Loading...
CM-08-05-130DATE: May 21, 2008 SUBJECT: City Manager Approval - May 23, 2008 ITEM: Action authorizing the City Manager to execute Change Order No. 2 with Enviro Remediation Coatings Services, Inc. for the 2005-2006 Wastewater Collection System Rehabilitation Project. Department: Water and Wastewater Utilities Staff Person: Michael Thane, P.E., Director of Utilities Justification: The City is required to inspect, repair, and certify its wastewater collection system in compliance with the Texas Commission on Environmental Quality's Edwards Aquifer Recharge Zone Protection Program. This change order adjusts quantities for concrete repair (sidewalk and driveway aprons) which was not a part of the original bid. Funding: Cost: Source of funds: WW Utility Fund (F260) $18,075.00 Outside Resources: RJN Group, Inc. (Engineering Consultant) Background Information: This project rehabilitates defective sewers, which were identified in the 2005-2006 Wastewater Collection System Inspection Project in three Edwards Aquifer Basins (CC -32Z, OC -30Z, and BC -22Z). The elimination of defects not only helps protect the aquifer, but also reduces inflow and infiltration entering the sewer system, thereby reducing the City's treatment cost from the Lower Colorado River Authority and the Brazos River Authority, who respectively own and operate the Brushy Creek Regional Wastewater Treatment Plant. The scope of the project includes cured -in-place pipe, liner patches, point repairs, pipe bursting, boring, conventional pipe replacement, internal joint grouting, and manhole rehabilitation and replacement. Public Comment: N/A Blue Sheet Format Updated 01/20/04 Amount % of Change Original Contract $2,112,690.00 N/A Previous Change Order (S267.00) 0.01% Change Order No. 2 $18,075.00 0.86% Revised Contract $2,130,498 0.84% Outside Resources: RJN Group, Inc. (Engineering Consultant) Background Information: This project rehabilitates defective sewers, which were identified in the 2005-2006 Wastewater Collection System Inspection Project in three Edwards Aquifer Basins (CC -32Z, OC -30Z, and BC -22Z). The elimination of defects not only helps protect the aquifer, but also reduces inflow and infiltration entering the sewer system, thereby reducing the City's treatment cost from the Lower Colorado River Authority and the Brazos River Authority, who respectively own and operate the Brushy Creek Regional Wastewater Treatment Plant. The scope of the project includes cured -in-place pipe, liner patches, point repairs, pipe bursting, boring, conventional pipe replacement, internal joint grouting, and manhole rehabilitation and replacement. Public Comment: N/A Blue Sheet Format Updated 01/20/04 CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Utility Administration PROJECT: 05-06 WW Rehab Project BC -22, CC -32, OC -30 ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: 2,112,690.00 ($267.00) $18,075.00 $17,808.00 CHANGE DATA PAGE 1 OF 1 DATE: 5/13/2008 CHANGE ORDER NO: 2 JUSTIFICATION: Change in quantities ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE O c z -I ADDED CALENDAR DAYS U1-#25 Concrete paving SY 241 $75.00 $18,075.00 PREPARED RJN, Inc. ENGINEER Enviro Remediation Coating Services, Inc 5/12/2008 DATE SIGNATURE: PRINT NAME! APPROVED: NAME OF CONTRACTOR Randy Chilton, President 5/13/2008 CITY OF ROUND ROCK TOTAL: $18,075.00 0 % OF ORIG. CONTRACT PRICE THIS CHANGE ORDER: 0.86% PREV. CHANGE ORDEF -0.01% TOTAL % CHANGE: 0.84% ORIG. CONTRACT PRICE PLUS CHANGE ORDERS: $2,130,498.00