Loading...
CM-2015-665 - 1/23/2015City of Round Rock �"S°RO°` Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 3 with Layne Heavy Civil, Inc. for the Treated Water Transmission Line - Segment 3 Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 1/23/2015 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $34,884.86 Indexes: Self -Financed Water Construction Attachments: QA-CO#3_Layne_TreatedWLSeg3_CM1.23.15 Department: Utilities and Environmental Services Text of Legislative File CM -2015-666 The Treated Water Transmission Line - Segment 3 is the final segment required to deliver BCRUA treated water to the City's transmission system from Lake Travis. Segment 3 consists of approximately 12,000 linear feet of 48 -inch waterline. The horizontal alignment of Segment 3 generally follows the future extension of New Hope Drive easterly from Ronald Reagan Blvd. to C.R. 175 north of RM 1431. The waterline will conned to the east end of Treated Waterline - Segment 2C at Ronald Reagan Blvd. and terminate at an existing 48 -inch stub -out at the northwest corner of the RM 1431 and C.R. 175 intersection and will be constructed within a City of Round Rock Waterline Easement. Additional quantities to bid items that were requested by City staff total $10,278.80. Change Order items needed for connections to existing piping on both ends due to unforeseen issues, along with the cost of going back to the originally designed PLC (Programmable Logic Center) equipment total $24,606.06. These additions increase the contract amount by $34,884.86. In June of 2014, Quantity Adjustment/Change Order No. 1 in the amount of $12,487.39 was executed, which modified the original contract total from $5,725,720.25 to $5,738,207.64. In August of 2014, Quantity Adjustment/Change Order No. 2 in the amount of $45,719.49 was executed, which increased the contract total to $5,783,927.13. Please execute Quantity Adjustment/Change Order No. 3 in the amount of $34,884.86, which brings the new contract total to $5,818,811.99. CHyafftu deck P.,1 PH .laWO1S Mende Item Summary Continued (CMd014555) Staff recommends approval. CHyarRetmd Reck Pepe 2 Ponied an fALS015 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCILICITY MANAGER ACTION Required for Srl6mission of ALL City Council and City Manager Items Deparenent Name: uNilea& Environmental Senates Project Name: waited W&*r Lammimlcn Lina - Seummla Project MgnResource: Jeff Ball ConlnctorlVeneor. Lama Heavy Civil, Ina Council Action: ORDINANCE RESOLUTION QCity Manager Approval CMA Wording Aonsitler executing Ouantlly AdjustmentlChange Order No. 3 Yvan Layne Heavy Civil, Inc. for the Treated Water Transmission Line— Segment 3 Project. O:\WdoxtSCClnts10199114051MISC100327430.XLS Updated 6/3/08 Contract Quantity Adjustment/Change Order Pmlect Name: Treated Water Transmission Main No. 3 Contracmr: Layne Heavy Civil, Inc. Engineer: lambs Engineering Group, Inc. Page I of I Date: 12/3/2014 Change Order/Quantity Adjustment No. 3 justification See the following enclosed documents: (1) CPR #6 with cost Information from Layne Heavy Civil (dated 11-17-14), (2) lambs remmmendation letter, dated 11-19-14, (3) Request for Change Order No. 011 from Layne Heavy Civil (dated 11-18-14), (4) Request for Change Order No. 012 from Layne Heavy Civil (dated 11-18-14). i V17MMR1 Original Correct Rice: Previous Quantity Adjusirnent(s): This Quantity Adjustment: TOGI Quanmy Adjustment(s): Total Contact Price wdh Quantity Adjustment(s): Prevlaus Change Order(s) This Change Order: Total Change Ordl To Date: Odgnal COnaaQ Pnra Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Pro, W this Change Order: Contrad Time with All Approved Change Orders: Amount %Chan e $5,725,720.25 $28,301.89 $10,278.80 $38,580.69 $5,764,300.94 0 $29,904.99 0.52% $24,606.06 0.43% $54511.05 0.95% $5,818,811.99 342 calendar days (Final) 377 calendar days (Final) 447 calendar days (Final) . orwyo r.c., rmlecc ongmeer Wepared WPYAlambs Engineering Group, Inc. 11--4-- (Q— Contractor 3 ted jam,Tibe and Company page A/. siNSu� Approval: /_ x' - /-/-(Z `f City of Round signature PnMed Name, Title and Company Date to Rock \ Y/ ._ r, Name, Tide I.1, 3 C M-ac)6— !0105 Page 1 of 1 Contract Quantity Adjustment/Change Order Project Name: Treated Water Transmission Main Segment 3 (TM -3) Quan. Adj./Change Order No.: 3 Quantity Adiuetmant nota Bid Item # Item DescriptionAdjustment Unit Qty. Unit Price Am Contract Time Da T Permanent Fence Replacement (5 -strand barbed wire), per field directive from 3.13 CORR inspection Department LF 192.8 $8.50 $1,638.00 0 4" Concrete Rip Rap, per field directive 3.24 from CORR Inspection Department SY 320 $27.00 $8,640.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.ao o.00 $0.00 $0.00 $0.00 $0.00 $0.00 i TOTALS: 10 278.80 0 Page 2 of 7 Contract Quantity Adjustment/Change Order Project Name: Treated Water Transmission Main Segment 3 (1hi-3) Quan. Adj./Change Order No.: 3 Chance Order Daft Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 1 Void a previous change in PLC hardware and furnish / install the originally specified Allen Bradley equipment. LS 1 $6,157.27 $6,157.27 70 2 Additional labor, equipment and materials costs required to make connection to existing City of Round Rode pipe at Sta. 129+50. LS 1 $14,709.29 $14,709.29 0 3 Additional labor, equipment am Materials costs required to make connection to existing BCRUA pipe. LS 1 $3,739.50 $3,739.50 0 $0.00 0.00 0.00 $0.00 $0.00 Ut$$, 0.00 O 0 a.oo ;o.00 CHANGE PROPOSAL REQUEST #6 JACOBS November 17, 2014 John Peterson Layne Heavy Civil, Inc. 300 E. Broad Street Fairbum, GA 30213 Re: City of Round Rock, Texas Treated Water Transmission Line — Segment 3 Change Proposal Request #6 Dear Mr. Peterson: 2705 Rea Cave R . SuM 300 Austin, Tem 76746 U S A. 1.512.314.3iM Fax 1.512 314.3135 Please provide a cost proposal to void Change Proposal Request #4 (copy enclosed). The originally specified Allen Bradley equipment shall be famished and installed, instead of the Moditen equipment that was included in Change Proposal Request #4. If the proposal is accepted, a change order will be prepared for the work. If you have any questions or need additional information at this time, please do not hesitate to contact me at 512-314-3162. Sincerely, JACOBS ENGINEERING GROUP. INC. Glenn A. B Senior Project Engineer XC: Jeff Bell, City of Round Rock w/enclosures KtW1XKa10Psonsw¢ioecbon6o P1aPos11 rcguaw4CPR A CPR%kan r111714.tluc Jambs Engmaanng Gmue Inc JACOBS 2705 S. Gv. Rom. sun. 300 Austin, Taaas 787" US A 1512.3113100 Fm 1 512.314.3135 June 9, 2014 John Peterson Layne Heavy Civil, Inc. 300 E Broad Street Fairburn, GA 30213 Re: City of Round RmI4 Texas Tsenled WaterTmosmission Line— Segment 3 Change Proposal Request a4 Dear Mr. Peterson: Please provide a cost proposal to revise the specified Allen Bradley products to products described in the following Modicon Product Data Sheets (cupics unclosed): Descrintian Mattson Product Data Slu eL PLC BMXPM2020H Power Supply BMXCPS3020H Discreet Input Module BMXDD11607.H Discrete Output Module BMXDRAI605H Analog Input Module BMXAMIIJBIBH Analog Output Module BMXAM00410H Backplane BMXXBP060DH Memory Card BMXRMS008MPF Programming Software UNYSPUSFUCD80 If the proposal is accepted, a change order will be proposed for the work If you have any questions or meed additional information at this time, phrase do not bmitas: to contact me at 512-314-3182. Sincerely, JACOBS ENGINEERING GROUP, INC. Glenn A. BridgegP.E. Scnior Project Engineer XC: Jeff Bell and Brandon Pritchett, City of Round Rock Andy Hedrick Layne Heavy Civil, Ire. wr cnclosurs K'� W1XK81Wkaatweuwclangc laan9nl m,mis 1CPR ",CPR N kner 050914Aoe Jacobs Enpirreedag Group 1r , COST INFORMATION FROM LAYNE HEAVY CIVIL IN RESPONSE TO CHANGE PROPOSAL REQUEST #6 Round Rock Water Transmission Seament XTM3 Request for Change Order Number 006 Date 11/17/2014 Request for Change By: Layne Heavy Civil 1775 E. 69th Ave Denver, Colorado 80229 Reason for Change and Description Provide cost proposal to revise the specified Medicon prods Allen Bradley product list attached to Change Proposal Requ credit will be offered on CPRROD4 as the work has already be performed. Requested Change Order Value Additional Time for Change: Labor $ - Burden $ - Rent $ - Fuel $ - Tools $ - Materiai $ 5,288.27 Transport $ 75.00 OH&Profit $ 794,00 Total $ 6,157.27 Days 70 Morales Com® PO Box 859, Florence, Tx 76527 Project: RR Transmission Line Seament 3 01 South Pattereon, Florence, Tx 76527 Phone (25,1) 7931344 Date: June 23, 2014 Fee (254)783-3844 C.O.R. No. 201411.03—Change PLC's Back to Allen Bradley Change Order Request Description of Change Order Request: Mr. John Peterson, This cost proposal Is in reference to the request to change back to Allen Bradley after your email response to TMC regarding TMCs RFI #01 -Regarding Radio Communication. Please note the work associated with the Change Order # 2 was completed by CPUSA and there is no credit for that Change Order. The CPR#4 Change Order# 2 cannot be cancelled. The work was performed. CPUSA has gone forward with the rework and resubmitted all the product documentation and completed the design drawings per the Modicon equipment. Please note, all work on the PLC's is at a stop. Our subcontractor CPUSA has reviewed this new change to go back to the Allen Bradley Products. Please note, we have not received an official document from Jacobs requesting this change back to Allen Bradley. This new proposal request and has provided a cost for the requested modifications back to Allen Bradley. Please make note that CPUSA has provided and submitted Control Panel submittals and Control Panel drawings based upon the original Allen Bradley components. These submittals were rejected and CPR#4 was generated for the Modicon Products. Will CPUSA need to resubmit the original Allen Bradley Submittal or can the Engineers simply fall back and review the product information that was previously submitted. If new submittals are required, CPUSA will need to redraw the schematics. Note that any additional resubmittals are "On Hold" pending a decision on this change proposal request. This change will require a new layout of the Panel Enclosures back to Allen Bradley as well as modifications to the wiring diagrams and schematics. CPUSA will now have to go back and reprogram per the AIIen Bradley product architecture. They have included those modifications in this proposal. In addition, they have stated that this will add 21 days to the project schedule from the time they receive the approval. In addition, they have been on hold waiting on a response to TMC RFI # 01. The days incurred waiting for the TMC RFI #01 Response will need to be added to the 21 days. Please note, we have not received any official written response to RFI #03 and no new CPR to go back to the Allen Bradley product. Please see the attached CP USA Proposal. The following are some notes, clarifications and exceptions we are taking when pricing this proposal: 1) Pricing is good for (30) days from date of proposal. Total Price: $5,288.27 CHANGE ORDER SUMMARY SHEET Morales Company Project Name: Round Rack Segment 3 Change Description: Change Modicon Products back to Allen Bradley Products TMC Change No: COR # 201411-03- Change Back to Allen Bradley Date: November 13, 2014 MATERIALSIQUOTES: Amount Op Rate Extended Misc Materials: $0.00 X 1 $0.00 Quote No. 1: $0.00 X 1 $0.00 Quote No. 2: $0.00 X 1 $0.00 Quote No. 3: $0,00 X 1 $0.00 Subtotal $0.00 Sales Tax $0.00 X 0.00% $0.00 MATERIADQUOTES SUBTOTAL $0.00 LABOR: M-UMOP Rate Extended Straight Time Labor 0 X $43.00 $0.00 Overtime Labor. 0 X $55.71 $0.00 Subtotal Manhours: 0 General Foreman ST Labor (10% of Man Hours): 0 X $48.28 $0.00 General Foreman OT Labor (10% of Man Hours): 0 X $72.40 $0.00 Material Proc. & Hndlg. Labor (5% of Man Hours): 0 X $23.91 $0.00 U date As Buiit "'In2s: 0 X $48.28 $0.00 SUBTOTAL LABOR: DIRECTJOB EXPENSES: Amount O Rale Extended Project Manager: 4 X $5400 $216.00 Expendable Tools (6%of Materials): $000 X 6% $0.00 Equipment: $0.00 X 1 $0.00 O&M's: $0.00 X 1 $0.00 Warranty on Material (3% of Matenals): $0.00 X 3% $0.00 an -an on Labor3%ot Labor' $0.00 X 3% $0.00 SUBTOTAL DIRECT JOB EXPENSES: $216.00 . MORALE$ COMPANY MARKUP$: Amount O Rate Extended Cost of Labor and Materials: $0.00 X -1$000 Cost of Tools, Eqpt and Facilities (Direct Job Expanses): $21600 X i $216.00 Work Comp/SS/Unemployment: $0.00 X 25.00% $0.00 SUBTOTAL: $216.00 OH&P 1st $10,000 of Costs @ 15%: $216.00 X 15.00% $32.40 OH&P Balance over 810000 10%: $0.00 X 10.00% $0.00 . MORALE$ COMPANY SUBTOTAL: $24846 SUBCONTRACTS WITH MARKUPS: Amount O Rate Extended Subcontract Ote No. 1 - $4,457.00 X 1 $4,457.00 Subcontract Qte No. 2- $0.00 X 1 $0.00 Subcontract Ole No. 3 - $0.00 X 1 $0.00 SUBTOTAL: $4,457.00 OH&P 1st $10,000 of Costs @ 10%: $4,45700 X 10.00% $44510 OH&P Balance over 810000 7.5%: SUBCONTRACTS SUBTOTAL: 54,90270 SUBTOTAL/SUMMARY: Amount O Rate Extended Liability/Builders Risk: $5,151.10 X 2.00% $103.02 SUBTOTAL: $5,254.12 P&P Band $100,000 or Less: $0.00 X 2.50% $0.00 P&P Bond $100,001 thm $500,000: $0.00 X 1.50% $0.00 P&P Bond $500,001 thru $2,500,000: $0.00 X 1.00% $0.00 P&P Bond $2,500,001 thru $5.000,000: $0 00 X 0.75% $000 P&P Band $5,000,001 thm $7,500,000: $0.00 X 0.70% $0.00 P&P Bond Over $7,500,000: $5,254.12 X 0.65 % $34.15 GRAND TOTAL THIS CHANGE: $5,288.27 Extension in Time Request, We would request an additional (65) days to be added to our contract time to perform this work. Including lost time waiting for TMC RFI k01 response. If you have any questions, please call me at (512) 848-5032. Sincerely, Sid Woodmansee Sid Woodmansee Project Manager E Control Panels USA Inc. CHANGE ORDER REQUEST 13-6865-02 DATE: November 7, 2014 PROJECT MANAGER: Sid Woodmansee COMPANYNAME: T. Morales Electrical PHONE: (512)848-5032 PROJECT: City of Round Rock— Treated Water Transmission Line Segmenta DESCRIPTION OF CHANGE: Change order #2 replacing Modicon system with Allen-Bradley Sid, All the time allocated in CPR# 4 has been used. If the original Allen-Bradley system is now required; our CAD files will need to be redrawn back to the layout and wiring of submittal 133WO02 A; for the purpose of providing accurate drawings with the delivery of the prowl. This is now, continuing to accrue project management time, administrative time, CAD, and programming time. The original submittal for the PLC hardware was not approved and prompted CPR#4, them for, CP USA will need to resubmit the specifications associated with the PLC hardware and software. As such, the cost to CP USA to switch back to the original Allen-Bredley system is estimated to the amount of $4,457.00. CP USA has had time lost and has now been on Hold with PLC-RR3 since September 11, 2014 when RFI 13-6865-01 was submitted. Therefore, if the original Allen-Bradley system is required, CP USA requests the following additional time to the contract to complete the work from the time that the Change Order is approved in writing: • On Hold time from September I la, until Change Oder is approved, plus • The hours specified in our tort break down • Time for engineer to comment and return the comments back to CP USA If you have any questions or concerns don't hesitate to contact raw. Thank you, Thomas Warrrn Project Manager TwarrenActm roloanelsuse net AUTHORIZATION TO PROCEED: By signing below I accept the change order as described above: Printed Name Date 1010 aiaaon Law•auadrg 1 Sola 100 'Awlo. T.78729 -Mm (512)8B3d224'Fu (512)8886UB• aw.co mnrmbura.rd Hours Actual Hour Cost with Overhead No Markup( Rate/hr Total Project Management Time 10 $ 112.00 $ 1,120 CAD Time 18 $ 92.00 $ 1,656 Programming Time 0 $ 128.00 $ Administrative Time 0 $ 72-00 $ - ManhourSubTotal $ 2,776 Equipment Difference $ 1,100 Markup $ 581 Change Order Total 1 $ 4,497 JACOBS RECOMMENDATION LETTER JACOBS November 19,2014 Jeff Bell Project Manager Utilities and Environmental Services Department City of Round Rock 2008 Enterprise Drive Round Rock, Texas 78664 Re: Treated Water Transmission Main — Segment 3 Mange Order #3 Dear Mr. Bell: 27M use Cave Road, Suite 3% Austin, Texas 98746 U.SA. 1.51 2.314.31M Fox 1.512.314.3135 Enclosed is the response from Layne Heavy Civil (Layne) to Change Proposal Request #6, which voids the previous change in PLC hardware and requires that the originally specified Allen Bradley equipment be famished and installed. The total requested change order value of $6,157.27 includes the following: 1. CAD and Project Management time for Control Panels USA (CPUSA) to make drawing revisions to incorporate the Allen Bradley equipment. 2. Equipment cost difference, which was previously deducted by Change Order #3. 3. Subcontract and prime contractor administrative markups from CPUSA, T Morales and Layne. In addition, Layne and its subcontractors are requesting an additional 70 calendar days as a result of the change. Based on discussions with Layne, T Monies and CPUSA, all parties will endeavor to complete the changes quickly as possible. Consequently, it is possible that the entire 70 days will not be required; however, this additional time is being requested as a worst case scenario. Jacobs has reviewed the information provided and hereby recommends acceptance of Layne's change proposal to add $6,157.27 and 70 calendar days to the contract. If you have any questions or need additional information at this time, please call. Sincerely, JACOBS ENGINEERING GROUP, INC. Glenn A. Bridges .E. Senior Project Engineer Wlendowre4 K1W)XK81W,cansvudionl70V00#3 tscnmmendeeon Ina, 111914.dac Jacobs Engineenng Group Inc. REQUEST FOR CHANGE ORDER NO. 011 Round Rock Water Transmission 3eament 3(TM3 Reauestfor Chanae Order Number011 Date 11/18/2014 Request for Change By: Layne 1775 E. 69th Ave Denver, Colorado 80229 Reason for Change and Description Change Proposal Request / Sta 129+50 purchase FLG/PE DIP pipe and excavate twice location (directed by CORR rep.) Requested Chanae Order Value Labor $ 2,018.00 Burden $ 764.00 Equip $ 1,375.00 Fuel $ 156.75 Tools $ 100.00 Blind Flange Service $ 1,425.00 Ferguson DIP $ 6,951.94 OH&Profit $ 1,918.60 Total $ 14,709.29 Additional Time for Change: Days 2,5 REQUEST FOR CHANGE ORDER NO. 012 Round Rock Water Transmission Segment 3(TM3) Request for Change Order Number012 Date 11/18/2014 Request for Change By: Reason for Change and Description Requested Change Order Value Layne 1775 E. 69th Ave Denver, Colorado 80229 BCRUA pipe connection repair. Damaged to pre-existing pipe at test head. Welding and Buttstrap application. Labor $ 720.00 Burden $ 324.00 18 Hrs combine welding Welding $ 1,728.00 Fuel $ 25.00 Tools $ 50.00 Service $ - Butt Strap Materials $ 315.00 OH&Profit $ 577.50 Total $ 3,739,50 Additional Time for Change- Days 2