Loading...
CM-2015-901 - 9/18/20151 STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: WAELTZ & PRETE, INC. ("Engineer") ADDRESS: 3000 Joe DiManio Boulevard #72, Round Rock, TX 78665 PROJECT: Brushy Creek Trail — Veterans Park to AW Grimes Boulevard This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Waeltz & Prete, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract', on the 25 day of November, 2014 for the Brushy Creek Trail — Veterans Park to AW Grimes Boulevard Project in the amount of $181,461.39; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $8,500.00 to a total of $189,961.39; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Article 1, City Services and Exhibit A, City Services shall be amended as set forth in the attached Addendum To Exhibit A. II. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $8,500.00 the lump sum amount payable under the Contract for a total of $189,961.39, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract 0199.1461; 00341177 Cm- ZoI Ssia 1 Rev. 12/01/08 84275 WAELTZ &PR�IETE, INC. (j/1��) By: / e,,Lm;J A. 1 Qt z 02 Saof rg' Date CITY PF ROUND ROCK APPRVED AS TO RM: By Man McGraw;�Iaypr u� Steph L. Sheets, City Attorney Date "J J Supplemental Contract Rev. 12/01/08 0199.1461;00341177 84275 ADDENDUM TO EXHIBIT A City Services The City of Round Rock will provide necessary support services and furnish the Engineer the following item/information: 1. Any pertinent existing baseline information relating to the assigned tasks. 2. Clear direction regarding staff decisions related to scope changes ADDENDUM TO EXHIBIT B Engineering Services The project consists of the preparation of design documents for the requested additional scope. The Engineer shall provide the following engineering services: Environmental Scope (Sub consultant — Horizon Environmental Services, Inc.): 1. Develop a detailed map of site 41WM1304, focusing specifically on mapping the locations of looter pits on the site, measuring their dimensions, and using this information to calculate the volume of archeological deposits that have been damaged or destroyed by looting on the site to date. Horizon's mapping crew will traverse the site in closely spaced, parallel, linear, transects spaced approximately 10 meters apart, temporarily flag the locations of looter pits, and determine the locations of looter pits using a global positioning system (GPS) device with sub -meter or sub -foot accuracy. Horizon will measure the dimensions (length, width, and depth) of looter pits and calculate the volume of displaced archeological deposits. All temporary flagging will be removed from the site after GPS locations of the marked looter pits are determined. 2. Develop a global information system (GIS) data layer and map showing the site boundaries, pertinent landscape features, and looter pits. 3. Revise the draft report for the cultural resources survey for the segment of the Brushy Creek Regional Trail Gap hike -and -bike trail during which site 41 WM1304 was discovered with the revised site map, a discussion of the methods and results of the supplemental site mapping activities, and a table summarizing the size of looter pits and volume of excavated sediments recorded during the mapping project. 4. Provide the City of Round Rock with a copy of the 41WMI304 GIS shape files to be used as a baseline for the City's and THC's ongoing preservation efforts on the site. 5. Assist the City of Round Rock with completing an SAL nomination form for site 41 WM 1304. This proposal does not include provisions for placing a public notice of the SAL nomination in a newspaper of general circulation, as described under Rule 26.8 of the Rules of Practice and Procedure for the Antiquities Code of Texas, or for attending any public hearings. ADDENDUM TO EXHIBIT C Work Schedule The project will be completed within 37 calendar days of the Notice To Proceed. ADDENDUM TO EXHIBIT D Fee Schedule Sub Consultant Fees: D.12 — Horizon Environmental Services, Inc. (Environmental) - Supp# 1 $8,500.00 TOTAL FEE FOR BASIC SERVICES $89500.00 City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 1 with Waeltz & Prete, Inc. for the Brushy Creek Trail - Veterans to AW Grimes Boulevard Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 9/18/2015 Dept Director: Rick Atkins, Director Cost: Indexes: Attachments: LAF - SC#1 w- Waeltz Prete - Brushy Creek Trail - Veterans Park to AW Grimes Blvd (00341242xA08F8).pdf, SC#1 w-Waeltz Prete for Brushy Creek Trl - Veterans Parks to AW Grimes Blvd (00341177xA08F8).pdf Department: Parks and Recreation Department Text of Legislative File CM -2015-901 Consider executing Supplemental Contract No. 1 with Waeltz & Prete, Inc. for the Brushy Creek Trail - Veterans to AW Grimes Boulevard Project. This Contract for Additional Engineering Services is for cultural and environmental services related to the Brushy Creek Trail - Veterans to AW Grimes Blvd Project. In addition to the original scope of the project, the consultant shall provide a detailed map of the locations, depth, and volume of the looter pits located along the trail and within archaeological site 41WM1304. This map and subsequent report is a requirement by the Texas Historical Commission before they will allow construction activities to take place on the project. The Brushy Creek Trail - Veterans to AW Grimes Blvd project limits are from the Georgetown Street bridge to the pedestrian underpass at AW Grimes Blvd. Staff believes the proposed fee is in-line with the project total and scope of services from the consultant. This project is in line with numerous objectives within Strategic Plan Goals 1 -High Value Services, Goal 4 -Sports Capital for Tourism and Residents and Goal 5- Authentic Downtown. Department official recommends approval of this item. City of Round Rock Page 1 Printed on 911812015