Loading...
CM-08-06-172DATE: May 29, 2008 SUBJECT: City Manager - June 13, 2008 ITEM: Action authorizing City Manager to approve Woods Construction for the Round Rock Police Facility. e Order No. 14 with FT Department: Engineering and Development Services Staff Person: Tom Word, Chief of P.W. Operations Larry Madsen, Construction Manager Justification: Change order No. 14 includes additions that were not part of the original architectural plans but were required to complete project and meet city codes. Cross connects to complete hookup of data closets were not specified in plans, as well as a drain for an ice machine. During the final Inspection of the Fire Emergency Exit lighting, additional signage and exit lighting were added to the Fire Marshal's approval which were not part of the original plans, changes were reviewed by the architect, the contractor and the city construction manager and are recommended for approval. Funding: Cost: Source of funds: $15,888.90 2002 GO Bonds & General Self Finance Construction Original Contract Previous Change Orders Change Order No. 14 Revised Contract Amount $10,884,000 $555,218.87 $15,888.90 $11,455,107.77 0/0 Change N/A 5.10% 0.15% 5.25% Outside Resources: Brinkley Sargent Architects and FT Woods Construction Background Information: On February 22, 2007 the City Council approved resolution number R -07-02-22-8C2 to enter into a Standard Form of Agreement with FT Woods Construction for construction of new Police Facility at 3001 Tellabs Dr. Public Comment: N/A Blue Sheet Format Updated 01/20/04 ROUND ROCK POLICE FACILITY CONSTRUCTION CHANGE ORDER Project: Round Rock Police Facility Address: 3001 Tellabs Drive Round Rock, Texas To: FT Woods Construction 1966 South Austin Avenue Georgetown, Texas 78626 (Contractor) The Contract is changed as follows: #187 Cross connect data closet #188 Replace smoke detector per Fire Inspection #189 Circuit braker failure due to storm #201 Battery powered egress lighting per fire inspection #202 Keyed light switches per fire inspection #203 Metal cap at courtyard existing beam #205 Re -circuit braker circuit per fire inspection #210 Provide drain for ice machine room #113 Change Order No.: 14 Initiation Date: 5/28/2008 Contract For: General Construction Contract Date: 2/22/2007 Add Add Add Add Add Add Add Add 2,254.21 2,455.30 2,272.92 3,396.37 2,879.17 1,019.17 1,072.68 539.08 The original Contract Sum was: Summary Net change by previous authorized Change Orders. The Contract Sum prior to this Change Order was: The Contract Sum will be increased by this Change Order The new Contract Sum including this Change Order will be. The Contract time will be unchanged The Date of Substantial Completion as of the date of this Change Order therefore is: Brinkley Sargent Architect 5000 Quota-D'rw$; Suite 600 Address OaIlas, Texas 75254 • Gamy f .eetnan ot FT Woods Construction City of Round Rock Contractor 1966 South Austin Avenue Address Owner $ 10,884,000.00 $ 555,218.87 $ 11,439,218.87 $ 15,888.90 $ 11,455,107.77 4/11/08 221 East Main Street Address Georgetown, Texas 78626 Round Rock, Texas 78664 By S.C. Inman, IV James R. Nuse, P.E Date Date ci/210b U-0_4)5 Date