Cm-08-09-236CITY MANAGER BLUE SHEET DATE: September 15, 2008 SUBJECT: City Manager - September 19, 2008 ITEM: Consider executing a grant project worksheet with Capital Area Council of Governments (CAPCOG) for the purchase of a Shelter System. Department: Police Department Staff Person: Rick White/Sherrill Voll Justification: A logistical analysis of strike team needs has identified their essential, critical equipment requirements. One of these needs is a compact, mobile, and quickly deployable shelter system designed to support the myriad functions and personnel - protection requirements of any operational responses in the CBRNE environment. Funding: Cost: Certain costs may be incurred beyond the initial capital investment period for extended warranty coverage on equipment. These costs may be covered by future Homeland Security Grant Program (HSGP) grants, but we are not certain of that at this time. Source of funds: General Funds Background Information: The National Preparedness Directorate (NPD) is a component of the Federal Emergency Management Agency (FEMA) that was established on April 1, 2007, as a result of the Post -Katrina Emergency Management Reform Act of 2006 to oversee coordination and development strategies necessary to prepare for all - hazards. The NPD provides strategy, policy, and planning guidance to build prevention, protection and recovery capabilities. Updated 3-10-05 GRANT APPLICATION/PROPOSAL REVIEW (GAPR) This form must be completed and presented to Department Leadership for review prior to: a) the submission of a grant application; b) the renewal of a grant; or, c) a change in the budgeted amount of the grant Following review by Departmental Leadership, this form should be submitted to the City Budget Supervisor (218-5445) for Budget Office Approval. The GAPR form is due to the Budget Office for approval at least five (5) working days prior to the City Council agenda deadline. All grant applications require City Council approval to before submission, this form should be completed by the department and submitted with the Council Action requesting approval to apply and the "Request for Finance Approval" form. Once a grant is awarded, a copy of this GAPR along with the Grant Application notification form should be submitted with the Council Action re- questing authorization to accept the grant and the "Request for Finance Approval" form. NOTE: NO GRANT APPLICATION, RENEWAL, OR INCREASE IN GRANT FUNDING WILL BE CONSIDERED WITHOUT THE SUBMISSION AND APPROVAL OF THIS FORM. Grantor Federal Emergency Management Agency National Preparedness Directorate Grant Title: Homeland Security Grant Program (HSGP) Grant Amount Grant FTEs: Grant Match: $115,822.00 n/a (This is a non-matching grant.) PROGRAM BUDGET Fiscal Year FY: 07;08_ 08-09 FY: 09-10 TOTAL Grant Funding 0.00 $115,822.00 0.00 0.00 $115,822.00 Required City Match 0.00 0.00 0.00 0.00 0.00 TOTAL 0.00 $115,822.00 0.00 0.00 $115,822.00 Please complete the sentences listed below by filling out the boxes: This is the (list _year): 1st year of a (list year) as many as three-year Grant: This Grant will be appropriated in FY: 2008/2009 Page 1 Other In -Kind Match Provided:$0.00 (This is a non-matching grant) Total Program Budget: $115,822.00 Proposed Positions (FTE's) to be Funded: [Indicate Title(s) and Status (regularltemporary). Please add rows If number is insuf- ficient.] Should we subcontract? If so, why? n/a This grant proposal/application is a: X New Grant Renewal Grant Revision Type of Funds: _Federal X Federal Pass -Through _ State _ Private/Other Funding Source: NOTE — THIS IS A REIMBURSEMENT GRANT GRANT TERM DATES TERM YEAR TITLE STATUS (Reg./Temp.)> Estimated Cost . n/a n/a n/a 2.. Through Year Three: 3 '- -TOTAL:: Year Four: Through -TOTAL: . Na Should we subcontract? If so, why? n/a This grant proposal/application is a: X New Grant Renewal Grant Revision Type of Funds: _Federal X Federal Pass -Through _ State _ Private/Other Funding Source: NOTE — THIS IS A REIMBURSEMENT GRANT GRANT TERM DATES TERM YEAR MONTH/DAY/YEAR THROUGH MONTH/DAY/YEAR Year One: The grant term typically begins from the formal acceptance of the grant to two or three year periods following acceptance. We anticipate acceptance would come in October 2008. Through Year Two: Through Year Three: Through Year Four: Through Year Five: Through Collaborations with other Agencies/Departments: This grant project is a collaboration with CAPCOG agencies that are members of the four CAPCOG Homeland Security Task Force CBRNE Strike Teams. The assets purchased through this grant primarily will be used to benefit law- enforcement agencies that are strike team members, as well as be available to assist other strike team elements and City, county, and regional needs as appro- priate for Command and Control, Intelligence, and Rehabilitation during critical incidents. List the Departmental Goal or Strategy that will be supported by this grant (as included in the Ap- proved Budget Document): This grant would support the Police Department's Strategic Goal 2, Plan For And Adapt To Change; Objective B, Actively plan the Department's response to major incidents. Page 2 PLANNED PERFORMANCE MEASURES (List Major Three)): 1. Oversee development and manufacturing phases of system. 2. Acquire completed system, train personnel for proper operation, and house and maintain system in good working order. 3. Deploy system in the field in actual and planned events, in keeping with the standards of CAPCOG HSTF Regional CBRNE Strike Team deployment, applicable mutual aid agreement, or as determinded between requesting and responding parties at the time of deployment. Brief description of proposed grant program: The City of Round Rock Police Department is one of the principal agencies responsible for the development of the law-enforcement components of our CAPCOG Homeland Security Task Force Regional CBRNE Strike Teams. CBRNE is an acronym for Chemical, Biological, Radiological/Nuclear and Explosive incidents that require a response by emergency providers. A logistical analysis of strike team needs has identified their essential, critical equipment requirements. One of these needs is a compact, mobile, and quickly deployable shelter system designed to support the myriad functions and personnel -protection requirements of any operational responses in the CBRNE environment. The four strike teams, which were formally developed in 2001/2002, are at a critical juncture with respect to law-enforcement response. The shelter system will meet strike team sheltering needs and enhance their capability to sustain field operations by delivering to the field a quickly deployable, low-maintainance, insulated, climate -controlled, heavy-duty sheltering system. The system will include an inflatable shelter; custom, 16 -foot trailer, electrical generator, HVAC, interior and exterior lighting, and other necessary operational equipment. The heavy-duty shelter, with rigid door system (normal door operation instead of zippers), will provide 454 square feet of usable floor space and 8 feet of headroom. The generator will provide for the shelter's electrical requirements, as well as the electrical requirements of future growth of the shelter's footprint and other related electrical needs. Depending on specific need at the time, the shelter system can be utilized to meet the critical roles of command -and -control, intelligence or rehabilitation functions. With four wide "connector doors," it will allow for compatible interface with additional shelter components from within the region or around the state (There are currently over 200 compatible shelters in Texas, of which 50 are located in San Antonio with the San Antonio Fire Department and Southwest Texas Regional Advisdory Council.) The quickly deployable, climate -controlled shelter is an absolute necessity to support and sustain our CBRNE responders in the field. Funding for this basic requirement will be a first step in providing the necessary flexibility in accomodating the team's physical and mental well-being and complies with goals set forth by the U.S. Department of Homeland Security's National Preparedness Plan. Page 3 Contingency Plan If Grant Funding Discontinued (Check Appropriate Box, or Detail in "Other."): A. If this grant project's goals and objectives are reached, the Department will request funding from the General Fund to continue the program if grant funding ends. B This grant -funded project is considered a baseline program that must be continued with or without grant funding. C This grant -funded project is not considered a baseline program that must be continued with or without grant funding. D. This one-time grant -funded project intended to cease at the grant -term end. No other funding will be requested from alternative grant sources or General Fund dollars E If this grant -funded project's performance (for in the example of a pilot or demonstration grant) indicates the need for the Department to apply for follow-up grant funding, the project may require supplemental funding from the General Fund to cover the cost of the follow-up project. F. X OTHER: This grant would fund the initial capital investment necessary to bring the assets to the City. However, it should be understood that this will be a continuing project that will incur costs beyond the initial capital investment period. Certain pieces of equipment — e.g., generator and HVAC — will have extended warranty coverage, and we will make the effort to acquire future warranty coverage for these items, through HSGP grants (this has been done for other CBRNE response equipment in the past). Under the terms of the grant, should Round Rock Police Department determine, at some future point, that it no longer wants to house and maintain the sys- tem, the system will be placed with another CAPCOG HSTF CBRNE Strike Team jurisdiction. DEPARTMENTAL REVIEW/APPROVAL (To be completed by the s , ittinng� Department) Dept. Director Review/Approval: `e - Date: Date Application Due (if Applicable): Date Forwarded: CITY BUDGET OFFICE REVIEW APPROVAL (To be completed by the City Budget Office) Date Received: Date Approved/Disapproved: Budget/Accounting Supervisor Review/Approval: Date: Finance Director Review/Approval: Date: GRANT AWARD NOTIFICATION FORM Page 4 Instructions Capital Area Council of Governments Grant Project Worksheet—FY 2008 Participating iurisdiction(s) and Point of Contact Enter the names of the jurisdictions that will participate in this project. Enter name of the Point of Contact, or person completing the worksheet, and appropriate contact information. 1. Needs to be addressed by this project Explain the benefit(s) to be gained by this project. Be concise but comprehensive. This should justify the expenditure of funds 2. Proiect Description Describe the scope of this project. Relate project activities to the identified needs - outline the expected achievements or mitigation if implemented, and/or potential negative impacts that will occur if the project is not implemented. For Citizen Corps, strike team, etc., please indicate the number of members 3. New or Existing Proiect and Notes Please identify whether this is a new or existing project, and if the project is intended to address an emergency need. If new, a brief summary of the entire program should be provided in the Notes field. Why and how the project is an emergency should also be explained in the Notes field, if applicable. 4. Regional Impact Describe the benefit to the region as a result of this project. Does it facilitate regional response, interoperable communications, enhance mutual aid capabilities, bring jurisdictions to similar equipment standards, etc.? 5. Local Investment Grantees are not required to provide cash or in-kind match for FY 2008. However, there is potential for future programs to be impacted by cash -match requirements as early as FY 2009. Please provide a brief summary of any or all opportunities to leverage local operating funds or other sources of funding or support to the project. 6. Proiect Scalability and Notes Please identify whether this is a one-time project, or may be part of a phased project. If applicable, a brief summary of other phases of the project should be provided in the Notes field. 7. Budget Enter proposed budget info to the extent that it is available. Be conservative in your estimates but do not overstate anticipated costs. Select the expenditure category from the drop-down list (The default is "Equipment. '9. The totals for each line and for the project are calculated. When all costs have been entered, right -click on the $ field (bottom right) and select "Update Field" to calculate the totals 8. Disciplines Involved in the Proiect Allocate the total budget across any and all disciplines that will be involved in the project, i.e., law enforcement, EMS, general government, etc. When all costs have been entered, right -click on the $ field (bottom right) and select "Update Field" to total the costs. 9. Distribution Applies only to multi jurisdiction projects Enter estimated costs allocated to each jurisdiction in the fields provided. If more than five jurisdictions are participating, attach an additional sheet containing the detailed distribution and use the table to summarize. When all costs have been entered, right -click on the $ field (bottom right) and select "Update Field" to total the costs. Signatures Signature of the authorizing chief official is required before the project can be approved for funding. A project worksheet may be submitted while the signature is being obtained. The project manager and the contact for the project worksheet may be the same individual. Project worksheet form 2008 final.doc -1 - June 16, 2008 Capital Area Council of Governments Grant Project Worksheet FY 2008 NOTE: This worksheet is saved and protected as a form; areas are navigated by tabbing from one text field to the next. To tab back to a previous field, press Shift + Tab. The boxes for text fields will expand if necessary as you type. Participating 7urisdiction(s): Point of Contact: Title: Phone: Email: City of Round Rock Brad Bradford EMC Direct: 512-341-3106 Cell: 512-844-7732 bbradford@round-rock.tx.us 1. Needs to be addressed by this project (Why is this project needed?): The City of Round Rock Police Department is one of the principal agencies responsible for the development of the law-enforcement component of the HS ii- Regional CBRNE Strike Teams. The logistical analysis has identified the essential, critical equipment requirements of the team; one of which is a compact, mobile, and quickly deployable shelter designed to support the myriad functions and personnel -protection requirements of any operational responses in the CBRNE environment. 2. Project Description (How will the needs be met?): The strike teams are at a critical juncture in the development of their law-enforcement response, and the project will meet their sheltering needs and enhance their capability to sustain field operations by delivering to the event a quickly deployable, low maintainance, insulated, climate -controlled, heavy-duty sheltering system. The system will include an inflatable shelter, custom 16 foot trailer, electrical generator, HVAC, interior and exterior lighting, and other necessary operational equipment. The heavy-duty shelter, with rigid door system (normal door operation instead of zippers), will provide 454 Sq Ft of Usable Floor Space and 8 Ft of Headroom. The generator will provide for the shelter's electrical requirements, as well as the electrical requirements of future growth of the shelter's footprint and other related electrical needs. Depending on specific need at the time, the shelter system can be utilized to meet the critical roles of Command & Control/Intelligence or Rehab. With four wide "connector doors", it will easily allow for interface of additional shelter components from within the region or around the state. (There are over 200 compatible shelters in Texas, with 50 of these located with the San Antonio Fire Department and STRAC.) The quickly deployable, climate -controlled shelter is an absolute necessity to support and sustain our CBRNE responders in the field. Funding for this basic requirement will be a first step in providing the necessary flexibility in accommodating the team's physical and mental wellbeing. The sheltering system complies with 11 goals of the Target Capabilities List, particularly 14, 15, 23, and 24. Project worksheet form 2008 finaldoc -2- June 16, 2008 3. New or Existing project?: ® New project ❑ Existing project (Describe how this is an enhancement, expansion, addition, etc. of an existing project in "Notes" field.) ❑ Emergency (Describe circumstances in"Notes" field.) Notes: The project will provide the necessary sheltering for the strike team's law-enforcement element when operating within or beyond our region, as well as independent of the strike team when necessary. Providing a climate -controlled atmosphere for Command & Control/Intelligence and Rehab operations, it will enable law-enforcement personnel to remain effective in the field for a longer period of time. 4. Regional Impact (Identify the investment strategies addressed by the project. How does this project enhance regional preparedness?): The project will provide the necessary sheltering for law-enforcement when operating as an element of the CAPCOG HSTF Regional CBRNE Strike Team deployment within or beyond the region. It will allow law- enforcement to remain effective in the field for a longer period of time. Project worksheet form 2008 final.doc 3 - June 16, 2008 5. Local Investment (Explain the effort related to the project, including integration or enhancement of current services, project management eta): The City of Round Rock Police Department will house and maintain the asset, when not in use, and will provide a prime mover and necessary personnel to deploy the asset in the field in an actual or planned exercise event. Deployment will be in keeping with the terms of a CAPCOG HSTF Regional CBRNE Strike Team deployment, mutual aid agreement in existence at the time of deployment, or as determinded between the requesting and responding parties at the time. 6. Project Scalability (Explain whether this project is being done as a single component or in phases) ® One-time project ❑ Phased project (Describe previous funding in "Notes" field.) Notes: The project will provide a complete operational asset, in and of itself; however, future expansion of its footprint can provide increased benefits to the strike teams. As noted in "Project Description", the shelter's four wide "connector doors" allow for easy future interface of additional shelter components. 7. Budget (Include as much detail as possible): The expenditure categories are Equipment, Planning, Organization, Training, and Exercises. These may be chosen from the drop-down list (the default is "Equipment.'3 Management and Administration (M&A) Limits- a maximum of up to 3% of project funds requested may be retained and used solely for the management and administration purposes associated with the grant Category Item Unit cost Total Shelter System Equipment 1 46,212 $46,212.00 HVAC System Equipment 1 7,300 $7,300.00 Electrical System Equipment 1 31,700 $31,700.00 Transport System Equipment 1 17,500 517,500.00 External Area Lighting Equipment 1 9,160 $9,160.00 C&C Misc. Equipment 1 2,000 $2,000.00 S&H ' Equipment 1 1,950 $1,950.00 Equipment $ 0.00 Equipment $ 0.00 Equipment $ 0.00 Equipment $ 0.00 Equipment $ 0.00 M&A (if applicable, not to exceed 3%) $ 0.00 Total (Right dick $ field. Select "Update Field/9 Project worksheet form 2008 fina/.doc - 4 - $115,822.00 June 16, 2008 8. Disciplines Involved in the Proiect (Please indicate the percentage of funds expected to be allocated in each discipline. Use all disciplines that apply): Discipline Percentage of Project $ Agriculture 0.00% Law Enforcement 100.00% Emergency Medical Services - Non -Fire Based 0.00% Emergency Medical Services - Fire Based 0.00% Fire Service 0.00% Hazardous Materials 0.00% Public Works 0.00% Public Safety Communications 0.00% Health Care 0.00% Emergency Management Agency 0.00% Public Health 0.00% Governmental Administrative 0.00% Cyber Security 0.00% Not for Profit/Non-Profit 0.00% Regional Transit System 0.00% 9. Distribution (For multi jurisdiction projects only): Jurisdiction Estimated cost n/a $0 $0 $0 $0 Total (Right dick $ field, Select "Update Field? $ 0.00 Signature of Authorizing Chief Official This signature certifies that the requestor understands the requirements, procedures, and deliverables coinciding with this request for funding and has the authority to represent the governing body of this jurisdiction. utharizing Chief Official Date m Nuse City Manager Printed Name Title Signature of Project Manager The following person is authorized to receive direction, manage work performed, complete and sign required reports, and otherwise act on behalf of the jurisdiction for this project. Proje anager C lkA '' 'C'(I'Z Project worksheet form 2008 frnaldoc -5- Date June 16, 2008 Grantor Federal Emergency Management Agency National Preparedness Directorate Grant Title: Homeland Security Grant Program Grant Amount:- Grant .` FTs: Grant Match: $115,822.00 n/a (This is a non-matching grant.) Department/Division: City of Round Rock Police Department Department Contact (Name, phone number): (this is the person who will be monitoring -the grant) Thomas Bradford Emergency Management 512-341-3106 PROGRAM BUDGET This grant approval is a: New Grant Renewal Grant Revision Type of Funds: _Federal X Federal Pass -Through _ State _ Private/Other Funding Source: NOTE: THIS IS A REIMBURSEMENT GRANT Attach a copy of grant award notification from Grantor. Page 5 New Program Worksheet General Fund Police Department # Division # 21000 21002 Program Shelter System Fiscal Year Implemented Priority # 2008-2009 Pr. ram Description & Justification attach additional pa !es if needed The City of Round Rock Police Department is one of the principal agencies responsible for the development of the law-enforcement components of our CAPCOG Homeland Security Task Force Regional CBRNE Strike Teams. CBRNE is an acronym for Chemical, Biological, Radiological/Nuclear and Explosive incidents that require a response by emergency providers. A logistical analysis of strike team needs has identified their essential, critical equipment requirements. One of these needs is a compact, mobile, and quickly deployable shelter system designed to support the myriad functions and personnel -protection requirements of any operational responses in the CBRNE environment. The four strike teams, which were formally developed in 2001/2002, are at a critical juncture with respect to law-enforcement response. The shelter system will meet strike team sheltering needs and enhance their capability to sustain field operations by delivering to the field a quickly deployable, low-maintainance, insulated, climate -controlled, heavy-duty sheltering system. The system will include an inflatable shelter; custom, 16 -foot trailer, electrical generator, HVAC, interior and exterior lighting, and other necessary operational equipment. The heavy-duty shelter, with rigid door system (normal door operation instead of zippers), will provide 454 square feet of usable floor space and 8 feet of headroom. The generator will provide for the shelter's electrical requirements, as well as the electrical requirements of future growth of the shelter's footprint and other related electrical needs. Depending on specific need at the time, the shelter system can be utilized to meet the critical roles of command -and -control, intelligence or rehabilitation functions. With four wide "connector doors," it will allow for compatible interface with additional shelter components from within the region or around the state (There are currently over 200 compatible shelters in Texas, of which 50 are located in San Antonio with the San Antonio Fire Department and Southwest Texas Regional Advisdory Council.) The quickly deployable, climate -controlled shelter is an absolute necessity to support and sustain our CBRNE responders in the field. Funding for this basic requirement will be a first step in providing the necessary flexibility in accomodating the team's physical and mental well-being and complies with goals set forth by the U.S. Department of Homeland Security's National Preparedness Plan. Please indicate if this a new program or if it will support an established program: XX New Program Additions/Changes to Existing Program Performance Measurements Explain how this new program will improve or benefit services internally, services provided to citizens or services to other departments: 1. Oversee development and manufacturing phases of system. 2. Acquire completed system, train personnel for proper operation, and house and maintain system in good working order. 3. Deploy system in the field in actual and planned events, in keeping with the standards of CAPCOG HSTF Regional CBRNE Strike Team deployment, applicable mutual aid agreement, or as determinded between requesting and responding parties at the time of deployment. dentify performance measurements that will show how this new program will provide an improvement or benefit to your department, or other departments. Indicate measurement WITH and WITHOUT the new program resources included. Proposed Without Performance Measurement Actual 2007 Est. 2008 New Program citizens Proposed With New Program Division Goals) Affected This grant would support the Police Department's Strategic Goal 2, Plan For And Adapt To Change; Objective B, Actively plan the Department's response to major incidents. Total FTEs 0.00 Total New Program Costs $ $115.000 New Program Worksheet General Fund 21000 Police Division # 21002 Program Shelter System Fiscal Year Implemented 2008-2009 Priority # 0 Acct. # Contractual Services Quantity / Description Amount 0 0 0 Total Contractual Services $ Acct. # Materials and Supplies Quantity / Description Amount 5328 R & M Equipment $ 0 $ 0 $ 0 $ 0 Total Materials and Supplies $ Other Expenses Acct. # Quantity / Description Amount 0 0 0 Total Other Expenses $ Acct. # Capital Outlay (Fill out Cap Otly Form) Quantity / Description Amount 6112 Equipment 115,000 0 0 0 0 $ 0 Total Capital Outlay 2008-2009 0 $ 2008-2009 0 $ 2008-2009 0 $ 2008-2009 115,000 $ YR 2 0 $ YR 2 750 $ YR 2 0 $ YR 2 0 $ YR 3 0 YR 3 750 YR 3 0 YR 3 0 PERSONNEL Pay Grade FTE Position Title Months Monthly Salary FTE 2008-2009 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 Subtotal FTES 0.00 0 Total Number of FTE Positions that will be filled by this Program (No. of Persons to be hired) YR 2 (12 mos) 0 0 0 0 0 0 0.00 YR 3 (12 mos) 0 0 0 0 0 0 Temp Position Title(s) Subtotal Temp Months Monthly Salary FTE 2008-2009 YR 2 (12 mos) YR 3 (12 mos) 0 0 0 0 0.00 0 0 0 0.00 0.00 0 0 Total Number of Temp Positions that will be filled by this Program (No. of Persons to be hired) Hours Hourly Rate Overtime 1 01 0 x 1.5 Elig. Pers No. of Weeks Standby 1 01 01x 30 FICA (Equals Total Salaries x 0.0765) Insurance (Equals No. of Mos. x $695) TMRS (Equals Total Salaries x 0.121) Workers' Comp. ( 0.008031X Total Salaries TWC (Unemployment) 0.00 Persons x $9000 x .015 TOTAL PERSONNEL COSTS 0 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total New Pro • ram Costs 115,000 750 750