Loading...
CM-08-03-071DATE: SUBJECT: ITEM: March 17, 2008 City Manager Approval - March 21, 2008 Action authorizing the City Manager to execute a Notice of Intent (NOI) with the Texas Commission on Environmental Quality (TCEQ) General Storm Water Permits Division for the City of Round Rock Raw Water Delivery System Improvements - Pipeline Project. Department: Water and Wastewater Utilities Staff Person: Justification: Michael D. Thane, P.E., Director of Utilities TCEQ requires that a NOI be filed by the City of Round Rock (CORR) for any construction project disturbing an area of five (5) or more acres. Since the estimated amount of disturbed area for this project is 10.8 acres, a NOI is required. Funding: Cost: $100.00 Source of funds: Capital Project Funds (Self -Financed Utility) Outside Resources: Camp, Dresser, and McGee, Inc. Background Information: The WTP was expanded to a capacity of 48 million gallons per day (mgd) with the completion of the Phase V plant expansion. The Raw Water Pump Station located on Lake Georgetown and existing pipelines currently have the capacity to deliver 39 mgd to the WTP. The Raw Water Pump Station located on Lake Georgetown is currently under construction improvements to bring its capacity to 52 mgd. This contract will authorize the replacement of approximately 17,000 linear feet of the original 1981 30" Raw Water Line from the Lake Georgetown Pump Station to S.H. 29. The new line will be 54" for 12,980 linear feet and 48" for 4,240 linear feet. In combination with the existing 1995 30" Raw Water Line, these two raw water line will have the capacity to deliver 52 mgd of raw surface water to the WTP. In addition, the City is in the process of having the existing 48 mgd WTP re -rated with the Texas Commission on Environmental Quality to 52 mgd. Public Comment: N/A Blue Sheet Format Updated 01/20/04 TCEQ Office Use Only Notice of IntentNOI for Storm Water rei Intent(N01) Permit No.: Discharges Associated with Construction RN: 1111111110 Activity under TPDES General Permit CN: TCEQ (TXR150000) Sign up now for on line NOI at http://www.tceq.state.tx.us/permitting/steers/steers.html Get Instant Approval Did you know you can pay on line? Go to https:i/www6.tceq.state.tx.us/epay/ lie Select Fee Type: GENERAL PERMIT CONSTRUCTION STORM WAFER. DISCHARGE NOI APPLICATION Application Fee: You must pay the $100 Application Fee to TCEQ for the application to be considered complete. How did you pay this fee? Mailed: ❑ Check/Money Order No.: Name Printed on Check: EPAY: i Voucher No.: 582EA000032621 Is the Payment Voucher copy attached? / Yes IMPORTANT: •Use the attached INSTRUCTIONS when completing this form. •After completing this form, use the attached CUSTOMER CHECKLIST to make certain all items are complete and accurate. •Missing, illegible, or inaccurate items may delay final acknowledgment or coverage under the general permit. A. OPERATOR (applicant) 1. If the applicant is currently a customer with TCEQ, what is the Customer Number (CN) issued to this entity? CN 11047 2. What is the full Legal Name of the applicant? City of Round Rock (The legal name must be spelled exactly as filed with the Texas Secretary of State, County, or in the legal document forming the entity.) 3. What is the applicant's mailing address as recognized by the US Postal Service? Address: 221 East Main Street Suite No./Bldg. No./Mail Code: City: Round Rock State: Texas ZIP Code: 78664 Country Mailing Information (if outside USA). Country Code: Postal Code: 4. Phone No.: ( 512 ) 218-5400 Extension: 5. Fax No.: ( 512 ) 218-7097 E-mail Address: 6. Indicate the type of Customer: ❑ Individual 0 Sole Proprietorship-D.B.A. ❑ LimitedPartnership RGeneral Corporation ❑Federal Government Partnership ❑ State Government ❑County Government City Government []Other: 7. Independent Operator: ■.Yes FI No (If governmental entity, subsidiary, or part of a larger corporation, check "No".) 8. Number of Employees: [] 0-20; ❑ 21-100; ❑ 101-250; • 251-500; or 1 501 or higher 9. Customer Business Tax and Filing Numbers (This item is not applicable to Individuals, Government, GP or Sole Proprietor.) REQUIRED for Corporations and Limited Partnerships State Franchise Tax ID Number: Federal Tax ID: TX SOS Charter (filing) Number: DUNS Number (if known): B. BILLING ADDRESS The Operator is responsible for paying the annual fee. The annual fee will be assessed to permits active on September 1 of each year. TCEQ will send a bill to the address provided in this section. The Operator is responsible for terminating the permit when it is no longer needed. Is the billing address same as the Operator Address? i Yes, go to Section C. No, fill out Section B 1. Billing Mailing Address: Suite No./Bldg. No./Mail Code: City: State: ZIP Code: 2. Country Mailing Information (if outside USA). Territory: Country Code: Postal Code: 3. Billing Contact (Attn or C/O): 4. Phone No.: ( ) Extension: 5. Fax No.: ( ) E-mail Address: TCEQ-20022 (12/01/2006) CM -0(?) --U3- n9 Page 1 C. APPLICATION CONTACT If TCEQ needs additional information regarding this application, who should be contacted? 1_ Name: Don Rundell, P.E. Title: Chief Utility Engineer Company: City of Round Rock, Texas 2. Phone No.: ( 512 ) 218-5554 Extension: 3. Fax Na: 512 218-3242 E-mail Address: drundell@round-rock.tx.us D. REGULATED ENTITY (RE) INFORMATION ON PROJECT OR SITE 1. TCEQ Issued RE Reference Number (RN) (if available): RN101403632 2. Name of Project or Site (the name as known by the community where this facility/project is located): City of Round Rock Raw Water Delivery System Improvements - Pipeline project (example: phase and name of subdivision or name of project that's unique to the site) 3. Physical Address of Project or Site: (enter in spaces below) Street Number: Street Name: City: Georgetown ZIP Code: County (Counties if>1): Williamson 4. If no physical address (Street Number & Street Name), provide a written location access description to the site: (Ex.: phase 1 of Woodland subdivision located 2 miles west from intersection of Hwy 290 & IH35 accessible on Hwy 290 South) Between the intersection of DB Wood Rd and Lake Georgetown Access Road and the intersection of DB Wood Road and SH 29 a 5. Latitude: SH 29 & DB Wood: LAT 30°37'56.57" N Longitude: SH 29 & DB Wood: -97'42'30.69' W 6. What is the primary business of this entity? In your own words, briefly describe the primary business of the Regulated Entity: (Do not repeat the SIC and NAICS code) Municipal Utility 7. What is the mailing address and contact information for the regulated entity? Is the RE mailing address the same as the Operator? / Yes address is the same as Operator No, provide the address Street Number: Street Name: City: State: 7.TP Code: E. GENERAL CHARACTERISTICS 1. I certify that the project/site is not located on Indian Country Lands? 0 Yes ❑ No If No, you must obtain authorization through EPA, Region VI. 2. Is this NOI being submitted due to a change in Operator? ❑ Yes i No 3. What is the Standard Industrial Classification (SIC) code (see instructions for common codes): Primary: 16 Secondary: 1623 4. What is the total number of acres disturbed? 10.8 acres Is the project site part of a larger common plan of development or sale? ❑Yes If Yes, the total number of acres disturbed can be less than 5 acres. If No, the total number of acres disturbed must be 5 or more. If the total number of coverage through this Notice of Intent. Coverage will be denied. See the requirements + acres No disturbed is less than 5 then the project site does not qualify for in the general permit for small construction sites. 5. Discharge Information a What is the name of the first water body to receive the storm water runoff or potential runoff from the site? Middle Fork San Gabriel River 1248D b. What is the segment number(s) of the classified water body(s) that the discharge or potential discharge will eventually reach? 1248 c. Is the discharge into an MS4? ❑ Yes If Yes, what is the name of the MS4 Operator? Note: The general permit requires you to send i No a copy of the NOI to the MS4 Operator. 6. Is the discharge or potential discharge within the Recharge Zone, Contributing Zone, or Contributing Zone within the Transition Zone of the Edwards Aquifer? Q Yes EINo If the answer is Yes, please note that a copy of the agency approved Plan required by the Edwards Aquifer Rule (30 TAC Chapter 213) must be included in the Storm Water Pollution Prevention Plan. TCEQ-20022 (12/01/2006) Page 2 G. CERTIFICATION James R. Nuse, P.E. Typed or printed name Title (Required) City of Round Rock City Manager certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. I further certify that I am authorized under 30 Texas Administrative Code §305.44 to sign and submit this document, and can provide documentation in proof of such authorization upon request. Signature: se Blue Ink) Date: " ()' �1 T('F(1_7(1/177 1117/17/'Mfld\ Pane. 2 of'1 Did you complete everything? Use this checklist to be sure! Are you ready to mail your form to TCEQ? Go to the General Information Section of the Instructions for mailing addresses. TCEQ-20022 Checklist (12/01/2006) Page 1 Customer GP Notice of Intent Checklist TXR150000 d This checklist is for use by the operator to ensure a complete application. Missing information may result in denial of coverage under the general permit. (See NOI Process description in the Instructions) 12 Application Fee was sent to TCEQ's Cashiers's Office and the check information is listed, or the EPAY payment voucher is attached. OPERATOR INFORMATION - Confirm each item is complete: d Customer Number (CN) issued by TCEQ Central Registry Legal Name as filed to do business in Texas (Call TX SOS 512/463-5555) Operator Mailing Address is complete & verifiable with USPS. WWW.usps.com 0 Fi GI II Phone Numbers/E-mail Address Type of Operator (Entity Type) Independent Operator Number of Employees For Corporations or Limited Partnerships - Tax ID and SOS Filing numbers Fi ■ 0 MI FI Billing Address is complete & verifiable with USPS. www.usps.com 1 DDD REGULATED ENTITY (RE) INFORMATION ON PROJECT OR SITE - Confirm each item is complete: f Regulated Entity Reference Number (RN) (if site is already regulated by TCEQ) Site/Project Name/Regulated Entity Site/Project (RE) Physical Address Please do not use a rural route or post office box for a site location Latitude and Longitude wnvNv.tcea.state.tx.us'ais/draview.html or www.terraserver.microsoft.com/advfind.aspx. Business description Site Mailing Address (checked same as operator or complete & verifiable with USPS. www.usps.com) ❑ BOBBER GENERAL CHARACTERISTICS - Confirm each item is complete: d Indian Country Lands -the facility is not on Indian Country Lands Change in Operator Standard Industrial Classification (SIC) code www.osha-czovi oshstats. sicser.html Acres Disturbed is provided and qualifies for coverage through a NOI. Discharge Information (receiving water body, segment no. and MS4 Operator) Edwards Aquifer Rule CERTIFICATION Certification statements have been checked indicating "Yes" Signature meets 30 Texas Administrative Code (TAC) §305.44 and is original and has been provided for the Operator. 151 o TCEQ-20022 Checklist (12/01/2006) Page 1