Loading...
CM-08-10-254STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: K. FRIESE & ASSOCIATES, INC. ("Engineer") ADDRESS: 1120 S. Capital of Texas Highway The Setting III, Suite 100 Austin, Texas 78746 PROJECT: Transmission Line Segment 2C for the Cedar Park/ Round Rock/ Leander/ Regional Water System Improvements This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the CITY OF ROUND ROCK, (hereinafter referred to as "Round Rock"), the CITY OF CEDAR PARK, (hereinafter referred to as "Cedar Park"), the CITY OF LEANDER, (hereinafter referred to as "Leander"), (all collectively referred to hereinafter as "Owners") and K. Friese & Associates, Inc., (hereinafter called the "Engineer"). WHEREAS, the Owners and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 21st day of December, 2006 for the Transmission Line Segment 2C for the Cedar Park / Round Rock / Leander Regional Water System Improvements Project in the amount of $191,919.00; and WHEREAS, the Owners and Engineer executed Supplemental Contract No. 1 on April 12, 2007 to modify the provisions for the scope of services, to increase the compensation by $627,561.00 to a total of $819,480.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services, to increase the compensation by $1,250.00 to a total of $820,730.00; and NOW THEREFORE, premises considered, the Owners and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit D, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit D. Supplemental Contract #2 Rev.10/2008 CORR Project #WAO5TRVRAW 84275 146847/0199.4622 CM-O--lo-W1- II. Article 4, Compensation and Exhibit E, Fee Schedule shall be amended by increasing by $1,250.00 the lump sum amount payable under the Contract for a total of $820,730.00, as shown by the attached Addendum to Exhibit E. IN WITNESS WHEREOF, the Owners and the Engineer have executed this Supplemental Contract. Supplemental Contract #2 Rev.10/2008 CORR Project #WAO5TRVRAW 84275 146847/0199.4622 2 CITY OF ROUND ROCK, TEXAS By: ATTEST: -ec 1 NI,Pc 1 Mm.VlA By: E;i(A4vu . kS202EA. Sara L. White, City Secretary APPROVED AS TO FORM: Stepha 't L. Sheets, City Attorney Supplemental Contract #2 Rev.10/2008 CORR Project #WAO5TRVRAW 84275 146847/0199.4622 3 CITY OF CEDAR PARK, TEXAS APPROVED AS TO FORM: �% By: Brenda (t-� Brenda Eivens, City Manager Charles Rowland, ity Y orn y Y ATTEST: By: 2;"7. LeAnn Quinn, City Secretary Supplemental Contract #2 CORR Project #WAO5TRVRAW 146847/0199.4622 U 4 --O -Cu ref 4 APP Rev.10/2008 84275 CITY OF LEANDER, TEXAS APPROVED AS TO FORM: By: Jan Cowman, Mayor ATTEST: By: )Ji)uL /J,iLL e ie Haile, City Secretary Diana Granger, Aiorney Supplemental Contract #2 Rev.10/2008 CORR Project #WAO5TRVRAW 84275 146847/0199.4622 5 CM -O (v. K. FRIESE & ASSOCIATES, INC. By: Karen I riese, P.E., President Supplemental Contract #2 Rev.10/2008 CORR Project #WAO5TRVRAW 84275 146847/0199.4622 6 ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: Reason for Chane When the scope of services for the Segment 2c Transmission Line was developed, it was K Friese & Associates, Inc.'s (KFA's) understanding that the flow control valve vault would be a standard design developed by the Segment 1 Design Engineer. Since this was to be a standard detail, KFA's scope did not include the structural engineering necessary to design the vault. Both projects are now at the 90% design stage or greater and it is apparent that a standard design for all flow control valve vaults is not appropriate. Each station is unique with different types of flow control valves being used (a motor operated ball valve for Segment 1 and a hydraulic diaphragm operated valve for Segment 2c), different size piping, and different valving arrangements. These mechanical differences result in different size vaults which require different structural designs. Scope of Services 1. Analyze and design the below -grade concrete valve vault. Walls will be designed as cast -in-place concrete to resist external lateral earth and hydrostatic pressure and appropriate surcharge loading. The top slab will be designed to support an H2O wheel load. 2. Analyze and design a grade supported equipment pad. 3. Prepare structural drawings, including plan, section, details and schedules necessary for construction of the concrete valve vault and equipment pad. 4. Prepare construction specifications, in the form of notes on the drawings, for concrete valve vault and equipment pad. Design assumptions and material properties will be documented on the drawings. The City of Austin Standard Specifications will be referenced. 5. Respond to questions from Contractors during the bid phase. ADDENDUM TO EXHIBIT D Work Schedule The changes to the Work Schedule for this project are as follows: None ADDENDUM TO EXHIBIT E Fee Schedule The changes to the fee schedule for this project are as follows: Increase $1,250.00 for Structural Engineering Services. DATE: October 15, 2008 SUBJECT: City Manager Approval — October 24, 2008 ITEM: Department: Staff Person: Justification: Consider executing Supplemental Agreement No. 2 with K. Friese & Associates, Inc. regarding the Water Transmission Line, Segment 2C for the Cedar Park/Round Rock/Leander Regional Water System Project. Water and Wastewater Utilities Michael D. Thane, Director of Utilities Supplemental Agreement No. 2 is for additional design services for Treated Water Line, Segment 2C of the regional water project. These services include additional structural design of a Targe concrete vault to house Leander's flow control valve at Ronald Reagan Boulevard and New Hope Road. The additional cost is $1,250.00, with Round Rock's allocated cost being 51.78%; Cedar Park, 0%; and Leander, 48.22%. Funding: Cost: Source of funds: Outside Resources: $1,250.00 Capital Project Funds (Self -Financed Utility) K. Friese & Associates, Inc. City of Cedar Park City of Leander Background Information: The original contract included Preliminary Engineering Services and Supplemental Agreement No. 1 included Final Design easement acquisitions, design of 72 -inch water line, and bidding services. The amount of the original contract was $191,919.00 and Supplemental Agreement No. 1 was $627,561.00. The allocated cost for Round Rock, Cedar Park and Leander is 51.78%, 0%, and 48.22%, respectively. Public Comment: N/A