R-2015-2794 - 9/10/2015 RESOLUTION NO. R-2015-2794 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cash Construction Co., Inc. for the Southwest Downtown District Infrastructure Improvements Phase 5A Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 2,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with Cash Construction Co., Inc. for the Southwest Downtown District Infrastructure Improvements Phase 5A Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 10th day of September, 2015. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: — &AL . � SARA L. WHITE, City Clerk 0112.1504;00341461 EXHIBIT "A" Pa.-e I of 3 _ Contract Quantity Adjustment/Change Order ev,08/12 )epartment: Transportation 3roject lame: CORR SWDT Ph 5A Date: 7/16/15 -ity Project Change Order/Quantity :D Number SWDT5 Adjustment No. 2 lustification additional quantity adjustments for discrepancies between the plans and bid quantities for electrical duct banks(EO&E6),&capped inlets for storm sewer. additional conduit added for Oncor in Duct Bank A. WMMARY Amount %Change )riginal Contract Price: $13,773,063.00 'revious Quantity Adjustment(s): $567,481.00 his Quantity Adjustment: $61,840.00 'otal Quantity Adjustment(s): $629,321.00 'otal Contract Price with Quantity Adjustment(s): $14,402,384.00 'revious Change Order(s): $132,905.00 1% "his Change Order: $56,850.00 0% -otal Change Order(s)To Date: $189,755.00 1% kdjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) 'lus Change Order(s)j: $14,592,139.00 Difference between Original and Adjusted Contract Prices: $819,076.00 )riginal Contract Time: 720 Calendar Days ime Adjustment by previous Quan.Adj./Change Order: 35 Calendar Days ime Adjustment by this Quan.Adj./Change Order: 0 Calendar Days lew Contract Time: 755 Calendar Days Submitted for Approval repared By: B.J.Cash,Cash Construction SignatUW Printed Name,Title,Company Date Approvals ontractor: 1 W B.J.Cash,Cash Construction Si tore Printed Name,Title,Company Date :ity Project lanager: 10-0 , Bill Stablein,Project Manager,CORR C1 c�-7— "f,5— Signature Printed Name,Title Date tayor/City lanager Alan McGraw,Mayor,CORR Signature Printed Name,Title Date Pa-e 2 of 3 ' T Contract Quantity Adjustment/Change Order RM;\A RMI 111'As .v,08/12 Project Name: CORR SWDT Ph 5A Quan.Adj./Change Order No.: 2 Change Order Data Contract Time Adjustment Item# Item Description Unit Qty. Unit Price Amount (Days) 313 Move Gas Line on Mays Street LS 1 1 $5,850.00 $5,850.00 CONCRETE COATING BASE COAT FOR CONC.BRIDGE WALL(TRAFFIC SIDE ONLY INCLUDING TOP OF 314 RAILING) SF 14,000 $1.00 $14,000.00 GATEWAY ARCH STEEL ADDITIONS(ADDED ENCLOSURE PANELS,LIGHT TROUGH 2 LEVELS EACH 315 SUPPORTTOWER LS 1 $37,000.00 $37,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $56,850.00 0 Pa-e 3 of 3 Contract Quantity Adjustment/Change Order igvmn anc�inxs av,OB/12 Project Name: CORR SWDT Ph 5A Quan.Adj./Change Order No.: 2 Quantity Adjustment Data Contract Time Bid Item# Item Description Unit Adjustment p Qty. Unit Price Amountrnmuci Storm 166 Cap Existing Inlet EA 2 $2,500.00 $5,000.00 $0.00 $0.00 Electric Items 97 E6M-Duct Bank(Electrical&Communications) LF 31 $320.00 $9,920.00 94 EO-Duct Bank(Electrical&Communications) LF 306 $180.00 $55,080.00 Three each 4-inch Communication lines to/from Duct 92 Bank to service provider manhole/handhole LF 348 $80.00 $27,840.00 $0.00 Water $0.00 Jacking or Boring 18"Steel Encasement Pipe,ASTM A- 83 252,Grade 2,including grouting LF -60 $600.00 -$36,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS 61840.00 0 RESOLUTION NO. R-2015-2797 WHEREAS, the City has a need for service support to the Police Department's communication dispatch infrastructure; and WHEREAS, Motorola Solutions, Inc. has submitted an agreement to provide said services; and WHEREAS, the City Council desires to enter into said agreement with Motorola Solutions, Inc.,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City an annual Services Agreement with Motorola Solutions, Inc., a copy of said agreement being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 10th day of September, 2015. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Clerk 0112.1504;00341453