Loading...
CM-2015-883 - 9/8/2015ROUND ROCK I l%a'., rev, 06/15 Department: Project Name: City Project ID Number event 3ustification materials to modify currelt4'plan Contract Quantity Adjustment/ Change Order General Services Buildinq B SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Approval Page 1 of 3 Date: 8/24/15 Change Order/Quantity Adjustment No. 1 Amount $1,120,134.00 $1,120,134.00 $21,100.00 $21,100.00 $1,141,234.00 $21,100.00 0 0 0- 0 Change 0.00 0.02 0.02 Prepared By: / Travis Wilkes CORR Building Construction Manager &J'? -61) S Signature Printed Name, Title, Company Date Approvals Contractor: /�-�,,�/ Chaney Cox ignature Printed Name, Title, Company Date City Project �-' Manager: Chad McDowell CORR General Services Director `J Si fiatur Printed Name, Title Date Mayor/City ��!/ Lauli-7c., • l e nA/ 1 F (,,Px (eq (-Manager o— Cr/ S- c J Signature Printed Name, Title J Date Contract Quantity Adjustment/ Change Order ROUND ROCK T EXAS rev, 06/15 Project Name: Building B Quan. Adj./Change Order No.: rhnnnn nM- n.+� Page 2 of 3 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 1 AM services 1 $460.00 $460.00 2 AW services 1 $280.00 $280.00 3 APAC wheeler 1 $2,150.00 $2,150.00 4 Chaney Cox 1 $400.00 $400.00 5 Chaney Cox 1 $425.00 $425.00 6 Chaney cox 1 $825.00 $825.00 7 Chaney cox 1 $925.00 $925.00 8 chaney Cox 1 $194.00 $194.00 9 Colvin Electric 1 $450.00 $450.00 10 Colvin Electric 1 $248.00 $248.00 11 Colvin Electric 1 $346.00 $346.00 12 Colvin Electric 1 $615.00 $615.00 13 RFS 1 $17,685.00 $17,685.00 14 Chaney Cox 1 $3,750.00 $3,750.00 15 AW services 1 -$80.00 -$80.00 16 CAPS Plumbing 1 -$2,683.00 -$2,683.00 $0.00 $0.00 17 Pay & Park 1 -$4,890.00 -$4,890.00 18 1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: 21100.00 0 PROPOSAL FOR CHANGE ORDER TO CONTRACT POST OFFICE Bos 1902 TEmn>i.E, TEXAS 76503 OFFICE: (251) 939-0741 FAX: (2.34) 939-3359 R'\C W.CFiA\EYCOX.00M Job # 375 Date: 8/21/15 Pagel of 21 PR 09 Description: Add (3) Fire extinguishers and cabinets per ASI 07 Date: Project: RRSC: Buildin 'B' Finish -out General Contractor: Chaney -Cox Construction Inc. Direct Labor $0 T & 1 30% of Labor $0 General Conditions (Equip./Expenses) $0 On -Site General & Administrative Expenses $0 GENERAL CONTRACTOR SUBTOTAL A $0 Subcontractors/Suppliers: Description Amount 1 TOTAL FROM 'ADDS'WORKSHEET $28,753 2 1 $0 3 TOTAL FROM 'CREDITS' WORKSHEET $7,653 4 $0 5 $0 6 $0 7 $0 8 $0 9 $0 10 $0 11 $0 12 $0 13 $0 14 $0 15 $0 16 $0 SUBCONTRACTORS/SUPPLIERS SUBTOTAL 1$21,100 On -Site General and Administrative on Subcontractors work C $ - SUBTOTAL A, B,& C $ 21,100 Chaney -Cox OH & PROFIT Allocation: CHANGE ORDER TO THE CONTRACT #1 $ - TOTAL COSTS 1 $ 21,100 The above quoted cost and time extension is based on receiving approval of this field order by N/A . Any delay beyond that date may increase the cost and require an additional time extension. Time extension required for this field order is 0 working days. Chaney -Cox Construction Inc. reserves the right to claim other costs and time extensions because we cannot determine the full impact, if any, to the construction schedule and resulting costs at this time. Owner's Review Initial: Date: Architect's Approval Signed: Consultant's Approval Signed: Date: Chaney -Cox Construction Inc. Signed: Date: Date: POST OFFICE BOX 1902 TEMPLE, TEXAS 76503 OFFICE: (25.1) 939-07-11 F:vx: (251) 939-3359 CIIANI VC0X. CO?I PROPOSAL FOR CHANGE ORDER TO CONTRACT - CREDITS WORKSHEET Job # 3751 Date: 8/21/151 1 PR 16 Description: Delete 2" poured rubber floor at Adult Exercise area Date: Project: RRSC: Buildin 'B' Finish -out General Contractor: Chaney -Cox Construction Inc. Direct Labor $0 T & 1 30% of Labor $0 General Conditions (Equip./Expenses) $0 On -Site General & Administrative Expenses $0 GENERAL CONTRACTOR SUBTOTAL (A) $0 Subcontractors/Suppliers: Description Amount Delete 2" poured rubber floor 1 PLAY & PARK STRUCTURES at Adult Exercise area ($4,890 2 A&I SERVICES Delete (3) feminine napkin ($80) 3 C.A.P.'S PLUMBING Credit for tap at water meter, ($2,683) 4 $0 5 $0 6 $0 7 $0 8 $0 9 $0 10 $0 11 $0 12 $0 13 $0 14 $0 15 $0 16 $0 SUBCONTRACTORS/SUPPLIERS SUBTOTAL ($7,653) On -Site General and Administrative on Subcontractors work C) $ _ SUBTOTAL A, B,& C $ (7,653) Chaney -Cox OH & PROFIT $ - Allocation: CHANGE ORDER TO THE CONTRACT #1 CREDITS TOTAL $ - TOTAL COSTS 1 $ (7,653) The above quoted cost and time extension is based on receiving approval of this field order by N/A . Any delay beyond that date may increase the cost and require an additional time extension. Time extension required for this field order is 0 working days. 'Chaney -Cox Construction Inc. reserves the right to claim other costs and time extensions because we cannot determine the full impact, if any, to the construction schedule and resulting costs at this time. Owner's Review Initial: Date: Architect's Approval Signed: Consultant's Approval Signed: Date: Chaney -Cox Construction Inc. Signed: Date: Date: -------- Original Message -------- Subject: RE: [FWD: RE: Rubber Floor at Exercise Area] From: "James Robertson" <james@robertsonplaygrounds. com> Date: Tue, August 04, 2015 4:35 pm To: <kyle@chaneycox.com> Gotche — removing the 456 SP 0 2,0" around the cross fit unit will reduce the contract amount by $4,880,84, PROPOSAL A&I SERVICES, INC. DATE: AUGUST 14, 2015 TO: CHANEY-COX CONSTRUCTION ATTN: KYLE LITTLE RE: FIRE EXTINGUISHER AND CABINET ADD TOILET ACCESSORY DELETION ROUND ROCK SPORTS CENTER BUILDING B ADD: TT"Ir W VTT&Tl iTiOWWW Ll A XT" !' A "TXTTTO P'}OG nA BY JL INDUSTRIES 3 EA. — ABS 16RC FIRE EXT. CABINETS, RED WITH CLEAR FACE, FIRE EXT. LOGO 3 EA. — COSMIC 5E FIRE EXT., 5#, 3A-40BC RATED, TX INSPECTION TAG ................................................... . INSTALL ON STEEL COLUMNS DEDUCT: TOILET ACCESSORIES....................................................................................<$80.00 3 EA. — 0852 FEMININE NAPKIN DISPOSALS ($16.50) 1 EA. — 0210 PAPER TOWEL DIPSENSER ($30.50) Td -%T A T nnrnr, 4112on nn THIS QUOTE IS VALID FOR 30 DAYS. • MATERIALS ONLY • PLUS TAX IF APPLICABLE • F.O.B. JOBSITE BY: CHARLIE ROSS 105 Halmar Cove, Suite 160 Georgetown, TX 78628 Email: cross@aisdivl0.com Phn: (512)931-2307 Fax: (512) 931-2505 1 v 'aW 't�a��: e3iuzra+�rrriei�+oadt�r. sir:�,,.�..w�r t+►hs.�.�.�r Konrrymnir:n�:.asn�•c.v:.r.., .,��.:s.�r�r.w,.p Sdpr-sr.4g ., 1. � '�. I•- .1;<_.z-._ �,.+rwar�a�w.�.www�.++w.�wsrarrwr - «+rtaoi..� e+B.cMwl+rtarFw •t.«w. ria ta.-«.. n.+st, o,a1d:RR wr.ins.o... tb=F �. via..—. --w• r...,�.a.+.a.;.*«,e.. E lift t7t f gyral► a.ru.4.,.F.-=...M.,tir*if:�t.'r,wrw«,�-�. ?ur��tpdulnr®i�rn�ayll— ��;r<.��ws,vat mcd n an uanu..n r w* -d .. r rrr +, OWA rma 0 , 4op uy rt«. * I.AMOW W wWil► Ura+•+ +.:•:.,+r*r.__.._... — _ _ �..-ate• _ ,--°.—<^ ._ POST OrFicr Bus 1902 TEMPLE, TrXAs 76503 OFFICE: (254) 9.39-0741 PAs: (25.1) 939.3389 WWW.CIIANEYCOs.COM PROPOSAL FOR CHANGE ORDER TO CONTRACT - ADDS WORKSHEET Job # 375 Date: 8/21/151 1 1 PR 09 Description: Add (3) Fire extinguishers and cabinets per ASI 07 Date: Project: RRSC: Building 'B' Finish -out General Contractor: Chaney -Cox Construction Inc. Direct Labor $0 T & 1 30% of Labor $0 General Conditions (Equip./Expenses) $0 On -Site General & Administrative Expenses $0 GENERAL CONTRACTOR SUBTOTAL (A) Iso Subcontractors/Suppliers: Description Amount Add (3) Fire extinguishers and 1 A&I SERVICES cabinets per ASI 07 $460 Upgrade partition connection brackets to continuous 2 A&I SERVICES brackets $280 Seal Coat Existing Exposed 3 APAC, Wheeler Asphalt $2,150 4 Chaney -Cox Construction, Inc. Labor to install protection over $400 5 Chaney -Cox Construction, Inc. Materials to protect finished $425 6 Chaney -Cox Construction, Inc. Power wash and prep prior to $825 7 Chaney -Cox Construction, Inc. "Beam Fix" per RFI 05 $925 8 Chaney -Cox Construction, Inc. Purchase (2) wire guards for $194 9 COLVIN ELECTRIC Provide meter base in lieu of $450 10 COLVIN ELECTRIC Upsize breakers for Heat $248 11 COLVIN ELECTRIC Weather proof back boxes for $346 12 COLVIN ELECTRIC Up -charge for custom color at $615 13 RFS Add Mondo flooring at Adult $17,685 14 $0 15 $0 16 $0 SUBCONTRACTORS/SUPPLIERS SUBTOTAL 1$25,003 On -Site General and Administrative on Subcontractors work C $ - SUBTOTAL A, B,& C $ 25,003 Chaney -Cox OH & PROFIT $ 3,750 Allocation: CHANGE ORDER TO THE CONTRACT #1 CREDITS TOTAL $ - TOTAL COSTS $ 28,753 The above quoted cost and time extension is based on receiving approval of this field order by N/A . Any delay beyond that date may increase the cost and require an additional time extension. Time extension required for this field order is 0 working days. 'Chaney -Cox Construction Inc. reserves the right to claim other costs and time extensions because we cannot determine the full impact, if any, to the construction schedule and resulting costs at this time. Owner's Review Initial: Date: Architect's Approval Signed: Consultant's Approval Signed: Date: Chaney -Cox Construction Inc. Signed: Date: Date: PROPOSAL A&I SERVICES, INC. DATE: AUGUST 14, 2015 TO: CHANEY-COX CONSTRUCTION ATTN: KYLE LITTLE RE: FIRE EXTINGUISHER AND CABINET ADD TOILET ACCESSORY DELETION ROUND ROCK SPORTS CENTER BUILDING B IRE EXTINGUISHERS AND CABINETS..............................................................$385.00 Y JL INDUSTRIES EA. — ABS 16RC FIRE EXT. CABINETS, RED WITH CLEAR FACE, FIRE EXT. LOGO EA. — COSMIC 5E FIRE EXT., 5#, 3A-40BC RATED, TX INSPECTION TAG VICE LABOR TO INSTALL CABINETS ...................................................$ 75.00 ALL ON STEEL COLUMNS ALADD.....................................................................................................$460.00 DEDUCT: .................................................................................... . 3 EA. — 0852 FEMININE NAPKIN DISPOSALS ($16.50) 1 EA. — 0210 PAPER TOWEL DIPSENSER ($30.50) TAT i TT i/1T G.- AA THIS QUOTE IS VALID FOR 30 DAYS. • MATERIALS ONLY • PLUS TAX IF APPLICABLE • F.O.B. JOBSITE BY: CHARLIE ROSS 105 Halmar Cove, Suite 160 Georgetown, TX 78628 Email: cross@aisdivl0.com Phn: (512) 931-2307 Fax: (512)931-2505 PROPOSAL A&I SERVICES, INC. DATE: AUGUST 13, 2015 TO: CHANEY COX CONSTRUCTION ATTN: KYLE LITTLE RE: CONTINUOUS "F" BRACKETS ROUND ROCK SPORTING CENTER BUILDING B TOILET ACCESSORIES....................................................................................$160.00 8 EA. — CONTINUOUS "F" BRACKETS AT CMU WALLS, EXTRUDED ALUMINUM SERVICE LABOR TO INSTALL "F" BRACKETS............................................$120.00 TOTALPRICE.................................................................................................$280.00 THIS QUOTE IS VALID FOR 30 DAYS. • MATERIALS AND INSTALLATION • PLUS TAX IF APPLICABLE • F.O.B. JOBSITE BY: CHARLIE ROSS 105 Halmar Cove, Suite 160 Georgetown, TX 78628 Email: cross@aisdivl0.com Phn: (512) 931-2307 Fax: (512) 931-2505 APAC-Texas, Inc. dba Wheeler 1 CHISHOLM TRAIL, SUITE 450 ROUND ROCK, TEXAS 78681 Phone: (512) 346-3839 Fax: (512) 388-2268 www.apac-texas.com ESTIMATE To:CHANEY - COX PO BOX 1902 TEMPLE, TX 76503 DESCRIPTION OF WORK Job Number: KW21023NT ATTN: Kyle PO Number: Date: 8/3/2015 Estimator: Kim Wheeler Job Name: Round Rock SPort Center Job Location: Chisholm Trail Round Rock, TX Phone: 254-939-0741 Fax: 254-939-3570 ASPHALT murm EMULSION 0.00 0.00 0.00 0.00 0.00 $0.00 $2,150.00 ALL OF THE ABOVE WORK TO BE COMPLETED IN A SUBSTANTIAL AND WORKMANLIKE MANNER FOR THE SUM OF: Total Price: $2,150.00+ Tax (if applicable) The undersigned states that al I the information provided herein is true and correct and undersigned and read and hereby agrees to the terms and conditions listed above on this quote. The net amount of contract is to be paid upon completion of work. Any deviation or alteration from the above specifications involving extra cost of material or labor will be executed only upon w ritten orders for same and w ill become an ex tra charge ov er the su m mentioned in this contract. All agreements must be m ade in w riting. Asphalt pav ing for new ly constru cted parking to ts, ro adways, and dr iveways are proposed to comply with ty pical T XDOT hot mi x st andards. Any other pav ing specification must be noted in the comment section under each paving line item of this proposal form and priced accordingly. All permits and fees are excluded unless otherwise noted. APAC Texas Inc.- Wheeler Companies not responsible for utility lines le ss than 12 inches deep. APAC Texas Inc.- Wheeler Com panies to carry Workers Compensation, General Liability and Auto Insurance upon the labor furnished in this Contract. Your signed acceptance constitutes a contract between you and the undersigned. All sums payable under thi s contract [or agreement] shall be paid to Wheeler Companies a t its offices located in R ound Rock, Williamson County, Texas. The proper venue for any action hereunder, whether legal or equitable, shall be maintained in Round Rock, Williamson County, Texas. Interest will accrue on all sums past due or found to be past due under this contract [or agreement] at the rate of eigh teen percent (18%) compound interest per annum. The prevailing party agrees to pay reasonable attorney fees, all costs of court, and any other expenses incurred in the event of a litigated dispute between the parties. Owner of Property Address Job Address City/ST Zip Code Tax Exempt Yes or No Please attach tax exempt form Certified payroll job yes or no Bond # Address Zip Code Telephone Fax Name of Surety Telephone _Fax_ Email Due to fluctuating asphalt prices, prices quoted above shall remain in effect for no more than 60 days from proposal date. This proposal must be endorsed and returned by an authorized company official, owner, owner's agent, or individual seeking the above scope of work within the 30 day period in order to hold these unit prices firm for no longer than 60 days from proposal date. Contracts or subcontracts generated from our proposed unit prices may be used to same effect as long as written contract is agreed to and endorsed by a company officer of APAC Texas, Inc. — Wheeler Companies within the 30 days from proposal date. Safety is the utmost importance. Accepted: / / RESPECTFULLY SUBMITTED, BY: Kim Wheeler kim.wheeler@apac.com t G 0 w a0 ri E a� fv U •L !1 fZ Ln 0) C N fb V iA- O fU � fZ U Ln C �N _0 C iA- O @l !Z � N L o M V E fU W 7 0 U) fz O C O 0 Ln iZ _0 L fa f6 L 1O iZ f6 - N 0x - O CL c G m f1 OU U O f fa 4-- r�-I0 f/I p E O ri � d. O� N 7 O N N iA- XCY o Ln Ln 0 p fll = _ L U) a) (D fa , fn W 'T O� C W fa / f -p Q 0 41 N' M y co 0 -0 @j t O u v, Q fa V) O II fv fa fn 3 c_ W V V se '0:� w W f1 fY Q L 4: O fn i - > m fll 3 c fv � L w Co Q Lz,a fa O a) N O N >UI_ CL U o"0 -a; aL o J Q N U � 4. oa E a) N C 4, IL +r cn O N O D ru � s E w o L .L a 0< Ln � H ;.; u o u -0 a fv fa fa O =i U aQ CO V LL &A F- v 7� en Oct O wu 0' t G 0 w a0 ri -------- Original Message -------- Subject: RE: RRSC: Bldg 'B' - RFI 05 Beam Fix From: Richard Will <richardwill@roundrocktexas.gov> Date: Mon, August 10, 2015 1:46 pm To: "kyle@chaneycox.com" <kyle@chaneycox.com> Sounds good, Richard WIII SLI por-intotide nt Building Construction General Services Division 212 Commerce Blvd Round Rook, Tors 78664 Office: 512-341-3311 Coll: 512-351-5500 richardwill@roundrocktexas.gov From: kyle@chaneycox.com [mailto:kyle@chaneycox.com] Sent: Monday, August 10, 2015 12:32 PM To: Richard Will Cc: kyle@chaneycox.com Subject: RE: RRSC: Bldg'B' - RFI 05 Beam Fix Richard, This is to follow-up on our correspondence below. The outcome of the 'beam fix' per RFI 05 on a T&M basis is as follows: SUBCONTRACTOR - Labor: (3) men @ $16 per/hr @ 8 hrs. each = $384 - Labor Burden 33% = $127 - Labor Subtotal = $511 - Misc. / Material / Equpt.: - (2) tubes epoxy @$40 ea. _ $80 - Equpt to saw -cut & demo, haul dirt & demoed concrete spoils = $100 - Misc. / Material / Equpt. Subtotal = $180 Labor Subtotal $511 Misc. /Material / Equpt. Subtotal +$180 $691 OH&P 15% 104 SUBCONTRACTOR TOTAL = $795 CHANEY-COX MATERIAL TOTAL = $130 (CONCRETE MATERIAL, MIN. 1 YARD. We furnish concrete, subcontractor everything else.) TOTAL T&M COST FOR 'BEAM FIX'= $925✓ (HTTP://WWW.AMERICAN-TIME.COM) WIREGUARDS (/) MENU t s: t .com at clock f htt s• m. f..com/atsdock) .& s: m.it.com6user/A[eri e I qnQL in IM12sw/m. in.com/company/32-96624) 1.800.328.8996 (tel:1.800.328.8996) Resources (/resources) • Support (/support) • About Wire Guards (/about -us) • Contact Us (/contact -us) PRODUCTS BY APPLICATION (/PRODUCTS -BY - APPLICATION) PRODUCTS BY SHAPE PRODUCTS BY COLOR PRODUCTS BY MATERIAL (/PRODUCTS -BY -SHAPE) (/PRODUCTS -BY -COLOR) (/PRODUCTS -BY -MATERIAL) CLICK TO CALL 1-800-328-8996 (tel:8003288996) PRODUCTS BY APPLICATION (/PRODUCTS -BY -APPLICATION) PRODUCTS BY SHAPE (/PRODUCTS -BY -SHAPE) PRODUCTS BY COLOR (/PRODUCTS -BY -COLOR) PRODUCTS BY MATERIAL (/PRODUCTS -BY -MATERIAL) Order Summary Thank you! Order Number 252203 is complete. Please use this order number as a reference for any customer service needs regarding this order. Order Items Product SKU Details GUARD WIRE 16" X 16 1/4" X 14"D 3 GAUGE OVERSIZED SHIPPING CHARGE Price Quantity $64.95 ea 2 Billing Address Name: Company: Address: City, State, Zip: Country: Phone: Email: Shipping Address Name: Company: Address: City, State, Zip: Country: Shipping Information Shipping Type: Ground Payment Information Payment Type: Credit Card Card Type: Discover Card Number: ************7554 Expiration: 9/2016 Purchase Order Number 375 Kyle Little Chaney -Cox Construction 6102 South General Bruce Drive Temple TX 76502 USA 254-939-0741 kyle@chaneycox.com Kyle Little Chaney -Cox Construction 6102 South General Bruce Drive Temple TX 76502 USA Order Subtotal: Shipping: $129.90 $64.04 Q'1 c nn TOTAL: '-- A $194 Shipping (/support/shippin Returns (/support/returnsl Sitemap (/sitemap)) Terms and Conditions (/su000rt/terms-and-conditions) DATE: NAME: COMPANY: RE: CHANGE ORDER # CCCOI-06 August 4 2015 y j Kyle Little Chaney -Cox Construction Round Rock Sports Center Building B Finish Change 30a2p breakers or HP units to 40a2p breakers per Mechanical Requiements CHANGE ORDER REQUEST MATERIAL (SEE ATTACHED) + SALES TAX (8.25%) MATERIAL TOTAL 0.00 INSTALLER HOURS AT 1.00 FOREMAN HOURS AT 0.00 FOREMAN OT HOURS AT 0.50 GENERAL SUPER/PM MISCELLANEOUS EXPENSES EQUIPMENT RENTAL PERMITS FREIGHT MISCELLANEOUS TOTAL *** ADDITIONAL TIME REQUEST *** CHANGE ORDER WILL ADD DAYS TO CONSTRUCTION SCHEDULE. SHOULD CHANGE ER WORK BE APPROVED WITH NO ADDITIONAL ? GIVEN OVERTIME LABOR WILL ADD TO THE NGE ORDER PRICE AS FOLLOWS: 'ALLER O.T. 0.00 X$24.00 X 1/2 = $0.00 -MAN O.T. 1.00 X$34.00 X 1/2 = $17.00 RTIME LABOR TOTAL $18.00 COLVIN ELECTRIC. INC. - License: TECL #17495 120.00 0.00 $120.00 $24.00 /HOUR $0.00 $36.00 /HOUR $36.00 $51.00 /HOUR $0.00 $65.00 /HOUR $32.50 SUBTOTAL LABOR $68.50 LABOR BURDEN @ 39% $26.72 LABOR TOTAL $95.22 $0.00 $0.00 0.00 $0.00 MATERIAL $120.00 MISCELLANEOUS $0.00 LABOR $95.22 SUBTOTAL $215.22 OVERHEAD & PROFIT (15%) $32.28 TOTAL 3901 KELLY LANE - PFLUGERVILLE, TEXAS 7866C Regulated by the Texas Department of Licensing and Regulations P.O. Box 12157, Austin, TX, 78711 1-800-803-9292,512-463-6599 (512) 388-2271 website: www.license.state.tx.us/complaints CHANGE ORDER CCC01-06 Page 2 Change 30a2p breakers or HP units to 40a2p breakers per Mechanical Requiements MATERIALS QUANTITY UNIT COST TOTAL COST LABOR TOTAL LABOR 40A2P Breakers 2 60.00 120.00 0.50 1.00 RAW TOTALS I 120.00 1.00 Regulated by the Texas Department of Licensing and Regulations P.O. Box 12157, Austin, TX, 78711 License: TECL #17495 1-800-803-9292, 512-463-6599 website: www.license.state.tx.us/complaints DATE: NAME: COMPANY: RE: August 6 2015 Kyle Little Chaney -Cox Construction Round Rock Sports Center Building B Finish Back Boxes for T5 Fixtures "BBW fixture option" CHANGE ORDER REQUEST MATERIAL (SEE ATTACHED) + SALES TAX (8.25%) MATERIAL TOTAL 0.75 INSTALLER HOURS AT 0.50 FOREMAN HOURS AT 0.00 FOREMAN OT HOURS AT 0.50 GENERAL SUPER/PM MISCELLANEOUS EXPENSES EQUIPMENT RENTAL PERMITS FREIGHT MISCELLANEOUS TOTAL *** ADDITIONAL TIME REQUEST *** CHANGE ORDER WILL ADD DAYS TO /HOUR CONSTRUCTION SCHEDULE. SHOULD CHANGE $36.00 ER WORK BE APPROVED WITH NO ADDITIONAL $18.00 ? GIVEN OVERTIME LABOR WILL ADD TO THE /HOUR [VGE ORDER PRICE AS FOLLOWS: $65.00 ALLER O.T. 0.75 X$24.00 X 1/2 = $9.00 -MAN O.T. 0.50 X$34.00 X 1/2 = $8.50 RTIME LABOR TOTAL $18.00 CHANGE ORDER # CCCOI-08 205.00 0.00 $205.00 $24.00 /HOUR $18.00 $36.00 /HOUR $18.00 $51.00 /HOUR $0.00 $65.00 /HOUR $32.50 SUBTOTAL LABOR $95.22 $68.50 LABOR BURDEN @ 39% $26.72 LABOR TOTAL $45.03 $95.22 TOTAL COLVIN ELECTRIC, INC. - 3901 KELLY LANE - PFLUGERVILLE, TEXAS 78660 Regulated by the Texas Department of Licensing and Regulations P.O. Box 12157, Austin, TX, 78711 License: TECL #17495 1-800-803-9292, 512-463-6599 • (512) 388-2271 website: www.license.state.tx.us/complaints $0.00 $0.00 0.00 $0.00 MATERIAL $205.00 MISCELLANEOUS $0.00 LABOR $95.22 SUBTOTAL $300.22 OVERHEAD & PROFIT (15 %) $45.03 TOTAL COLVIN ELECTRIC, INC. - 3901 KELLY LANE - PFLUGERVILLE, TEXAS 78660 Regulated by the Texas Department of Licensing and Regulations P.O. Box 12157, Austin, TX, 78711 License: TECL #17495 1-800-803-9292, 512-463-6599 • (512) 388-2271 website: www.license.state.tx.us/complaints CHANGE ORDER CCC01-08 Page 2 Back Boxes for T5 Fixtures "BBW fixture option" MATERIALS QUANTITY UNIT COST TOTAL COST LABOR TOTAL LABOR 40A2P Breakers 5 41.00 205.00 0.25 1.25 RAW TOTALS 1 205.00 1 1 1.25 Regulated by the Texas Department of Licensing and Regulations P.O. Box 12157, Austin, TX, 78711 License: TELL #17495 1-800-803-9292, 512-463-6599 website: www. lice nse.state.tx.us/complaints /( j�V?Hoard We A.c plbh. Texas BuyBoard # 476-15 RUBBER FLOORING SYSTEMS, INC. 375 Columbia Memorial Pkwy, Kemah, TX 77565-3187 Phone (281) 334-6800 Fax (281) 535-1959 Date: August 7, 2015 Project: I RRSC To: I Kyle Little Phone: 1512.632.36 67 Company: Chaney -Cox Email: kyle@chaneycox.com Quantity Units I Scope of Work Unit Price I Total Price* Ault Exercise Room 400D 1 EA Supply, deliver and install 490 SF of 10mm Mondo Sportflex M rolls in P31 grey with a 20mm Regupol underlayment- includes transitions $ 17,685.00 $ 17,685.00 Tax: $ Bio gv Total: $ Contractor: RFS, Inc. Signature of Acceptance: Estimating: Jordan Gunnells Jordan@teamrfs.com Office: 281-334-6800 Sales: Kirk Sandifer ..-Kirk@teamrfs.com Date: ,Cell: 512-626-0582 Exclusions: Moisture remediation. Prep and leveling or smoothing of substrate. Protection of work after installation. Price is subject to change should there be prevailing wage or union wage requirements 1101b bag per 1,000 SF of Ardex Feather Finish included for minor prep. City of Round Rock J y ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Chaney Cox Construction, Inc. for the Round Rock Sports Center Building "B" Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 9/4/2015 Dept Director: Chad McDowell, General Services Director Cost: Indexes: Attachments: Change Order No. 1, LAF Department: General Services Department Text of Legislative File CM -2015-883 Consider executing Quantity Adjustment/Change Order No. 1 with Chaney Cox Construction, Inc. for the Round Rock Sports Center Building "B" Project. With the approval of this change order it will facilitate the construction of Building B at the Sports Center. Staff Recommends Approval Cost: $21,100.00 City of Round Rock Page 1 Printed on 91312015