CM-08-09-231DATE: September 12, 2008
SUBJECT: City Manager Approval — September 19, 2008
ITEM: Consider executing a Storm Water Pollution Prevention Plan (SWPPP) for the RM
1431 Elevated Water Storage Tank project.
Department:
Staff Person:
Justification:
Water and Wastewater Utilities
Michael D. Thane, Director of Utilities
This Storm Water Prevention Pollution Plan (SWPPP) has been prepared for the proposed
construction of the RM 1431-2.0 MG Elevated Water Storage Tank project. This plan includes
the elements necessary for compliance with the Texas general permit for construction activities
(Permit No. TXR 150000) administered by the Texas Commission on Environmental Quality
(TCEQ) under the Texas Pollutant Discharge Elimination System (TPDES) Program.
Funding:
Cost:
N/A
Outside Resources: Landmark Structures I, LP
Brock Environmental Services, LLC
Background Information:
The purpose of this SWPPP is to provide guidelines for preventing or minimizing soil and
pollutants that originate on the construction site from water flowing into surface water bodies
during the construction period. This permit covers projects with a combined exposed area of
Tess than 5 acres, which are classified as a "Small Construction Activity" per part 11 of the TPDES
General Permit No. TXR150000, as a result a Notice of Intent is not required.
Public Comment: N/A
Blue Sheet Format
Updated 01/20/04
Storm Water Pollution Prevention Plan
Secondary / Primary Operator Certification Form
Site Description:
As identified on the Storm Water Pollution Prevention Plan (SWPPP).
Project Name: RM 1431-2.0 MG Elevated Water Storage Tank
Project Location: On the South Side of FM 1431 Approx. 0.9 miles east of its Intersection with
Sam Bass Road, Round Rock, Texas 78681
A duly authorized representative of the Owner and a duly authorized representative of the Contractor must
be identified and sign the following certification statement. (Separate documents maybe signed if desired).
Persons signing this certification must do so in compliance with the signatory requirements of the
permit as found at CFR 122.22 as follows:
For a corporation: by a responsible corporate office. For the purpose of this section, a responsible
corporate officer means: a president, secretary, treasurer, or vice-president of the corporation in
charge of a principal business function or any other person who performs similar policy or decision
making functions for the corporation; or the manger of one or more manufacturing, production or
operating facilities employing more than 250 persons or having gross annual sales or expenditures
exceeding $25,000,000 (in second quarter 1980 dollars) if authority to sign documents has been
assigned or delegated to the manager in accordance with corporate procedures.
For a partnership or sole proprietorship: by a general partner or the proprietor, respectively.
For the municipality, State, Federal or other public agency: by either a principal executive officer or
ranking elected official. For purposes of this section, a principal executive officer of a federal agency
includes (1) the chief executive officer of the agency, or (2) a senior executive officer having
responsibility for the overall operations of a principal geographic unit of the agency (e.g. Regional
Administrators of EPA).
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designated to assure that qualified personnel properly gathered and evaluate
the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons
directly responsible forgathering the information, the information submitted is, to the best of my knowledge and belief,
true, accurate, and complete. / am aware there are specific penalties for submitting false information, including the
possibilities of fine and imprisonment for knowing violations."
Secondary Operator: CITY OF ROUND ROCK h q(By: . Title: &'1If /`lb (r Date: `" I � ,
CE. P inted Name: �k in C I (ASC) (Li .
Primary Oper r yNDMARK STRUCTURES I, LP
By:
Title: `,f t . Date: 8/ 3 / / •
Printed Name: G t 5 L
This certification is to be kept on file with the SWPPP for this project.
Do not send to the TCEQ
ROUND ROCK, TEXAS
PURPOSE. PASSION. PROSPERITY.
September 19, 2008
Mayor
Alan McGraw
Mayor Pro -tem
Joe Clifford
Councilmembers
Rufus Honeycutt
Carlos T. Salinas
Scott Rhode
Kris Whitfield
George White
City Manager
James R. Nuse, P.E.
City Attorney
Stephan L. Sheets
"Executive Director"
TCEQ
Storm Water and General Permits Team: MC -148
P.O. Box 13087
Austin, TX 78711-3087
Dear Executive Director,
This letter serves to designate a Company who will have day-to-day operational
controls of those activities at a construction site which are necessary to ensure
compliance with the storm water pollution prevention plan that has been
developed for this site.
Name: Landmark Structures I, LP
Title: Primary Operator / Daily Operational Controls
Project Name: RM 1431-2.0 MG Elevated Water Storage Tank
Project Location: On the South Side of FM 1431 Approx. 0.9 miles east of its
Intersection with Sam Bass Road, Round Rock Texas 78681
By signing this authorization, I confirm that I meet the following requirements to
make such a designation as set forth in the Texas Administrative Code Title 30
Part 1 Chapter 305 Subchapter C Rule 305.44 and Title 30 Part 1 Chapter 305
Subchapter F Rule 305.128.
"I certify under penalty of law that this document and all attachments were
prepared under my direction or supervision in accordance with a system
designated to assure that qualified personnel properly gathered and evaluated
the information submitted. Based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief,
true, accurate, and complete. I am aware there are specific penalties for
submitting false information, including the possibilities of fine and imprisonment
for knowing Kio/ations. "
Signature:
Printed Nam
Secondary Operator: CITY OF ROUND ROCK
Date:
e. h�u Sp F: t . Title: 0 »t1
CP\-eV-bcl,Zsi
CITY OF ROUND ROCK WATER AND WASTEWATER UTILITIES DEPT., 212 Commerce Blvd. • Round Rock, Texas 78664
Phone 512.671.2755 • Fax 512.218.3242 • www.roundrocktexas.gov
MN=
mom
AMR
SMALL CONSTRUCTION SITE NOTICE
FOR THE
Texas Commission on Environmental Quality (TCEQ)
Storm Water Program
TPDES GENERAL PERMIT TXR150000
The following information is posted in compliance with Part II.E.2. of the TCEQ General Permit Number
TXR150000 for discharges of storm water runoff from small construction sites. Additional information
regarding the TCEQ storm water permit program may be found on the interne at:
http://www.tceq.state.tx.us/nav/permits/wq construction.html
For Small Construction Activities Authorized Under Part II.E.2. (Obtaining Authorization to Discharge) the
following certification must be completed:
I (Typed or Printed Name Person Completing This Certification) certify under
penalty of law that I have read and understand the eligibility requirements for claiming an authorization under Part II.D.2. of
TPDES General Permit TXR150000 and agree to comply with the terms of this permit. A storm water pollution prevention plan
has been developed and will be implemented prior to construction, according to permit requirements. A copy of this signed
notice is supplied to the operator of the MS4 if discharges enter an MS4. I am aware there are significant penalties for providing
false information or for conducting unauthorized discharges, including the possibility of fine and imprisonment for knowing
violations.
Signature and Title
i/00-ikcjw
Date �� V
Date Notice Removed
MS4 operator notified per Part
Operator Name:
Landmark Structures I, LP
Contact Name and Phone Number:
Natalie Woods
cell # 817-600-1551 office # 817-439-8888
Project Description: Physical address or
description of the sites location, estimated start date
and projected end date, or date that disturbed soils
will be stabilized
Construction For:
RM 1431-2.0 Elevated Water Storage Tank
On the South Side of FM 1431 Approx. 0.9 miles east of its
Intersection with Sam Bass Road
Round Rock, Texas 78664
Construction Period:
Start Date: August 25, 2008
End Date: March 10, 2010
Location of Storm Water Pollution Prevention Plan:
On Site With Project Manager
For Small Construction Activities Authorized Under Part II.E.2. (Obtaining Authorization to Discharge) the
following certification must be completed:
I (Typed or Printed Name Person Completing This Certification) certify under
penalty of law that I have read and understand the eligibility requirements for claiming an authorization under Part II.D.2. of
TPDES General Permit TXR150000 and agree to comply with the terms of this permit. A storm water pollution prevention plan
has been developed and will be implemented prior to construction, according to permit requirements. A copy of this signed
notice is supplied to the operator of the MS4 if discharges enter an MS4. I am aware there are significant penalties for providing
false information or for conducting unauthorized discharges, including the possibility of fine and imprisonment for knowing
violations.
Signature and Title
i/00-ikcjw
Date �� V
Date Notice Removed
MS4 operator notified per Part