Loading...
R-2015-2827 - 9/10/2015 RESOLUTION NO. R-2015-2827 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with Schrickel, Rollins and Associates, Inc. for the OSPV Multipurpose Complex and Soccer Complex Improvements 2014 Project, and WHEREAS, Schrickel, Rollins and Associates, Inc. has submitted Supplemental Contract No. 1 to the Contract to modify the provisions for the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 1 with Schrickel, Rollins and Associates, Inc.,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 1 to the Contract with Schrickel, Rollins and Associates, Inc., a copy of same being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 10th day of September, 2015. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: 9ax SARA L. WHITE, City Clerk 0112.1504;00341437 EXHIBIT „A„ STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: SCHRICKEL,ROLLINS AND ASSOCIATES,INC. ("Engineer") ADDRESS: 1161 Corporate Drive West, Suite 200,Arlinaton,TX 76006 PROJECT: OSPV Multipurpose Complex and Soccer Complex Improvements 2014 This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Schrickel, Rollins and Associates, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 13th day of February, 2014 for the OSPV Multipurpose Complex and Soccer Complex Improvements 2014 Project in the amount of$1,223,000.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$496,000.00 to a total of$1,719,000.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering_ Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $496,000.00 the lump sum amount payable under the Contract for a total of$1,719,000.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rev.12/01/08 0199.1406;00340104 84275 1 SCHRICKEL, ROLLINS AND ASSOCIATES, INC. By: Date CITY OF ROUND ROCK APPROVED AS TO FORM: By: Alan McGraw,Mayor Stephan L. Sheets, City Attorney Date Supplemental Contract Rev.12/01/08 0199.1406;00340104 84275 2 ADDENDUM TO EXHIBIT B Engineering Services Attached Behind This Page N11Vd W,J MV...,U® EXHIBIT B Engineering Services CONSULTANT will perform additional services as described below. 1. Part I - Elements, A.1. Project Description, paragraph a.: Add to the scope an enlarged two story central soccer clubhouse building with meeting and party rooms (10,000 SF), a 60,000 SF soccer field canopy, a second restroom building on the south end of the MP complex,a secondary park road connecting to Kenney Fort Blvd., five artificial turf fields, and additional sports lighting on the championship field. 2. Part I- Elements,A.6.- Project Budget: Add to the project construction budget$14,000,000 to result in a total construction budget of: Multipurpose Complex $ 25,000,000 Soccer Complex 3,000,000 Total Construction Budget $ 28,000,000 Round Rock—OSPV MP&Soccer Complexes Exhibit B Supplemental Contract No.One August 6,2015 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page 041 NAK �Jm VWM EXHIBIT C WORK SCHEDULE CITY OF ROUND ROCK Old Settlers Park at Palm Valley Multipurpose Complex and Soccer Complex Improvements Project Cal.days to Weeks to Stage of Services Complete Complete Projected Date Authorization from City to Proceed with Project February 13,2014 Site Planning Phase 30 4 March 18,2014 Design Development Phase(DD) 34 5 April 18,2014 City Review of DD 14 2 May 2, 2014 Construction Documents Phase(CD) 75%Submittal 30 4 April,2015 75%Review 14 2 May 29,2015 95%Submittal 60 8 July 30,2015 95%Review 14 2 August 14,2015 Final Review Submittal for Building Permit 30 4 September 16,2015 Corrections after Permit Review 14 2 September 30,2015 Bidding Phase Send documents to Printer 1 October 1,2015 Printing 3 0 October 5,2015 Advertisement for Bids 6 1 October 12,2015 Advertisement for Bids 7 1 October 19,2015 Bid Opening 32 5 November 5,2015 City Council Meeting to Approve Bids 14 2 November 25,2015 City Approve and Execute Contract 21 4 December 18,2015 Construction Phase Phase I Begin Construction on Multipurpose Fields January 4,2016 Complete Turf Installation on Fields April 30,2016 Complete Turf Establishment on Fields July 31,2016 Complete Multipurpose Fields October 30,2016 Open for Play Spring,2017 Phase 2 Begin Construction on Soccer Fields December 1,2016 Complete Turf Establishment on Fields July 31,2017 Complete Soccer Fields September 30,2017 Open for Play Spring 2018 Round Rock-OSPV-Multipurpose/Soccer Complexes Work Schedule Schrickel,Rollins and Associates,Inc. 5226 Page 1 of 1 ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page WIN KK trim EXHIBIT D Fee Schedule Original Amt. Revised Amt. A. Basic Professional Planning and Design Services Site Plan $ 112,000 $ 112,000 Design Development 150,000 150,000 Contract Documents 690,000 972,000 Bidding Administration 20,000 82,000 Construction Administration 177,000 329,000 Total $ 1,149,000 $ 1,645,000 B. Other Related Services Record Drawings $ 12,000 $ 12,000 3-D Animation $ 27,000 $ 27,000 C. Subtotal Professional Services $ 1,188,000 $ 1,684,000 D. Reimbursable Expenses (Allowance - not to exceed) $ 35,000 $ 35,000 E. Total Services and Expenses $ 1,223,000 $ 1,719,000 Round Rock- OSPV MP&Soccer Complexes Exhibit D Supplemental Contract No. One August 6, 2015