R-2015-2850 - 9/24/2015 RESOLUTION NO. R-2015-2850
WHEREAS, the City of Round Rock has duly advertised for bids for the FM 3406/Sports
Center Wastewater Improvements Project; and
WHEREAS, Patin Construction has submitted the lowest responsible bid; and
WHEREAS, the City Council wishes to accept the bid of Patin Construction,Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on behalf of the City a contract
with Patin Construction for the FM 3406/Sports Center Wastewater Improvements Project.
The City Council hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting was
open to the public as required by law at all times during which this Resolution and the subject matter
hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 24th day of September, 2015.
ALAN MCGRAW, Mayor
City of Round Rock, Texas
ATTEST:
StWvA,,,. �
SARA L. WHITE, City Clerk
0112.1504;00342442
FM 3406/SPORTS CENTER WASTEWATER IMPROVEMENTS
BID TABULATION-ALL BIDS
9/2/15
Patin Construction AgH2O Holdings Aaron Concrete
Bid Item Bid Item Description Quantity Unit Unit Price Total Amount Unit Price ITotal Amount Unit Price Total Amount
Mobilization,complete in place,not to exceed 5%of
1 base bid(per LS),complete in place 1 LS $ 9,500.00 $ 9,500.00 $ 10,594.00 $ 10,594.00 $ 10,000.00 $ 10,000.00
Install new 18"PVC SDR 26 wastewater line,all
depths,at FM 3406,with 6"controlled low strength
material(CLSM)encasement,including excavation and
2 backfill,complete in place 341 LF $ 130.00 $ 44,330.00 $ 131.00 $ 44,671.00 $ 195.00 $ 66,495.00
Install 8"PVC SDR 26 wastewater line,all depths,at
Sports Center,including excavation and backfill,
3 complete in place 984 LF $ 100.00 $ 98,400.00 $ 81.00 $ 79,704.00 $ 81.00 $ 79,704.00
4 By-pass pumping for FM 3406 line,complete in place 1 LS $ 5,000.00 $ 5,000.00 $ 5,499.00 $ 5,499.00 $ 14,000.00 $ 14,000.00
48"Watertight Wastewater Manhole with watertight
ring and cover,including excavation and backfill,
5 complete in place 2 EA $ 4,500.00 $ 9,000.00 $ 4,800.00 $ 9,600.00 $ 3,000.00 $ 6,000.00
6" PVC SDR 26 Wastewater Service-Single Long
(Sheet 4,Sta.9+00),including cleanout,excavation&
6 backfill,complete in place 1 EA $ 2,500.00 $ 2,500.00 $ 3,000.00 $ 3,000.00 $ 2,000.00 $ 2,000.00
7 Curb Repair,complete in place 24 LF $ 50.00 $ 1,200.00 $ 5.00 $ 600.00 $ 100.00 $ 2,400.00
Hot Mix Asphaltic Concrete Trench Repair,per detail,
8 complete in place 250 LF $ 30.00 $ 7,500.00 $ 37.00 $ 9,250.00 $ 70.00 $ 17,500.00
9 Fiber Logs,complete in place 975 LF $ 6.00 $ 5,850.00 $ 18.00 $ 17,550.00 $ 10.00 $ 9,750.00
10 Tree Protection,complete in place 107 LF $ 4.00 $ 428.00 $ 15.00 $ 1,605.00 $ 3.00 $ 321.00
11 Storm Inlet Sediment Trap,complete in place 3 EA $ 300.00 $ 900.00 $ 350.00 $ 1,050.00 $ 100.00 $ 300.00
12 Revegetation,complete in place 3974 SY $ 1.00 $ 3,974.00 $ 6.00 $ 23,844.00 $ 1.00 $ 3,974.00
13 Manhole Coating,complete in place 17 VF $ 100.00 $ 1,700.00 $ 330.00 $ 5,610.00 $ 130.00 $ 2,210.00
14 Trench Safety,complete in place 1 LS $ 2,500.00 $ 2,500.00 $ 1,200.00 $ 1,200.00 $ 10,000.00 $ 10,000.00
Total Base Bid $ 192,782.00 $ 213,777.00 $ 224,654.00
Materials $ 42,850.00 $ 85,511.00 $ 40,000.00
Other Charges $ 149,932.00 $ 128,266.00 $ 184,654.00
$ 192,782.00 $ 213,777.00 $ 224,654.00
FM 3406/SPORTS CENTER WASTEWATER IMPROVEMENTS
BID TABULATION-ALL BIDS
9/2/15
TTG Utilities Facilities Rehab DeNucci Constructors
Bid Item Bid Item Description Quantity Unit Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount
Mobilization,complete in place,not to exceed 5%of
1 base bid(per LS),complete in place 1 LS $ 14,325.00 $ 14,325.00 $ 15,000.00 $ 15,000.00 $ 8,000.00 $ 8,000.00
Install new 18" PVC SDR 26 wastewater line,all
depths,at FM 3406,with 6"controlled low strength
material(CLSM)encasement,including excavation and
2 backfill,complete in place 341 LF $ 220.00 $ 75,020.00 $ 185.00 $ 63,085.00 $ 125.00 $ 42,625.00
Install 8"PVC SDR 26 wastewater line,all depths,at
Sports Center,including excavation and backfill,
3 Icomplete in place 984 LF $ 135.00 $ 132,840.00 $ 96.00 $ 94,464.00 $ 46.00 $ 45,264.00
4 By-pass pumping for FM 3406 line,complete in place 1 LS $ 9,250.00 $ 9,250.00 $ 5,000.00 $ 5,000.00 $ 58,000.00 $ 58,000.00
48"Watertight Wastewater Manhole with watertight
ring and cover,including excavation and backfill,
5 complete in place 2 EA $ 7,000.00 $ 14,000.00 $ 5,500.00 $ 11,000.00 $ 5,200.00 $ 10,400.00
6"PVC SDR 26 Wastewater Service-Single Long
(Sheet 4,Sta.9+00),including cleanout,excavation&
6 backfill,complete in place 1 EA $ 3,200.00 $ 3,200.00 $ 2,500.00 $ 2,500.00 $ 2,600.00 $ 2,600.00
7 ICurb Repair,complete in place 24 LF $ 70.00 $ 1,680.00 $ 50.00 $ 1,200.00 $ 30.00 $ 720.00
Hot Mix Asphaltic Concrete Trench Repair,per detail,
8 complete in place 250 LF $ 20.00 $ 5,000.00 $ 40.00 $ 10,000.00 $ 68.00 $ 17,000.00
9 Fiber Logs,complete in place 975 LF $ 7.00 $ 6,825.00 $ 10.00 $ 9,750.00 $ 7.6.00 $ 15,600.00
10 Tree Protection,complete in place 107 LF $ 28.00 $ 2,996.00 $ 10.00 $ 1,070.00 $ 6.00 $ 642.00
11 Storm Inlet Sediment Trap,complete in place 3 EA $ 600.00 $ 1,800.00 $ 200.00 $ 600.00 $ 95.00 $ 285.00
12 Revegetation,complete in place 3974 SY $ 2.50 $ 9,935.00 $ 5.00 $ 19,870.00 $ 0.65 $ 2,583.10
13 Manhole Coating,complete in place 17 VF $ 240.00 $ 4,080.00 $ 200.00 $ 3,400.00 $ 135.00 $ 2,295.00
14 Trench Safety,complete in place 1 LS $ 10,750.00 $ 10,750.00 $ 1,000.00 $ 1,000.00 $ 1,800.00 $ 1,800.00
Total Base Bid $ 291,701.00 $ 237,939.00 $ 207,814.10
Materials $ 64,183.00 $ 137,939.00 $ 78,000.00
Other Charges $ 227,518.00 $ 100,000.00 $ 129,814.00
$ 291,701.00 $ 237,939.00 $ 207,814.00
FM 3406/SPORTS CENTER WASTEWATER IMPROVEMENTS
BID TABULATION-ALL BIDS
9/2/15
JKB Construction Company Prota Construction Chasco Constructors
Bid Item Bid Item Description Quantity Unit Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount
Mobilization,complete in place,not to exceed 5%of
1 base bid(per LS),complete in place 1 LS $ 11,400.00 $ 11,400.00 $ 8,800.00 $ 8,800.00 $ 12,500.00 $ 12,500.00
Install new 18"PVC SDR 26 wastewater line,all
depths,at FM 3406,with 6"controlled low strength
material(CLSM)encasement,including excavation and
2 backfill,complete in place 341 LF $ 150.00 $ 51,150.00 $ 1,10.00 $ 37,510.00 $ 211.00 $ 71,951.00
Install 8"PVC SDR 26 wastewater line,all depths,at
Sports Center,including excavation and backfill,
3 complete in place 984 LF $ 120.00 $ 118,080.00 $ 78.00 $ 76,752.00 $ 119.00 $ 117,096.00
4 By-pass pumping for FM 3406 line,complete in place 1 LS $ 12,000.00 $ 12,000.00 $ 38,000.00 $ 38,000.00 $ 10,500.00 $ 10,500.00
48"Watertight Wastewater Manhole with watertight
ring and cover,including excavation and backfill,
5 complete in place 2 EA $ 5,500.00 $ 11,000.00 $ 7,500.00 $ 15,000.00 $ 4,500.00 $ 9,000.00
6"PVC SDR 26 Wastewater Service-Single Long
(Sheet 4,Sta.9+00),including cleanout,excavation&
6 backfill,complete in place 1 EA $ 2,100.00 $ 2,100.00 $ 3,300.00 $ 3,300.00 $ 5,300.00 $ 5,300.00
7 Curb Repair,complete in place 24 LF $ 1.00.00 $ 2,400.00 $ 2.60.00 $ 6,240.00 $ 70.00 $ 1,680.00
Hot Mix Asphaltic Concrete Trench Repair,per detail,
8 complete in place 250 LF 5 75.00 $ 18,750.00 $ 50.00 $ 12,500.00 $ 23.00 $ 5,750.00
9 Fiber Logs,complete in place 975 LF $ 4.45 $ 4,338.75 $ 5.00 $ 4,875.00 $ 5.00 $ 4,875.00
10 Tree Protection,complete in place 107 LF $ 3.00 $ 321.00 $ 4.00 $ 428.00 $ 8.00 $ 856.00
11 Storm Inlet Sediment Trap,complete in place 3 EA $ 75.00 $ 225.00 $ 80.00 $ 240.00 $ 100.00 $ 300.00
12 Revegetation,complete in place 3974 SY $ 1.00 $ 3,974.00 $ 1.00 $ 3,974.00 $ 3.00 $ 11,922.00
13 Manhole Coating,complete in place 17 VF $ 120.00 $ 2,040.00 $ 400.00 $ 6,800.00 $ 150.00 $ 2,550.00
14 Trench Safety,complete in place 1 LS $ 1,325.00 $ 1,325.00 $ 6,000.00 $ 6,000.00 $ 3,300.00 $ 3,300.00
Total Base Bid $ 239,103.75 $ 220,419.00 $ 257,580.00
Materials $ 84,056.40 $ 101,032.84 $ 105,000.00
Other Charges $ 155,047.35 $ 119,386.16 $ 152,580.00
$ 239,103.75 $ 220,419.00 $ 257,580.00
FM 3406/SPORTS CENTER WASTEWATER IMPROVEMENTS
BID TABULATION-ALL BIDS
9/2/15
Central Road and Utility Whitestone Civil Construction Smith Contracting
Bid Item Bid Item Description Quantity Unit Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount
Mobilization,complete in place,not to exceed 5%of
1 base bid(per LS),complete in place 1 LS $ 10,701.80 $ 10,701.80 $ 12,500.00 $ 12,500.00 $ 12,000.00 $ 12,000.00
Install new 18"PVC SDR 26 wastewater line,all
depths,at FM 3406,with 6"controlled low strength
material(CLSM)encasement,including excavation and
2 backfill,complete in place 341 LF $ 120.60 $ 41,124.60 $ 22.5.00 $ 76,725.00 $ 210.00 $ 71,610.00
Install 8"PVC SDR 26 wastewater line,all depths,at
Sports Center,including excavation and backfill,
3 complete in place 984 LF $ 124.10 $ 122,114.40 $ 122.00 $ 120,048.00 $ 76.00 $ 74,784.00
4 By-pass pumping for FM 3406 line,complete in place 1 LS $ 7,134.50 $ 7,134.50 S 15,000.00 $ 15,000.00 $ 45,100.00 S 45,100.00
48"Watertight Wastewater Manhole with watertight
ring and cover,including excavation and backfill,
5 Icomplete in place 2 EA $ 6,047.10 $ 12,094.20 $ 7,800.00 $ 15,600.00 $ 5,500.00 $ 11,000.00
6"PVC SDR 26 Wastewater Service-Single Long
(Sheet 4,Sta.9+00),including cleanout,excavation&
6 backfill,complete in place 1 EA $ 2,699.60 $ 2,699.60 $ 3,800.00 $ 3,800.00 $ 1,300.00 $ 1,300.00
7 Curb Repair,complete in place 24 LF $ 71.40 $ 1,713.60 $ 75.00 $ 600.00 $ 24.00 $ 576.00
Hot Mix Asphaltic Concrete Trench Repair,per detail,
8 complete in place 250 LF $ 71.40 $ 17,850.00 $ 75.00 $ 18,750.00 $ 100.00 $ 25,000.00
9 Fiber Logs,complete in place 975 LF $ 7.10 $ 6,922.50 $ 6.00 $ 5,850.00 $ 5.00 $ 4,875.00
10 Tree Protection,complete in place 107 LF $ 5.70 $ 609.90 $ 4.00 $ 428.00 $ 27.00 $ 2,889.00
11 Storm Inlet Sediment Trap,complete in place 3 EA $ 399.50 $ 1,198.50 $ 400.00 $ 1,200.00 $ 90.00 $ 270.00
12 Revegetation,complete in place 3974 SY $ 2.90 $ 11,524.60 $ 2.00 $ 7,948.00 $ 1.60 $ 6,358.40
13 Manhole Coating,complete in place 17 VF $ 214.00 $ 3,638.00 $ 200.00 $ 3,400.00 $ 120.00 $ 2,040.00
14 Trench Safety,complete in place 1 LS $ 2,100.00 $ 2,100.00 $ 2,500.00 $ 2,500.001$ 2,800.00 $ 2,800.00
Total Base Bid $ 241,426.20 $ 284,349.00 $ 260,602.40
Materials $ 144,855.72 $ 34,796.00 $ 156,361.44
Other Charges $ 96,570.48 $ 249,553.00 $ 104,240.96
$ 241,426.20 $ 284,349.00 $ 260,602.40
Binkley
Barfield
consulting engineers
August 28, 2015
Mr. Jeff Bell
Sr. Project Manager
City of Round Rock
2008 Enterprise Dr.
Round Rock, Texas 78664
RE: Recommendation for Contracting Services:
FM 3406/Sports Center Wastewater Improvements
Round Rock, Texas
Dear Mr. Bell:
Upon checking of references and receiving positive feedback, we would recommend the selection of
the low bidder, Patin Construction- Taylor, Texas.
If you have any questions,please contact me at(512) 292-0006, or rg@binkleybarfi.eld.coin.
Sincerely,
BINKLEY & BARFIELD, INC.
Consulting Engineers
Rey Gonzalez, P.E.
Project Manager
Binkley&Barfield,Inc.I Registration No. F-257 • 1611 Chisholm Trail Road,Suite 250-Round Rock,Texas 78681 •Tel:512.292.00061 Fax:512.292.00151 www.BinkleyBarfield.00m
N
` 0' 25' 50' 100'
/ SCALE IN FEET '
1 I
LEGEND
20' EXISTING PUE�/ / ® RIGHT-OF-WAY (ROW) ACQUISITION
/
PUBLIC UTILITY EASEMENT
ACQUISITION
/ / / ------- —
EXISTING ROW
PROPOSED ROW
1 1
—————• EXISTING PUBLIC UTILITY EASEMENT i
-----• PROPOSED PUBLIC UTILITY EASEMENT
15' PROPOSED WATER ! // EXISTING PROPERTY LINES
LINE EaSEMENT / / D E O ,
PROPQ$EC TOMPERARY
PROPOSED WATER/ CONSTRU TI N ASEMENT
®10'�EXISTING PUE 11LINE EASEMENT,/-
r r r O
�= r
e
W W
na O
UNIVERSITY BLVD
H m APPROX. 22' in iv H
_- APPROX. 3'
_____ — — ——— _ _EX_IS_TINGC_ROW
_U r DEL SIGN—
• r 10' E% STING PUE _ PROPOSED ROW E i
20' PROPOSED TEgCE
CONSTRUC TI ONOEASEMENTMP. J I 1 1 1
AREA 0.0335 AC (1,460 SO FT) 1 t I
I 1 t m
uu 'LH
SIGN 1 1 F N
LOT 3 I i Wj
BLOCK A 1 t
WCrown Investments, LLC
DEL TACO t ''
/ t► r
17 1 11
It
f f f ( KENNEDY
f
J '- CONSULTING I!
f f f TOPE REGISTRATION NO. F-926
I
f CITY OF ROUND ROCK
15' EXISTING PUE J Hninna 221 E. MAIN ST
f / .....,:. ROUND ROCK, TX 78664
/ J f
FROM UNIVERSITY OAKS BLVD TO SUNRISE RD
ROW STRIP MAP
i i f
n�15' EXISTING PUE DEL TACO
PRI L I P ,P R,2,
SCALE
•IDD'
PROJECT W.
SUBJECT TO REVISION KCI STATE RDADWAY
NOTE: THIS PRELIMINARY ROW STRIP MAP TEXAS UNIV ISI
IS NOT TO BE USED FOR ROW KCI camT 'ATT
RECORDATION PURPOSES KCI WILLIAMSON ROUND ROCK