Final As -Built Quantities
CO 0 N N
I-- O O) O)
0 6 ..(]
N 69 V' V
r
O ( C)
CO 69 CA
Tt
69
ORIGINAL CONTRACT PRICE:
PREVIOUS CHANGE ORDERS:
THIS CHANGE ORDER:
CHANGE ORDERS TO DATE:
CHANGE DATA
AMOUNT
F- W
z
C7
F
z
D
O0
i
111111
111111111111
DESCRIPTION OF CHANGES
2
w
r
% OF ORIG. CONTRACT PRICE
THIS CHANGE ORDER
O
ENGINEER
PREV. CHANGE ORDE
TOTAL % CHANGE:
NAME OF CONTRACTOR
m
w
co
r—
(/) u7
_
0-
W
U_
CL 0 cc,
N
W
0
0 0
00
0
Oz
O0
2
o \�
-J
L11 LLI
C
<Q W
Z2
O Q
(nz
1-
z
APPROVED:
constco2/forms6/Ik
ROUND ROCK
O
1-
0
DATE: July 22, 2008
SUBJECT: City Manager Approval — July 25, 2008
ITEM: Consider executing Change Order No. 1 with McLean Construction Co.,
Inc. for the Kensington Park 16 -inch Waterline Improvements Project.
Department:
Staff Person:
Water and Wastewater Utilities
Michael Thane, P.E., Director of Utilities
Justification:
Change Order No. 1 includes the final adjustments in the bid quantities. The quantity
adjustments were for small deductions to two line items. These items were a reduction in
the flowable back -fill amount and the stabilized construction entrance.
Funding:
Cost: ($3,145.92)
Source of funds: Capital Project Funds (Self -Financed Utility)
Amount %Change
Original Contract $480,724.78 N/A
Previous Change Orders $0 0%
Change Order No. 1 ($3,145.92) (0.65%)
Revised Contract $477,578.86 (0.65%)
Outside Resources: McLean Construction Co., Inc.
S.D. Kallman, L.P
Background Information:
The Kensington Park 16 -inch waterline project loop feeds water from the South 81
Elevated Storage Tank site to where it ties into an existing 16 -inch water main running
parallel to Gattis School Road at the intersection of Gattis School Road and Greenlawn
Boulevard. This new line facilitates distribution of ground water from the Lake Creek
pump station site further into the water distribution system.
Public Comment: N/A