CM-08-08-223CITY OF ROUND ROCK
CONSTRUCTION CHANGE ORDER
PAGE 1 OF 1
DEPARTMENT: Utility Administration DATE: 7/29/2008
PROJECT: 2005-06 Wastewater Collection System Rehab Basins CHANGE ORDER NO: 3
BC22-Z, CC32-Z,OC30-Z, EW01-Z, LCI1,LCI2.LC14,LC16-Z JUSTIFICATION:
ORIGINAL CONTRACT PRICE:
PREVIOUS CHANGE ORDERS:
THIS CHANGE ORDER:
CHANGE ORDERS TO DATE:
S2,112,690.00
$17,808.00
(578,807.50)
(560,999.50)
CHANGE DATA
ITEM#
DESCRIPTION OF CHANGES
8" Dia PVC Sewer Open Cut 0'-6'
CHANGE
ORDER QTY
138
UNIT
LF
NEW
TOTAL
QTY
1535
UNIT PRICE
$65.00
AMOUNT
$8,970.00
8" PVC Sewer Open Cut 6' - 12"
100
LF
265
$67.00
$6,700.00
8" PVC SDR -26 Pressure Pipe 0'-6' deep
176
LF
1,001.00
$60.00
$10,560.00
8" Dia. HDPE DR -17 Sewer Pipe by enlargement
445
LF
1,753.00
$65.00
$28,925.00
Rock Excavation
1192
CY
1,392.00
$50.00
$59,600.00
Apply Epoxy
22.59
VF
435.59
$250.00
$5,647.50
12" PVC SDR -26 Pressure Pipe 0'-6' deep
775
LF
1,635.00
$120.00
$93,000.00
12" Dia. HDPE DR -17 Sewer Pipe by directional drilling
-600
LF
0.00
$180.00
($108,000.00)
Job #1020
-1
LS
0.00
$4,500.00
($4,500.00)
6" Dia. CIPP Sewer Liner
-1250
LF
0.00
$45.00
($56,250.00)
8" Dia. CIPP Sewer Liner
-10
LF
140.00
$45.00
($450.00)
24" Dia CIPP Sewer Liner
-2
LF
288.00
$160.00
($320.00)
6" PVC Service Re -Connects after CIPP (external)
-5
EA
17.00
$1,500.00
($7,500.00)
Remove & replace 48" Dia MH 0-6' Deep
-2
EA
1.00
$7,500.00
($15,000.00)
Point Repair Prior to CIPP
-2
EA
0.00
$7,500.00
($15,000.00)
6" PVC Sewer Service Lines with CIO
-12
EA
28.00
$1,500.00
($18,000.00)
6" PVC Sewer Service Line Extension
-250
LF
0.00
$80.00
($20,000.00)
Fence Repair
-84
LF
16.00
$35.00
($2,940.00)
Point Repair Prior to Pipe Enlargement or CIPP
-1
EA
0.00
$5,500.00
($5,500.00)
Paved Frame & Grade Adjustments
-40
EA
5.00
$900.00
($36,000.00)
Install Bolts and Gaskets - bolt down cover
-22
EA
3.00
$125.00
($2,750.00)
4 / /--
($78,807.50)
PREPARED BY:
,8/21/2008
TE
s
SIGNATURE:
PRINT NAME/TI
andall ": -ar" C
President
APPROVED:
CITY OF ROUND ROCK
-�1-0�-O`b�22�
% OF ORIG. CONTRACT PRICE
THIS CHANGE ORDER: -3.73%
PREV. CHANGE ORDERS: 0.84%
TOTAL % CHANGE: -2.89%
ORIG. CONTRACT PRICE PLUS
CHANGE ORDERS: 52,051,690.50
constco2/forms6/Ik
CITY OF ROUND ROCK
CONSTRUCTION CHANGE ORDER
PAGE 2 OF 2
DEPARTMENT: Public Works DATE: 7/29/2008
PROJE CHANGE ORDER NO: 2
ITEM #
DESCRIPTION OF
CHANGES
CHANGE DATA
UNIT
UNIT QTY. PRICE
AMOUNT
ADDED DAYS
(CALENDAR)
12" PVC SDR -26 Pressure Pipe 0'-6' deep
775
LF
$120.00
$93,000.00
45
Rock Excavation
1192
CY
$50.00
$59,600.00
45
TOTAL:
90
BID ITEM
DESCRIPTION/ LOCATION
Qty
Extension infront of Fire Station
CIPP 3005
12" 620 High School
Bore Pit 2
Onion Creek- lowering
620
BC22Z-064 = 4.67
BC22Z-062 = 5.0
BC22Z-061 = 5.42
BC22Z-051A = 4.0
BC22Z-051B = 3.5
72
580
90
450
DATE:
SUBJECT:
ITEM:
August 27, 2008
City Manager Approval — August 29, 2008
Action authorizing the City Manager to execute Change Order No. 3 with Enviro
Remediation Coatings Services, Inc. for the 2005-2006 Wastewater Collection
System Rehabilitation Project.
Department: Water and Wastewater Utilities
Staff Person: Michael D. Thane, P.E., Director of Utilities
Justification:
The City is required to inspect, repair, and certify the wastewater collection system in
compliance with the Texas Commission on Environmental Quality's Edwards Aquifer Recharge
Zone Protection Program. This change order adjusts final contract quantities and contract time
for all work performed under this contract. Contract time is being increased by 90 days to
account for delays caused by increased rock excavation, and changing the method of 12 -inch
pipe installation from directional drilling to open cut.
Funding:
Cost:
Source of funds:
($78,807.50)
WW Utility Fund (F260
Outside Resources: RJN Group, Inc. (Engineering Consultant)
Background Information:
This project rehabilitates the defective wastewater collection system, which was identified in the 2005-
2006 Wastewater Collection System Inspection Project, in three Edwards Aquifer Basins (CC -32Z, OC -
30Z, and BC -22Z). The elimination of defects helps protect the aquifer and reduces inflow and
infiltration entering the sewer system, thereby reducing the City's treatment cost. The scope of the
project includes cured -in-place pipe, liner patches, point repairs, pipe bursting, boring, conventional pipe
replacement, internal joint grouting, and manhole rehabilitation and replacement.
Public Comment: N/A
Blue Sheet Format
Updated 01/20/04
Amount
% Change
Original Contract
$ 2,112,690.00
N/A
Previous Change Orders
$ 17,808.00
0.84%
Change Order No. 3
$ -78,807.50
-3.73%
Revised Contract
$ 2,051,690.50
-2.89%
Outside Resources: RJN Group, Inc. (Engineering Consultant)
Background Information:
This project rehabilitates the defective wastewater collection system, which was identified in the 2005-
2006 Wastewater Collection System Inspection Project, in three Edwards Aquifer Basins (CC -32Z, OC -
30Z, and BC -22Z). The elimination of defects helps protect the aquifer and reduces inflow and
infiltration entering the sewer system, thereby reducing the City's treatment cost. The scope of the
project includes cured -in-place pipe, liner patches, point repairs, pipe bursting, boring, conventional pipe
replacement, internal joint grouting, and manhole rehabilitation and replacement.
Public Comment: N/A
Blue Sheet Format