Loading...
CM-08-05-121DATE: May 5, 2008 SUBJECT: City Manager Approval - May 9, 2008 ITEM: Action authorizing the City Manager to execute a Construction Site Notice (CSN) with the Texas Commission on Environmental Quality (TCEQ) General Storm Water Permits Division for OId Settlers Park Sports Complex Improvements. Department:, Engineering and Development Services Staff Person: Danny Ha!den, P.E., City Engineer Justification: TCEQ recently updated its rules and regulations for all CSNs. As of March 3, 2008, all current CSNs must be renewed before June 3, 2008, or they will expire. Since this CSN became effective on January 24, 2008, City of Round Rock is required to submit a CSN renewal as the secondary operator. Chasco Constructors and Journeyman Construction are the primary operators of the CSN for this project. Fundina: Cost: N/A Source of funds: N/A Outside Resources: Chasco Constructors Journeyman Construction Background Information: The Sports Capital of Texas Concept was developed in 2004 as a marketing tool for the City. In support of this concept, it was determined that the City should provide necessary upgrades to our existing sports complexes at OId Settlers Park to make them top notch recreational and tourism facilities. This project will construct parking lots at the Southwest, Southeast, Northeast, and new Girls' Softball Complexes. This project will also include the installation of utilities (water, wastewater, storm sewer, and electrical main lines) to all five ball field complexes. In addition, this project will install a pedestrian bridge crossing near the north end of the lake in Old Settlers Park as part of the Lakeside Trail Project. Public Comment: N/A Blue Sheet Format Updated 01/20/04 Construction General Permit TPDES General Permit TXR150000 Attachment 3 IMINIIIIIIr -0111111111111111.11 LARGE CONSTRUCTION SITE NOTICE FOR THE Texas Commission on Environmental Quality (TCEQ) Storm Water Program TPDES GENERAL PERMIT TXR150000 "SECONDARY OPERATOR" NOTICE This notice applies to secondary operators of construction sites operating under Part II.E.3. of the TPDES General Permit Number TXR150000 for discharges of storm water runoff from construction sites equal to or greater than five acres, including the larger common plan of development. The information on this notice is required in Part III.E.2. of the general permit. Additional information regarding the TCEQ storm water permit program may be found on the internet at: http://www.tceq.state.tx.us/naviperniits/sw perrnits.html For Large Construction Activities Authorized Under Part II.E.3. (Obtaining Authorization to Discharge) the following certification must be completed: I James R. Nuse (Typed or Printed Name Person Completing This Certification) certify under penalty of law that I have read and understand the eligibility requirements for claiming an authorization under Part II.E.2. of TPDES General Permit TXR150000 and agree to comply with the terms of this permit. A storm water pollution prevention plan has been developed and will be implemented prior to construction, according to permit requirements. A copy of this signed notice is supplied to the operator of the MS4 if discharges enter an MS4. I am aware there are significant penalties for providing false information or for conducting unauthorized discharges, including the possibility of fine and imprisonment for 1piowing violations. Signature and Title Date Page 49 Date Notice Removed MS4 operator notified per Part II.F.3. 4 Site -Specific TPDES Authorization Number: TXR15JS51 - from previous submittal Operator Name: City of Round Rock Contact Name and Phone Number: Casey Frizzell, Capitol Environmental, Inc. 512-627-3511 Project Description: Physical address or description of the site's location, and estimated start date and projected end date, or date that disturbed soils will be stabilized. Old Settlers Park Sports Complex Improvements 1.6 miles east of the intersection of Old Settlers Blvd and FM 1460, soRound RockOld, STexasr's Blvd. uth ofettle Estimated Start Date: January 2008``e Estimated Completion Date: -2.2,8. -6 9 Location of Storm Water Pollution Prevention Plan (SWP3): 2008 Enterprise Dr. Round Rock, Texas 78664 and/or Construction Trailer For Large Construction Activities Authorized Under Part II.E.3. (Obtaining Authorization to Discharge) the following certification must be completed: I James R. Nuse (Typed or Printed Name Person Completing This Certification) certify under penalty of law that I have read and understand the eligibility requirements for claiming an authorization under Part II.E.2. of TPDES General Permit TXR150000 and agree to comply with the terms of this permit. A storm water pollution prevention plan has been developed and will be implemented prior to construction, according to permit requirements. A copy of this signed notice is supplied to the operator of the MS4 if discharges enter an MS4. I am aware there are significant penalties for providing false information or for conducting unauthorized discharges, including the possibility of fine and imprisonment for 1piowing violations. Signature and Title Date Page 49 Date Notice Removed MS4 operator notified per Part II.F.3. ti 0 O p Q O 0 0 .2 z H TXR15JS51 Coverage Effective: January 24,2008 8 t 3 •o t) Ov O . O •cd U C3 "8 y F Q .) y a)0° CG E G. y 75 • 0.zal • 3.75 O LL o 6 0 0 0 u o U o • T o a m Q c, 4' o a, .� rn U Aw 0 c1 z ti O W 3 u >� O C)g a O N- (-) - I- G to g WH 2 .o • E N U • O ce 0 b 20 E .) o 0 CG 0 N O d w ) CO J wo� • O M N F w U O Z 0 • g o0 g I a o 8w o� 3 y 5 _ZIw-> C m Z J 4.:= 0 8 O .� J w H 0 a a�U�cA Issued Date: FOR THE COMMISSION