Contract - Patin Construction - 8/28/2014 VV Peg,I of 4 Contract Quantity Adjustment/Change Order m.W12 Department: Transportation Project SWDT-San Saba Street and West Name: liberty Avenue Date: 3uly 25 2014 City Project Change Order/Quantity ID Number TX22AREA Adjustment No. 4 Justification Quantity Adjustment/Change Order#4 is required for the relocation of unforeseen dry utility cabling and electrical service Charge outs for Golden ChiC,Baker Aiklen's Engineenng office and Wells Fargo businesses.Alco associated with one Change Order/Quantity Adjustment is additional handrail that was required for ADA access.This Charge OindmQuantity Adjustment also accounts for some final quantities on items previously completed items for roadway construction,along with some deductions for unnecessary bores,Storm water inlets and 12"water main. SUMMARY Amount %Charge Original Contract Price: $3,4]0,511.00 Previous Quantity gdjvsbneri(s): b341,94].00 M This Quantity Adjustment: $60,927.001 Total Quarter,Adjustment(s): $402.874.00 Total Contract Price veli Quantity Adiusvnengs): $3,873,385.00 ProNous Charge Order(s): $166,900.87 4.31% This Change Order: $150,165.00 3.88% Total Change Order(s)To Date: $317,065.87 &19% Adjusted Corinna Price [Original Contract Price Plus Quantity Adjusment(s)Plus Change order(s)]: $4,190,450.87 JNWJJWM Difference between Onginal and Adjusted ConVad Prices: $719,939.87 Onglnal Coned Time: 270 Calendar Days Time Adjusareat by P bus Quan.Adl./Change Order: 74 Calendar Days Time Mtlu raent by this Quan.Adi./cro ge Order: 22 22 New Contract Time: 366 Calendar Days comm�iiy IM gnamre Totltl Keltgen,Transportation Manager,City of Round 0.ak Dale �nayre Printed Name,Title,Company Name,Title,Company Date Gty Project 15-7 Manager: nature Totltl Keltgen,Transportation Manager,Cityof Round Rock Data Marry N 11 W Managenager Jit /vl fIY nature Alan McGraw,Mayor,city of Round Real, t Date R-2014-1682 V V Page 2 oro Contract Quantity Adjustment/Change Order m,av�z Project Name: SWDT-San Saba Street and West Liberty Avenue Quan.Adj./Change Order No.: 4 CharuviOrder Data contract Item# Item Description Unit Qty. Unit Rice Alrnmlt Timemoon, ON RELOCATE THE AT&T CABLE ON LIBERTY STREET l5 1 $36,000.00 E36,000.00 PROVIDE 3 PHASE ELECTRICAL SERVICE TO BAKER AIKLEN,GOLDEN CHICK, LS 1 §34,440.00 $34,990.00 RELOCATE LIGHT POLE BASES LS 1 E2,400.00 $2,900.00 BAKER AIKLEN SEWER LS 1 $11,590.00 $11,590.00 WELLS FARGO ATM POWER RELOCATION LS 1 1 $4,500.00 $4,500.00 LIGHTING CONDUIT NORTH END OF LIBERTY LS 1 $2,500.00 $2,500.00 DUMPSTER PAD GATE IS 1 $3,500.00 $3,500.00 AT&T/TIME WARNER AT LIBERTY AND ROUND ROCK AVE LS 1 $7,000.00 $7,000.00 HANDRAIL AT DENTEST LF 20 $100.00 $2,000.00 ELECTRICAL LIGHTING PANEL LS 1 $27,800.00 $27,800.00 RELOCATE 40 GFCI OUTLETS IN PLANTERS LS 1 $12,200.00 $12,200.00 CHANGE OUT METER CAN AT 410 WEST UBERTY LS 1 $1,385.00 $1,385.00 TIO DAN'S ATMOS GAS LS 1 $4,850.00 $4,850.00 $0.00 22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 22 A C Page3 oft Coonntract Quantity Adjustment/Change Order Project Name: SWDT-San Saba Street and West Liberty Avenue Quan.Adj./Change Order No.: 4 QuanUtv AdJustment Data log 111,�M-g 1111101212112M Contract Time Adjustment(Days) Bid Item a' Item Description unit Qty. unit Price Amount Street Excacvatlon,Excavation conplete in place and Properly Dispose Onsite(by 1 Method!B-Man QhuTry). Cy 128 $20.00 $2,560.00 Remove P.C.Concrete Curb and Gutter 2 and Properly Dispose Offsite LF 195 $3.00 $585.001 1 Remove P.C.Concrete Driveway,and other Miscmleaneouc Concrete Appubenarccs and Propedy 3 Dispose ORste SF 10577 $3.00 431,731.00 Remove Trees and Property Dispose 4 oftw. EA 39 $250.00 $9,750.00 Subgade Preparation-6"Scanned Moisture Conditioned then Remmpacted 24 Su rade Materials(CH 5ubgrade Area) SY 1072 $5.00 $5,360.00 to izetl Base: of Mu Asp albc Concrete Base 10.5"Thick T%DDT Item 340,Type B(Black Base)complete in place per square yard(Measurement 25 MetlhalB SY 323 $47.00 $15,181.00 Hot Miz Itic Concrete Pavement Surface Course,2 inches Type D complete in place per square yard 27 (Measurement Method B) SY 1072 $13.00 $13,936.00 Construct Portland Cement Reinforced Concrete Sidewalks to 4-Inm Thwkn , complete in place per square foot(as needed to match ROW back to walk on 29 site at each atltlress) SF 34 $6.00 $204.00 Portland Cement Reinforced Concrete 32 Drweway, SF 513 $6.00 $3,078.00 Electric Pull Box,H2O load mpable color 49 to match pavers EA 2 $630.00 $1,260.00 SCH 40 PVC IRRIGATION LINE INCL ALL 54 FITTINGS/APPURTS LF 25 $1.20 $30.00 TREE BUBBLER5,INCL 4'OF FLEX PIPE, 59 FITTINGS/APMIRTS EA 2 $26.00 $52.00 75 6"PIPE(DI AW WA C-100 MIN,CL 200) LF -1 $100.00 -$100.00 6"GATE VALVE,NOT ASSOCIATED 81 W/FIRE HYDRANr EA -1 $1,500.00 -41,500.00 3ACK/BORING 18"Sit ENCASE PIPE, 85 ASTM A-252,GR 2,GROUTING LF -60 $400.00 -$24,000.00 L997 02X2ARE INLET FA 1 $1,000.W 53,PJC, 12"DIA,EXCAVANBKFL LF 30 $60.70 $1,800.00 $0.00 $0.00 $0.00 V %0 Page 4 of 4 Contract Quantity Adjustment/Change Order va ;0.00 $0.00 $O.00 $0.00 $0.00 T 927.00