Loading...
CM-08-12-286CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Utility Administration PROJECT. 2005-06 Wastewater Collection System Rehab Basins BC22-Z, CC32-Z,OC30-Z, EW01-Z, LC11,LC12.LC14,LC16-Z ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: $2,112,690.00 ($60.999.50) ( 39,698.00) ($100.691.50) CHANGE TA PAGE 1 OF 1 DATE: CHANGE ORDER JUSTIFICATION: CURRENT CONTRACT PRICE: 12/12/2008 4 $2,011,992 50 12" Dia. PVC SDR -26 Pressure Rated Pipe 0-6'Deep open cut 30"Dia. Steel Encasement Pi • -, 11 . Bore & Jack Remove & Replace 48"Dia. Manhole, 0'-6' deep, Inc. Epoxy coatin • Remove & Replace 48"Dia. DROP Manhole, EXTRA DEPTH, Inc. E Coatin• 6" PVC Sewer Service Lines 0'-25' with service cleanout Sa• Removal after Pi•e Enlar•ement or CIPP Re lace Manhole Frame & Cover NON -BOLTED, 24" Per Replace Manhole Frame & Cover (BOLTED, 24") Per sect. D2-2 Material Onl NON -PAVED Frame & Grade Adjustment Sealing per Section D2-4 Internal Urethane Chimne Seal MICROSILICA Additional Pipe Installed Varying in Dia. From 6"-12", Complete in place, Inc. Backfill material, service connections, compaction & surface restoration in paved & non paved areas per sect. 02-5 A••1 E Coatin• to Entire Manhole •-rSect. D2-8 Abandon Existin. Manhole •er Detail Sheet PREPARED BY: ENGINEER Enviro Remecliatio ..Coatin. Services Inc. NAME:OF CONTRACTOR SIGNATURE: PRINT NAME/TITLE: Ra APPROVED CITY OF ROUND ROCK Get- bt_ LZ -z 12/12/2008 DATE President OF ORIC C0 NT ACT PR!CE THIS CHANGE ORDER: PREY. CHANGE ORDERS: TOTAL % CHANGE: ORIG. CONTRACT PRICE PLUS CHANGE ORDERS: $2,011,992.50 -1.88% -6.62% -4.77% DATE: December 15, 2008 SUBJECT: City Manager Approval - December 19, 2008 ITEM: Consider executing Change Order No. 4 with Enviro Remediation Coatings Services, Inc. for the 2005-2006 Wastewater Collection System Project. Department: Water and Wastewater Utilities Staff Person: Michael Thane, P.E., Director of Utilities Justification: The City is required to inspect, repair, and certify its wastewater collection system in compliance with the Texas Commission on Environmental Quality's Edwards Aquifer Recharge Zone Protection Program. This change order adjusts final contract quantities for all work performed under this contract. Funding: Cost: ($39,698.00) Source of funds: WW Utility Fund (F260) Outside Resources: RJN Group, Inc. (Engineering Consultant) Enviro Remediation Coatings Services, Inc. Background Information: This project rehabilitates defective sewers, which were identified in the 2005-2006 Wastewater Collection System Inspection Project in three Edwards Aquifer Basins (CC -32Z, OC -30Z, and BC -22Z). The elimination of defects not only helps protect the aquifer, but also reduces inflow and infiltration entering the sewer system, thereby reducing the City's treatment cost from the Lower Colorado River Authority and the Brazos River Authority, who respectively own and operate the Brushy Creek Regional Wastewater Treatment Plant. The scope of the project includes cured -in-place pipe, liner patches, point repairs, pipe bursting, boring, conventional pipe replacement, internal joint grouting, and manhole rehabilitation and replacement. Public Comment: N/A Blue Sheet Format Updated 01/20/04 Amount % Change Original Contract $ 2,112,690.00 N/A Previous Change Orders $ -60,999.50 -2.89% Change Order No. 4 $ -39,698.00 -1.88% Revised Contract $ 2,011,992.50 -4.77% Outside Resources: RJN Group, Inc. (Engineering Consultant) Enviro Remediation Coatings Services, Inc. Background Information: This project rehabilitates defective sewers, which were identified in the 2005-2006 Wastewater Collection System Inspection Project in three Edwards Aquifer Basins (CC -32Z, OC -30Z, and BC -22Z). The elimination of defects not only helps protect the aquifer, but also reduces inflow and infiltration entering the sewer system, thereby reducing the City's treatment cost from the Lower Colorado River Authority and the Brazos River Authority, who respectively own and operate the Brushy Creek Regional Wastewater Treatment Plant. The scope of the project includes cured -in-place pipe, liner patches, point repairs, pipe bursting, boring, conventional pipe replacement, internal joint grouting, and manhole rehabilitation and replacement. Public Comment: N/A Blue Sheet Format Updated 01/20/04