CM-08-10-248CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Engineering & Development Services PROJECT: Gattis School Road Corridor Enhancements ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: ITEM # 1 2 3 DESCRIPTION OF CHANGES Add section of concrete fence at Magnolia Drive and Dixie Lane. Delete section of wooden fence at Magnolia Drive and Dixie Lane. Add one wooden mangate at Dixie Lane residence. PREPARED B)(,Z/'G ENGIN Fen e eel tAQ. 7rQI>t Ott, -1-1te. NAME OF CONTRACT SIGNATUR PRINT NAME/TITLE: Yuc(& lb (� 1 e r APPROVED: $207,271.75 $0.00 $3,821.50 $3,821.50 CHANGE DATA UNIT LE LF EA DATE TY OF ROUND ROCK QTY. 122 122 1 PAGE 1 OF 1 DATE: 10/10/08 CHANGE ORDER NO: 1 JUSTIFICATION: Change Order # 1 is needed to change the fencing material in one section of the fence and to add one mangate. UNIT PRICE $51.50 $25.75 $680.00 TOTAL: AMOUNT $6,283.00 ($3,141.50) $680.00 $3,821.50 ADDED DAYS CALENDAR/ WORKING 0 0 0 PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: PREVIOUS CHANGE ORDER TOTAL % CHANGE: ORIGINAL CONTRACT PRICE PLUS SNGE ORDERS: constco2/forms6/Ik 0 1.90% 0% 1.90% $211,193.25 DATE: October 6, 2008 SUBJECT: City Manager- October 10, 2008 ITEM: Consider executing Change Order No. 1 with Fencecrete America, Inc. for Gattis School Road Corridor Enhancement Project. Deoartm_ent• Engineering and Development Services Staff Peron• Danny Halden, P.E., City Engineer Justification: Change Order No. 1 is needed to change the fencing material from wood to concrete for two residences between Magnolia Drive and Dixie Lane and to add a mangate at Dixie Lane. FunFun Cost: $3,821.50 Source of funds: 2002 G.O. Bonds Original Contract Amount oho Change $207,27 Previous Change Orders .00 N/A 0 Change Order # 1 0.00 polo 3 21 Revised Contract $8Sn 1 1.9% $211,193.25 Oid utse Resources• Fencecrete America, Inc. FHI, Inc. Background Information The City Council approved the original construction contract, R -07-12-20-9F1, with Fencecrete America, Inc. for $207,271.75 on December 20, 2007. This project is part of a continuing program to aesthetically improve City street corridors. This fence will enhance the visual appearance of the Gattis School Road corridor by replacing existing privacy fences, typically made of wood, with permanent, more durable concrete fencing.Change Order No. 1 changes the fencing material from wood to concrete for two residences between Magnolia Drive and Dixie Lane and adds a mangate at the residence on Dixie Lane. The cost of this change order is $3,821.50 and would increase the total cost of the construction contract to $211,093.25. Public Comment• N/A Blue Sheet Format Updated 01/20/04