Loading...
CM-08-10-257TCPN - Area E 6448 Highway 290 East - Suite D-104 Austin, TX 78723 (512) 371-9913 phone — (512) 371-9665 fax www.greenwayent.com K AUTHORIZATION THIS IS ADDITIONAL WORK AUTHORIZATION NO: 001 giormstaddwrork.doc Civt- -ttI-2,5}- OWNER'S Cty of Round Rock NAME PHONE (512) 341-3188 DATE October 17.2008 STREET 216 E Main Street JOB NAME Public Library Combined Remodel TX 389 JOB NUMBER TM -246-161-012 CITY Round Rock STATE TX STREET EXISTING CONTRACT NO. NROCK-0000028530 DATE OF EXISTING CONTRACT W3/08 CITY Round Rock STATE TX You are hereby authorized to Scope of Work: • Provide labor materials • Additional painting • Remove hollow metal • Move fire extinguisher • Support tops of removed • Install 3CM tuba Granite • install 6 additional receptades • Move 5 2X4 Tight fixtures, • Install matching track alone. • Core drill into concrete • Pull new cats wire ADDITIONAL CHARGE Payment will be made as perform the following specifically and management for Library to fur downs, emergency exit frame and window. Repair cabinet. wall creating fur downs with bull nose edge. and 7 data raceways remove 3 and return to lighting with 8 heads to illuminate floor to install 5 new flush back to server rooms FOR ABOVE WORK follows: Per Master Subcontract described additional work: renovations. stairs and highlight wall colors. drywall, tape, float, texture and paint. and enabling suspended ceilings to remain. per plans. owner. art one new wall. Install 3 way switches for track receptacles. IS: $ 27,356.23 Agreement Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated. lk Date Z.2. IDL'- 7 31 20 () Authorizing Signature ,ik�I (OWNER SIGNS HERE) We hereby agree to furnish labor and materials -complete in accordance with the above specifications, at above stated price. Authorized Date 20 Signature (CONTRACTTR SIGNS HERE) THIS IS ADDITIONAL WORK AUTHORIZATION NO: 001 giormstaddwrork.doc Civt- -ttI-2,5}- (0 N 0) W W 2411916 9912372 9912372 1741320 1741320 1561360 Hier4Level 4 Code 1311320 (0 N (0 CO -► --► s C5 = < .' CJ 4 - r Partition Wall, Interior, standard, taped both sides,instailed on & incl.25 ga, NLB metal studs, 3 5/8" wide, 16" O.C., 8' to 12' high, 5/8" gypsum drywall Cutout demolition, gypsum block, to 4 S.F. opening, 4" thick, remove, excludes loading and disposal Paints & Coatings, waUs, Interior, drywall, 2 coats, roller smooth Fur downs at coridors. Paints & Coatings, wails, interior, drywall, primer- sealer coat, roller Fur downs at coridors Cleaning Up, cleanup of floor area, final by GC at end of Job Cleaning Up, cleanup of floor area, continuous, per day, during construction Tarpaulins, polyvinyl coated nylon, 14 oz. to 18 oz., max Item Description Field Personnel, superintendent, average 0) N .A7 1,900.00 i io b 0 O N O N ...1 lo CO O IN, 01 p -n D `�I1 0 0) 'i1 co m _ -I. O s A O V N 0 s -4 0 01 .-r C 71 O 5 0 —f O w O 03 _.,.-L0) CO 0)) - Co 0) 1 CNR 01 to c Q. O CO — N CO N CO —L 0 O CO 0 C0 O CO -a 0 O 12050510 9291030'', 9291030 9291030 9221613 9221613 2411923 2411916 9291050 CO CO O CO N (0 O CO CO CO N N CO Paints & Coatings, walls & ceilings, interior, concrete, drywall or plaster, primer, 1 coat, smooth finish, roller *Gypsum wallboard, minimum labor/equipment charge Move fire exstinguisher cabinet Surface Preparation, interior, walls, wash, drywall, gypsum, plaster Gypsum wallboard, standard, w/compound skim coat (level 5 finish), 5/8" thick *Selective demolition, wall openings, metal stud walls, drywall openings move Frie exstiimuisher cabinet Drywall, for finishing outer corners, add Gypsum wallboard, for finishing comers, inside, add Gypsum wallboard, on beams, columns, or soffits, fire resistant, w/compound skim coat (level 5 finish), 1/2" thick Metal studs, minimum Tabor/equipment charge Metal stud partition, non -load bearing, galv., 8' high, 4" wide, 16" 0.C., includes top & bottom track Rubbish handling, 50' haul, load, haul to chute and dumping into chute, cost to be added to demolition cost. Cutout demolition, remove, minimum Tabor/equipment charge High Abuse Gypsum Board, on walls, w/compound skim coat (level 5 finish), 5/8" thick N N N N 0) (1 00O N 0) N N co N P W 0) -n L. 0 -n -n- m -n ' 1 m L. o {n -n 0 _( ` Q. cn m Pa O 9 O O 6)in O O O .P N N .P O (D W 01 IV N W 0) -. O01 co 26053350 N co O U1 (a) CO 01 O 26053350 N co 0 (31 CO Ca) cn O 26053350 3821310 1543310 3821310 26555910 11741010 4431045 9910341 9912372 0) 26 0) 0) 0) Ca) -3. CO 0) 1 .i (0 co Outlet boxes, pressed steel, data , 1 gang, 2-1/2" deep Switch boxes, steel Outlet boxes, pressed steel, masonry, 1 gang, 2-1/2" deep Outlet boxes, cast, duplex receptacle cover, 2 gang, FS Outlet boxes, pressed steel, concrete, floor, 2 gang Concrete core drilling, core, prestressed hollow core plank, 6" thick, 3" diameter core, Includes bit, layout and set up, minimum charge Rent core drill, electric, 2.5 HP 1" to 8" bit diameter - Crew Equip. Cost per Day Concrete core drilling, core, reinforced concrete slab, 4" diameter, up to 6" thick slab, Includes bit, layout and set up Track lighting, minimum labor/equipment charge *Art Custom Lighting, material only. trach and 8 heads, track light, maximum (Owner Sleeted) *Custom Granit, Chosen by Owner, Supplier chosen by owner, Complete & Installed, Custom width 115.84 S.F. Paint Restoration, minimum Tabor/equipment charge Paints & Coatings, walls & ceilings, interior, concrete, drywall or plaster, owner selected paint, 2 coats, smooth finish, roller y CO 01 01 -� N 01 N N .A •••‘ N N [07) D W W -1 g CT CT m CO y l CJ1 01 CD c31 y 0) ,..a. .p — 4 -,, 3,775.00 0 :-.16 4=. CO V 01 0 IV — ' 4 00 0) -a. 00 0) co — A O 01 -a 00 --'Ca) O 03 O 00 CO "NI .p O CO Cie CD (31 0 N CD 03 03 9512310 1 10.00% 271513131 O O e 26050550', 1 cop. O O 0 0) p 01 W (ji 0 (O 1 24.13%] O 01 CO 0 rn 01 O -a 01 0 45.13% -n (D C a z N -.I -co (Jt a) W 1 2,486.93 N ziz. CO Q) (O 0 -7,853.46 W N V N N 0)- 1 V O) "I 01 - O -CO CO OD 00 -• N O N (O '-I Ul p 0 N W O 0o N O -• N -a CO O v 18,231.31 D o'. z; r* 0. (D ' (0 of Q 1 I Total Estimate Small Job ADD 10% Subtotal TCPN Coefficent Subtotal City Cost Index -19% Net Costs (N (11 C vi CD Other Equipment Subcontractor Material co O 01 0) --4 V 0 00 o w J O _,c! cDr1 b) o. I i oI s1 0 O N 131 .7"I S:l', (A 9512310 --► C71 W ..a 0) 271513131 26511370' 26050550', 26050550 0) p 01 W (ji 0 (O 0) rn 0) 0) Suspended Acoustic Ceiling Tiles, minimum labor/equipment charge Voice/Data outlets, two jack opening, excl voice/data devices Unshielded twisted pair (UTP) cable, stranded, PVC jacket, #24, 4 pair, category 5 Residential fixtures, minimum labor/equipment charge 'Ballast, flurorescent fixture, remove Fluorescent Tamp, remove Outlet boxes, minimum labor/equipment charge O) -• N O N 01 (Tl N O co a' D ff N 01 W (N (11 01 0) --4 V 0 00 Q) J O DATE �3 PURCHASE ORDER NUMBER �alO8' PURCHASE REQUEST Page of Check all that apply: ❑ HUB ❑ Asset ❑ Confirm ❑ Sole Source (Justification Attached) ❑ Contract (No. ❑ Emergency ❑Training ❑ Blanket — Start Date TOIP S�1 DELIVERY DATE REQUESTED: ❑ New Vendor (W-9 attached) ❑ State (Req. No. M2426- ❑ HGAC ❑ DIR JCPN [I Buy Board ❑/Other: EndDateOP City Contact Name L_ I ( t L4 J'tCt dsci l' V,E POR UMB ' L VENPSR � _.--�'t (�� ���lam- - o IA tTELEPHONE t,,„c., ,4- 0- ioITY, S TE ZIP...., fi1 % % VENDOR CONTA T AME - gin � Gi � n ? 1) -cll. 131 NUMBE ��� 1- 42 1_5(514)11- FAX NUMB i (o(oS S E MAIL SS fj, LINE COMMODITY CODE DESCRIPTION OTY UM UNIT PRICE AMOUNT ACCOUNT NUMBER 1 CA `O crtake, Al k 1 LX 31 '.213 REMARKS Reason for Purchase/Special Instructions/HUB list shall be attached: -7-"0..(:)Ni _...1A LA S 40 - l 1 %,( O e ea ed ' t_A\C)C-Ps-e_.�R c2.P(PV\()CJA QUOTATIONS RECEIVED: TOTAL COMPANY CONTACT NAME AND NUMBER DATE QUOTE WRITTEN ORAL REMARKS/HUB r ee nW Gi � n ? 1) -cll. 131 - c 2 ❑ ❑ 3 = ❑ REMARKS Reason for Purchase/Special Instructions/HUB list shall be attached: -7-"0..(:)Ni _...1A LA S 40 - White Copy: Financ E ' NIET PURCHASING Yellow Copy: Purchasing Pink Copy Department Green Copy: Receiving FINANCE DATE: October 22, 2008 SUBJECT: City Manager — October 31, 2008 ITEM: Consider issuing a purchase order with Greenway Enterprises, Inc. for the remodeling work at the Robert & Helen Griffith Public Library. Department: Engineering and Development Services Staff Person: Tom Word, Chief of Public Works Operations Larry Madsen, Construction Manager Justification: To complete the remodel work at the Library, electrical/data plugs are being relocated, new electrical/data plugs are being installed, additional track lighting is being installed to improve lighting in several areas, cabinet counter tops are being replaced on cabinet bases. This purchase order with will cover these needed improvements through the buying cooperative of job order contracting. Funding: Cost: $27,356.23 Source of funds: General Self Finance Construction Outside Resources: Greenway Enterprises Background Information: It has been ten years since the last addition/remodel work took place at the Library. The work being performed overall at the Library will update the library with new carpet, paint and lighting. Public Comment: N/A UPDATED APRIL 2008