Loading...
CM-2015-928 - 10/16/2015Page I of 3 Contract Quantity Adjustment/Change Order xouxo xou�urws rev, as/u Department: Project Intersection Geometric Imp. For Round Rock Ave./Mayfield Name: — Ranch/Forest Ridge Blvd. City Project ID Number justification Electrical Work for the Round Rock Ave. and Overrun of Driveway JUMMAKY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Rice Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Date: 10/7/15 Change Order/Quantity Adjustment No. i Amount % Chanoe Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: 0 Company Contrador. 12 Signature Printed Name, Title, Company Date City Project D- on Cc%__ 'Q 11 r-� I t t _ I Mayor/City a arm 0.00 $8,877.50 0.07 $8,877.50 0.07 $131,15650 $16,112.60 Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: 0 Company Contrador. 12 Signature Printed Name, Title, Company Date City Project D- on Cc%__ 'Q 11 r-� I t t _ I Mayor/City a arm Page, 2 of 3 �uNo�IX' Contract Quantity Adjustment/Change Order rev, ayes Project Name: Intersection Geometric Imp. For Round Rock Ave./Mayfield Ranch/Forest Ridge Blvd. Quan. Adj./Change Order No.: Chanoe Order Data Item # Item Description Unit Qty, Unit Price Amount Contract Time Adjustment Da s REMOVE & INSTALL SIGN EA 1.00 ;13,047.50 $3,047.50 REMOVE & INSTALL PARKING LOT LIGHTS EA 1 $5,830.00 $5,830.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: � 7 - $8877.50 m fii 0 0 OT'S£Z L :S1V101 00'D$ 00.0$ 00.0$ 00.0$ DDro$ 0871$- 09.0$ (00'£) 1l (obZ) NNW NOd d3Nd NnS Atld 9002 8790 09.0$ O£'O$ 007 =n I G,ZI) NNW WA d3Nd NnS AVd 1900Z OL90 OZ'ZT$- OZ'0$ (00'19) dl G,8) NNW 2104 d3Nd NnS AWEOOZ BL90 00'95$ OI'0$ (00.095) dl (,b) NNW NOd d3Nd NnS AVd TOOZ 8790 00'b8S$- 00'b$ (00.9bT) dl 5) SNNW V NNW AVd 1X3 WIl3 TOOZ L190 0000''05$- 00'OT$ (00-S) V3 O-1 Al NNNW AVd 113N ZTOZ Z190 0£$ 00'0£$ 00.1 V3 (MOM) N31V3S 1N3W9AVd 6TZZ 9990 00'ZT$- 00'b$ (00"E) =n .bz 213IV3S 1N3W3AVd 961Z 9990 00"b$ 00'3 OOZ =n oZT N31VAS JN3W3AVd £61Z 9990 OS'0£$- ' OS'0$ (00'19) 1l „8 N3lV3S. N3W9AVd 16IZ 9990 O'ZTT$- OZ'0$ (00'095) =n „b 2131V3S- N3W9AVd 69TZ 9990 00.095$- 00"T$ (00'095) dl (lIW 060)(OlS)(..b)(A)I Al NNW AVd 133N OTTZ 9990 00'TZ$ 00.7$ (00'E) dl (lIW LbOZ 9990 060)(O1SX&z)(M)I Al NNW Atld ld3N OoT$ 00'Z$ 00'Z 3l (11W TbOZ 9990 060)((lS)(.ZI)(M)I Al NNW AW -H98 OO'bbZ$- 00'b$ (00'19) dl (11W SEE 9990 06O)((nS)(„8)(M)I Al NNW Atld ld3N 007006$- 00 -SL$ (OOZY) AS NVI03W ONOO ZOOZ 9ESO 00'096'9$ 00.08$ 00'78 AS (ONOO) SAVM3AIN0 OTOZ OESO 00'OLb'T$ 00'5£$ 007b 31 I (II All N3 um v am ON00 b007 6250 00'Oo7'I$ 00'OLT$ 00'OT 35 I (b S30)(III ID)(H:) 3dld ON 990Z 69b0 00'OS£$- 00'S3 (00'61) OW F 9NIN3I.VM 3AUV1399A TOOZ 99TO -:.. auaw}sn[py .IunowV d u aouvn 'A721 ;!u n uo3 du�sa0 wa ll # walT pig aw!l }Pej;uo:) e{eU;udivasntpV Ajpuen0 T :-ON aapJ0 a6uey0/•[pV -uenb -PAIR 96pw Isajoy/yaueN pla0AeW/•any �aoN punON icy dwj oplawoag uOIIOaSJalul :aweN Palo d Sim Im, sr,u aapa0 a6uey0/4uaw;snlpy AI!Iuenb;Oea.7uo0 -- £Io £ osRd City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 1 with Aaron Concrete Contractors, LP for the intersection Geometric Improvements for Round Rock Ave at North Lake Creek Dr and Mayfield Ranch at RM 1431 and Forest Ridge Blvd at Indigo Trl Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 10/16/2015 Dept Director: Gary D. Hudder Cost: Indexes: Attachments: Change Order #1.pdf Department: Transportation Department Text of Legislative File CM -2015-928 Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 1 with Aaron Concrete Contractors, LP for the intersection Geometric Improvements for Round Rock Ave at North Lake Creek Dr and Mayfield Ranch at RM 1431 and Forest Ridge Blvd at Indigo Trl Project. In 2014, the City of Round Rock entered into a contract with Aaron Concrete Contractors, L.P. for various intersection improvements at three different locations. Included in that contract was the construction of a new driveway at Lake Creek and RM 620 to align the driveway with the existing side street and activate the signal to provide for a safer intersection for the RRHS pedestrians and the traveling public. The lengthy delay for this protion of the construction was a result of the strip center ownership changing hands and an issue locating the new owners, who are out of country. In order to complete the driveway and open it for traffic an illuminated sign and two existing flood lights that had to be relocated. This change order/quantity adjustment is for that work and adjustments to contract quantities which include overruns on concrete for driveway repairs, arch drainage pipe, and under- runs on pavement markings. The amount for the change order is $8,877.50 and the quantity adjustment amount is $7,235.10 for a total of $16,112.60. This will close out and complete the contract. City of Round Rock Page 1 Printed on 10/15/2015