CM-08-04-084DATE: March 31, 2008 SUBJECT: City Manager - April 04, 2008 ITEM: Action authorizing the City Manager to execute Change Order No. 1 to the Construction Contract with Lewis Contractors, Inc. for the East Water Transmission Line - Phase 3B-2 Improvements Project. Department: Water and Wastewater Utilities Staff Person: Michael D. Thane, P.E., Director of Utilities Justification: Change Order No. 1 includes adjustments in bid quantities required to successfully complete and close-out this project. This Change Order No. 1 includes the deletion of the relocation of an existing wastewater line due to field conditions, the installation of additional restraints on 8" valves at two locations, and the reduction in the allowance for repair of existing irrigation lines on Red Bud Lane and Forest Creek Drive. Funding: Cost: $(10,816.71) Source of funds: Capital Project Funds (Self -Financed Utility) Amount % Change Original Contract $2,116,004.00 N/A Change Order # 1 ($10,816.71) (0.51%) Revised Contract $2,105,187.29 (0.51%) Outside Resources: Lewis Contractors, Inc. (Contractor) HDR Engineering, Inc. (Design Consultant) Background Information: The East Water Transmission Line, Phase 3B-2 Improvements project includes the construction of approximately 5,400 feet of 30" water line along (County Road 122) Red Bud Lane from Old Setltler's Blvd. to (US 79) Palm Valley Blvd.. This water line is required to meet current and future water demands in the east and southeast areas of the City, and is a part of the Water Distribution Master Plan dated August 2004. In addition, the construction of the 12 -inch Forest Creek Water Line Improvements was included in this construction contract as well. The Forest Creek water line is 1,185 linear feet and is located along the south side of Forest Creek Drive and extends from Red Bud Lane to St. Andrews Drive. Public Comment: N/A Blue Sheet Format Updated 01/20/04 ""e L Lewis Contractors, Inc. P.O. Box 1623 Bertram, Texas 78605 (512)355-9094 Fax (512)355-2992 Letter of Transmittal Date: March 25, 2008 To: City of Round Rock Attn: Don Rundell Project: East Transmission Line, Phase 3B-2 Regarding: Change Order # Copies Description 3 Change Order # 1 Transmitted by: JENNIFER HARGROVE LEWIS CONTRACTORS, INC. PO BOX 1623 BERTRAM, TX 78605 C I- a Change Order No. 1 Project Name: East Water Transmission Line, Phase 3B-2 HDR Project No.: 07225-33650 Project Owner: City of Round Rock 212 Commerce Cove, Round Rock, TX 78664 Date of Issuance: March 21, 2008 Project Contractor: Lewis Contractor's Inc. P. 0. Box 1623 107 N. Grange Bertram, TX 78605 Date of Contract: April 19, 2007 Date of Notice to Proceed: June 4, 2007 Original Completion Date: December 31, 2007 Contract Period: 210 Calendar Days It is agreed to modify the Contract referred to above as follows: CPR # ITEM AND DESCRIPTION OF CHANGES CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME 1 Restrain 8" valves to 16" Tees at 2 locations $ 4,224.29 1 CO #1 Delete Bid Sheet Item No. 43. Not required based on field conditions. ($2,500.00) 0 CO #1 Reduce Bid Item No. 13 from $20,000 to $9,365 for irrigation restoration allowance on Red Bud Lane. Deduct amount show in next column. ($10,635.00) 0 CO #1 Reduce Bid Item No. 49 from $10,000 to $8,094 for irrigation restoration allowance on Forest Creek Road. Deduct amount show in next column. ($1,906.00) 0 Difference Net ($10,816.71) 1 Summary: It is agreed to modify the Contract referred to above as follows: Contract Price prior to this Change Order Contract Time prior to this Change Order $ 2,116,004.00 Net Increase (decrease) of this Change Order $ (10,816.71) 210 days - March 20, 2006 Net Increase (decrease) of this Change Order 1 Revised Contract Price with all approved Change Orders Revised Contract Time with all approved Change Orders $ 2,105,187.29 211 days - January 1, 2008 The changes included in this Change Order are to be accomplished in accordance with the terms, stipulations and conditions of the original Contract as though included therein. Accepted for Contractor by: LEWIS CONTRACTORS , INC . Date: LES ARD MEREDI V.P. //'J Recommended for Apprv y (HDR Engineering, Inc.): it A•proved for Owner by: Attest: att affai 3-24-08 Date: 7/0 Date: ed: (Other - when required) Date: Distribution: 0 Owner 0 Contractor 0 Office 0 Field 0 Other -06-bL -ogy 106 07 10:22a Jennifer Hargrove 71 512-355-3094 p.1 Vla -i-at ala- Jia•L576-6r 7 pp. Change Proposal Request No. 1 (Not a Change Order) Project Name: East Water Transmission Line — Phase 38-2 Owner's Project No. (if applicable): n/a Project Owner. City of Round Rock Regulatory Agency Project No. (if applicable): nla HDR Project No. 07225-33650 Inttiated by: 0 Engineer CD Contractor Contractor Lewis Contractors, Inc. Date: 9-6-07 Attention: The following change in the contract on this project is proposed. Please provide your proposed price for the cost of this change. • A breakdown of cost SHALL. be provided upon request by the Owner or Engineer. • Work shall not commence until authorized by the Owner. Description of the Proposed Change: Restrain B" Valves to 16" Tees in 2 different locations (Sta 14+25 and Sta 25+15). $4,224.29 See attached Proposal for breakdown of costs. By All work shall be in accordance with the terms. stipulations. and conditions of the original Contract Documents. If the work herein provided for is Approved by Change Order, the time of completion will be: ® Increased by 1 calendar days. This change will: In Add $ 4,224.29 0 Decreased 0 Unchanged 0 Deduct 0 No Change HDfit Recommendation: j Recommend Acceptance ❑ Do Not Recommend Acce •lance Date Ole rActin: 4007 ,p�,�/�/ Accep =d % /I • Accepted Lewis Contractors, In r,'v4 _ ./�i General Contractor By: • er Date 9-6-07 (Jun 1990; Revised Oct 2001) Date Form 8010-02 Sep 06 07 10:22a Jennifer Hargrove 512-355-3094 p.2 Lewis Contractors, Inc. P.O. Box 1623 Bertram, Texas 78605 To; HDR Engineering 4401 West Gate Blvd., Suite 400 Austin, Texas 78745 Request For Construction Change Order 81 Project East Water Transmission Line - Phase 36-2 Project Number. 07225-33650 Item No. Description Restrain 8" Valves to 16" Tees (Sta 14+25) Restrain 8" Valves to 16` Tees (Sta 25+15) Liability and Builder's Risk insurance Payment and Performance Bonds Total Change Order No. 1 Previous Change Orders Change Orders To Date Contract Amount Revised Contract Amount Quantity Unit 1.00 EA 1.00 EA 1.00 LS 1.00 LS defib 1/GPS Lewis Contractors, Inc. Represenlatr�ie and Title Page 1 of 2 9/6/2007 Unit Price $ 2.050.63 $ $ 2,050.63 $ 2.00% $ 1.00% $ Amount 2,050.63 2,050.63 82.03 41.01 $4,224;Er $4,224 • $4,224.29 52,116,004.00 $2,120,228,29 ea7 Date HDR Engineering, Inc. Date City of Round Rock Reason: Restrain 8" Valves to 16" Tees at 2 different locations_ Sta 14+2.5 and Sta 25+16 Date Sep 06 07 10:23a Jennifer Hargrove 512-355-3094 P•3 Lewis Contractors, Inc. P.O. Box 1623 Date : 9/6/2007 Bertram, Texas 78605 Request for Construction Change Order 111 To: HDR Engineering, Inc - 4401 West Gate Blvd., Suite 400 Austin, Texas 78745 Project East Water Transmission Line - Phase 36-2 Project Number. 07225-33650 Sta 14+25 Page 2of2 MATERIALS 180.00 8" Foster Adaptors %I/accessories 1 ea 180.00 $ 8" MJ Plugs 1 ea 36.00 $ 36.00 Sand 0.5 ton 13.00 $ 6.50 Material & Supplies Compensation 1125 5 278.13 EQUIPMENT 320 Cat Trackhoe 3 hrs 125.00 5 375.00 320 Komatsu/938 Cat Loader 2 hrs 105.00 5 210.00 Trench Roller 2 hrs 55.00 $ 110.00 Pickup 2 hrs 20.00 $ 40.00 LABOR Superintendent (1 each) Foreman (1 each) Laborer. Common (1 each @ 10 tours each) Operator (1 each ® 10 hours each) Driver (1 each) Material & Supplies Cornpensation Sta 25+15 2 hrs 60.00 $ 120.00 5 hrs 42.00 $ 210.00 10 hrs 18.00 5 180.00 10 hrs 22.00 $ 220.00 5 hrs 20.00 $ 100.00 0.25 S 1,037.50 TOTAL FOR STATION 14+25 $ 2,050.63 MATERIALS 8' Foster Adaptorsw/accessories 1 ea 180.00 $ 180-00 8' MJ Plugs 1 ea 36.00 $ 36.00 Sand 0.5 ton 13.00 $ 6.50 Material & Supplies Compensation 0.25 5 55.63 $ 278.13 EQUIPMENT 320 Cat Trackhoe 320 Komatsu/938 Cat Loader Trench Bolter Pickup LABOR • Superintendent (1 each) Forernan (1 each) Laborer, Common (1 each ;' 10 hours each) Operator (1 each @ 10 hours each) Driver (1 each) Material & Supplies Compensation 3 hrs 125.00 $ 375.00 2 hrs 105.00 $ 210.00 2 hrs 55.00 $ 110.00 2 hrs 20.00 5 40.00 $ 73500 2 hrs 5 hrs 10 hrs 10 hrs 5 hrs 60.00 $ 120.00 42.00 $ 210.00 18.00 $ 180.00 22.00 5 220.00 20.00 $ 100.00 0.25 S 207.50 Sr1,037.50 TOTAL. FOR STATION 25+15 $ 2,050.63 Sep 06 07 10:23a Foster Adaptor Jennifer Hargrove OF ACT -warm NA 11AVIGIt PROMO'S Po. rk FLEX T•2 Ala T•3 512-355-3094 p.4 rage 1 01 L FACS Aij i:ORPORATr3N Sqv r space 111111111 ADAPTOR/REDUCER US Patent No. 9174615 Canadian No. 2078799 Mexican Ne. 380410 AN Intact Pro0U69 aro made In U.S.A. Callyour local watemorts ginionutar far price RtOlm t0 PVOdua L1St c• MUD PLUGS INSULATION FOSTER ADAPTOR CALL TOLL -FRE* 688-773-9130 FOA SPECS OR FRE* PRODUCT CATALOG http_//www.infactco:p_com/index_filcs/Page556.him 8/2212007 Sep 06 07 10:23a Jennifer Hargrove 512-355-3094 Foster Adaptor p.5 Page 2 of 2 http_//www.infactcorp.eom/index files/Page556.httn 8/22/2007 Sep 06 07 10:23a AU0 21 07 02:38p Jennifer Hargrove Linda Hardy 512-355-3094 5127785226 p.6 p.1 23U 2/LagAlirl-LeJ1- Mechanical Joint Compact Fittings 1 1 42 .1 0 C A .3r rn 1f I1 r Y// 1//lam//.%f' J//,%/!r,%t 1175 012 F K' • 2" through 48' ANSI/i41MWA C153/A21.53 3"-24" @350 PSI; 30'-48" & fittings with Flanged branches at 250 P51 Meets all requirements, UL Certified ANSt/AWWA C104/A21-4 ANSI/AIMNA C104.A21.4, Double Available ANSI/AWWA C116/A2 T .16 Available ANSI/AWWA Cl 11/A21.11 AWWA C600 Size A Dice. 8 C Dia DOW- F Dia. J Dia. X1 Dia. K2 Dia. L M S 3 3.96 2.50 4.84 4.94 4.06 6.19 7.62 7.69 .58 .62 .39 4 4.80 2.60 5.92 6.02 4.90 7.50 9.06 9.12 .60 .75 .39 6 6.90 2.50 8.02 8.12 7.00 9.50 11.06. 11.12 .63 .88 .43 8 9.05 2.50 10.17 10.27 9.15 11.75 13.31 13.37 .66 1.00 .45 10 11.10 2.50 12.22 12.34 71.20 14.00 15.62 15.62 .70 1.00 .47 12 13-20 2.50 14.32 14.44 13.30 16.25 17.88 17.88 .73 1.00 .49 74 15.30 3.50 16.40 16.54 15.44 18.75 20.31 20.25 ,79 1.25 .56 16 17.40 3.50 18.50 18.64 17.54 21.00 22.56 22.50 .85 1.31 .57 18 19.50 3.50 20.60 20.74 19.64 23.25 24.83 24.75 '1.00 1,38 .68 20 21.60 3.50 22.70 22.84 21.74 25.50 27.08 27.00 1.02 1.44 .69 24 25.80 3.50 26.90 27_04 25.94 30.00 31.58 31.50 1.02 1.56 .75 30 32.00 4.013 33.29 33.46 32.77 36.88 39.12 39.12 1.31 2.00 .82 36 38.30 4.00 39.59 39.76 38.47 43.75 46.00 46.00 1.45 2.00 1.D0 42 44.50 4.00 45.79 45.96 44.67 50.62 53.12 53.12 1.45 2,00 1.25 48 50.80 4.00 52.09 52.26 50.97 57.50 60.00 60.00 1.45 2.00 1.35 .33 .34 .36 .38 .40 .42 .47 .50 _54 .57 .61 .66 .74 .82 .90 X Size 'y. %%3 Ye 3.4x3'4 %.x31 3/.x3'/2 Ye 36z3'h %r 'Yus4 • VAz4 • '✓+x4 • %x4 '!a 'l4x4'A 1) 1x51,5 1 4 1x5',4 1% 1'4x61 1'14 1'/.x6'6 • va We. 4 4 6 6 8 8 10 12 12 14 16 20 24 28 32 Tyler Pipe/IA/Mies Division • Bex 2027 • Tyler, Texas 75710 • 1800) 527-8478 r • . Sep 06 07 10:23a Aug 21 07 02:38p Jennifer Hargrove Linda Hardy Itler/Urion SC D & TAPPED PLUS & CAPS 3"-12' 74'-24" MJ Pima 3--12* 14--24' MI Cap Deasns:au Moe. Weighis Size T Tap Plugs. Cops 3 .46 2 9 8 4 .46 2 9 10 6 .46 2 18 18 8 .46 1 25 26 10 .56 2 36 32 12 .56 2 47 46 14 .62 2 76 85 16 .62 2 98 94 18 .65 2 138 121 20 .66 2 158 149 24 .68 2 223 210 30 .66 2 355 3.45 36 .74 2 688 626 TAPPED TEE M1 Tapped Tae (2' Tap) Dimensions Sire T l Mimic Tap Weights 3 .34 6 2 19 4 .35 6 2. 23 6 .37 6 2 35 8 .39 6 2 54 10 .41 6 2 68 12 .43 6 2 88 16 .52 6 2 164 512-355-3094 5127785776 P.7 p.2 MECHANICAL JOINT C153 DUCTILE IRON COMPACT FITTINGS Sizes 3' thru 12' UL Listed For Fire Main Equipment SOLID SLEEVES Short Long Dimensions Weights Size T L' L= Short Long 3 .34 7,5 12 13 22 4 .35 7.5 12 19 25 6 .37 7.5 12 28 39 8 .39 75 12 38 55 10 .41 7.5 12 48 68 12 .43 7.5 12 62 81 14 .56 9.5 15 116 146 16 .57 9.5 i 5 138 174 18 .68 9.5 15 160 230 20 .69 9.5 15 212 269 24 .75 9.5 15 272 380 30 -66 15.0 15 500 ... 30 .66 ... 24 ... 640 36 .74 15.0 15 725 ... 36 .74 24 925 42 .82 24 1146 48 .90 24 1455 NU x FE ADAPTERS FElepE Dimensions Weights Size T Le V M.MFE FE4°8 3 .34 6 12 18 ... 4 .35 6 12 26 23 6 .37 6 12 36 35 8 .39 6 12 50 50 10 .41 6 12 60 69 12 .43 6 12 88 88 14 .51 6 12 127 ... 16 .52 6 12 155 149 20 .60 6 _.. 275 ... 30 _66 a 470 36 .74 8 750 Tyler Pipe/Utilities Division ' Iles 2027 - Tyler, Tacos 75710 - (8001 527-8:478