Loading...
R-2015-2731 - 8/27/2015 RESOLUTION NO. R-2015-2731 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cash Construction Company, Inc. for the Sundance Parkway and Parker Road Street Reconstruction (La Frontera Phase 11) Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Cash Construction Company, Inc. for the Sundance Parkway and Parker Road Street Reconstruction (La Frontera Phase II) Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 27th day of August, 2015. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: e�4SARA L. WHITE, City Clerk 0112.1504;00340427 EXHIBIT Page 1 of 3 Contract Quantity Adjustment/Change Order ��Gl w,08/12 Department: Transportation 3roject dame: Sundance Pkwy&Parker Rd Street Reconstruction Date: 7/17/15 :ity Project Change Order/Quantity D Number TX05MNTLF Adjustment No. 1 Justification lhase changes,and scope changes has caused for a reduction in quantities for some of the bid items. ;UMMARY Amount %Change )riginal Contract Price: $3,088,927.00 'revious Quantity Adjustment(s): $0.00 his Quantity Adjustment: -$357,431.80 'otal Quantity Adjustment(s): -$357,431.80 'otal Contract Price with Quantity Adjustment(s): $2,731,495.20 'revious Change Order(s): $0.00 0% -his Change Order: $13,096.80 0% -otal Change Order(s)To Date: $13,096.80 0% ,djusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Ius Change Order(s)]: $2,744,592.00 lifference between Original and Adjusted Contract Prices: -$344,335.00 iriginal Contract Time: 202 Calendar Days ime Adjustment by previous Quan.Adj./Change Order: 0 Calendar Days ime Adjustment by this Quan.Adj./Change Order: 0 Calendar Days lew Contract Time: 202 Calendar Days Submitted for Approval repared By: (,�.� C3""' B.J.Cash Cash Construction tit Sign ture Printed Name,Title,Company Date Approvals ontractor: B.J.Cash,Cash Construction nature Printed Name,Title,Company Date :ity Project / tanager: — Bill Stablein,Project Manager,CORR Signature Printed Name,Title Date layor/City lanager Alan McGraw,Mayor,CORR Signature Printed Name,Title Date Paec 2 of 3 Contract Quantity Adjustment/Change Order w,08/12 Project Name: Sundance Pkwy&Parker Rd Street Reconstruction Quan.Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment Item# Item Description Unit Qty. Unit Price Amount (Days) 72 Mill Out and Remove 2"from 58+00 to 60+60 SY 1272 $9.00 $11,448.00 0 ITEM-870 WORKZONE PAVEMENT MARKINGS 73 (REMOVABLE)(4")(W) LF 604 $1.20 $724.80 0 ITEM-870 WORKZONE PAVEMENT MARKINGS 74 (REMOVABLE)(24")(W) LF 110 $8.40 $924.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $13,096.80 0 Page 3 of 3 r Contract Quantity Adjustment/Change Order R�:•�II Rf1.T:.lid-.t: 'v,08/12 Project Name: Sundance Pkwy&Parker Rd Street Reconstruction Quan.Adj./Change Order No.: 1 Quantity Adjustment Data Contract Time Adjustment Bid Item# Item Description Unit Qty. Unit Price Amount (Days) 2 ITEM-R104 REMOVE P.C.CONCRETE CURB LF -1,403 $7.00 -$9,821.00 4 ITEM-R104 REMOVE P.C.CONCRETE MEDIANS SF -46 $3.00 -$138.00 6 ITEM-R110 EXCAVATION CY -844 $14.80 -$12,491.20 7 ITEM-R132 EMBANKMENT CY 1,353 $38.00 $51,414.00 8 ITEM-R201 SUBGRADE PREPARATION(12 INCHES) SY -1,250 $7.00 -$8,750.00 9 ITEM-R201 SUBGRADE PREPARATION(6 INCHES) SY -420 $4.00 -$1,680.00 10 ITEM-R211 RECYCLE EXISTING AGGREGATE CY -265 $38.00 -$10,070.00 11 ITEM-R306 PRIME COAT GAL -125 $7.00 -$875.00 ITEM-R340 HOT MIX ASPHALTIC CONRETE 12 PAVEMENT TYPE A TON -1436 $88.00 -$126,368.00 ITEM-R340 HOT MIX ASPHALTIC CONRETE 14 PAVEMENT TYPE C TON 62 $110.00 $6,820.00 ITEM-R430 P.C.CONCRETE CURB AND GUTTER(FINE 15 GRADING) LF -1485 $15.00 -$22,275.00 23 ITEM-4434 4 INCH P.C.CONCRETE MEDIAN SF -46 $17.00 -$782.00 ITEM-T512 2008 PORT CTB(FUR&INST)(LOW 31 PROF)(TY 1) LF -1880 $40.00 -$75,200.00 ITEM-T512 2009 PORT CTB(FUR&INST)(LOW 32 PROF)(TY 2) LF -100 $42.00 -$4,200.00 ITEM-T512 2026 PORT CTB(MOVE)(LOW PROF)(TY 33 1) LF -2860 $9.00 -$25,740.00 ITEM-T512 2027 PORT CTB(MOVE)(LOW PROF)(TY 34 2) LF -340 $9.00 -$3,060.00 ITEM-T512 2044 PORT CTB(REMOVE)(LOW PROF) 35 (TY 1) LF -1880 $11.00 -$20,680.00 ITEM-T512 2045 PORT CTB(REMOVE)(LOW PROF) 36 (TY 2) LF -100 $11.00 -$1,100.00 37 ITEM-R551 PIPE UNDERDRAINS(TY II)(4 IN) LF -1244 $40.00 -$49,760.00 39 ITEM-R640 MOTARED ROCK WALL SY -138 $300.00 -$41,400.00 ITEM-870 WORK ZONE PAVEMENT MARKINGS 48 (REMOVEABLE)(4")(Y) LF -867 $1.20 -$1,040.40 ITEM-870 WORK ZONE PAVEMENT MARKINGS 49 (REMOVEABLE)(24")(Y) LF -28 $8.40 -$235.20 TOTALS:1 -$357,431..801 0