properly Dispose 4 Offsite. EA 39 $250.00 $9,750.00 Subgrade Preparation-6"Scari0ed Moisture Conditimed then Recompacted 24 Subgrade Maleria6(CH Subgratle Area) SY 1002 $5.00 $5,360.00 alt Sha iced Base: Ho[Mix Asphaltic Cmcrete Base 10.5"Thick T%OOT Item 340,Type B(Black Base)complete in place per square yard(Measurement 25 Method B) S'f 1 323 $47.00 $15,181.00 Hot Mix Asphaltic Concrete Pavement Surface Course,2 inches Type D complete in place per square yard 27 (Measurement Method B) SY 1072 $13.00 $13,936.00 Construct Por0and Cement Reinforced Concrete Sidewalks to 4-Inch Thickness, complete in place per square foot(as needed to math ROW bade W walk m 29 site at each address) SF 34 $6.00 $204.00 Portland Cement Reinforced Concrete 32 Driveway, SF 513 $6.00 $3,078.00 Electic Pu il Box,H2O loatl capable calla, 49 to match pavers EA 1 2 $630.00 $1,260.00 SCH 40 PVC IRRIGATION LINE INCL ALL 54 FIRINGS/APPURTS LF 25 $1.20 $30.00 TREE BUBBLERS,INCL 4DF FLU PIPE, 59 FITTINGS/APPURTS EA 2 $26.00 $52.00 75 6"PIPE(DI AWWA C-100 MIN,CL 200) LF -1 $1W.00 -$100.00 6"GATE VALVE,NOT ASSOCIATED 81 W/FIRE HYDRANT EA -1 $1,500.00 -$1,500.00 )ACK/BORING 18"SIL ENCASE PIPE, 85 ASTM A-252,GR 2,GROUTING LF -60 $400.00 -$24,000.00 90 2'%7 ARE INLET EA 1 $1,000.00 $1,000.00 97 PVC, IT'DIA,EXCAVA/BKFL LF 30 $60.00 $1,800.00 $0.00 $0.00 $0.00 V Pagc 4 of 4 Contract Quantity Adjustment/Change Order 2.�oua $0.00 $0.00 $0.00 a.00m $000. TAM $60,927.00 0