Loading...
R-2015-2770 - 8/27/2015 RESOLUTION NO. R-2015-2770 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Patin Construction for the Seton Parkway Extension/Medical Center Parkway Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Patin Construction for the Seton Parkway Extension / Medical Center Parkway Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 27th day of August, 2015. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: q ( J SARA L. WHITE, City Clerk 0112.1504;00340477 EXHIBIT uA„ Page I of 3 Contract Quantity Adjustment/Change Order rev,a6/i5 Department: Transportation Project Name: Seton Parkway Extension Medical Center Parkway Date: 7/31/15 City Project Change Order/Quantity ID Number Adjustment No. 1 Justification Quantity Adjustment/Change Order#1 Water relocation South end and 63 days contract time for weather. Electrical Conduit,Steel Encasement Piping, Electrical Bore for the Developer and 14 days contract time. SUMMARY Amount %Change Original Contract Price: $2,730,287.50 Previous Quantity Adjustment(s); This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): $0.00 Total Contract Price with Quantity Adjustment(s): $2,730,287.50 Previous Change Order(s): 0.00 This Change Order: $127,800.00 0.05 Total Change Order(s)To Date: $127,800.00 0.05 Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $2,858,087.50 Difference between Original and Adjusted Contract Prices: $127,800.00 Original Contract Time: 220 Time Adjustment by previous Quan.Adj./Change Order: Time Adjustment by this Quan.Adj./Change Order: 77 New Contract Time: 297 Submitted for Approval Prepared By: Signature Printed Name,Title,Company Date Approvals Contractor Signa re Printed Name,Title,Company Date City Project rZ ` I Manager: �,t `` ��OJO `�l Signature Printed Name,Title Date Mayor/City Manager Signature Printed Name,Title Date Page-1 of 3 Contract Quantity Adjustment/Change Order •Yr�r — �)y Raurtu rr;]CH l:u:, rev,06/15 Project Name: Seton Parkway Extension Medical Center Parkway Quan.Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment Item# Item Description Unit Qty. Unit Price Amount (Days) C01-1 Concrete Crew Box Culvert Headwall Days 5 $2,500.00 512,500.00 C01-2 12" Ductal Iron Pipe- Relocated LF 60 $85.00 $5,100.00 C01-3 12"45 Degree Bends EA 4 $150.00 $600.00 Electrical Conduit Bore Under Existing C01-4 Seton Parkway EA 4 $3,800.00 $15,200.00 C01-5 2 Each 6"Conduits LF 1200 $18.00 621,600.00 C01-6 2 Each 4"Conduits LF 1200 $16.00 $19,200.00 C01-7 1 Each 2"Conduits LF 1200 $8.00 $9,600.00 COI-8 30"Steel Casing Pipe LF 100 $120.00 $12,000.00 C01-9 12"Steel Casing Pipe LF 400 $80.00 $32,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS:Ji $127800.00 0 Pate 3 of 3 Contract Quantity Adjustment/Change Order gr HOUND ROCK 1! 06/15 Project Name: Seton Parkway Extension Medical Center Parkway Quan.Adj./Change Order No.: 1 Quantity Adjustment Data Contract Time Adjustment Bid Item # Item Description Unit Qty. Unit Price Amount $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: 50.00 0