CM-09-01-003Change Order No. 1
Project Name: RM 1431 — 2.0 MG Elevated Water Storage Consultants Project No.: 74095
Tank
Project Owner: City of Round Rock
212 Commerce Cove, Round Rock, TX 78664
Date of Issuance: December 17, 2008
Project Contractor: Landmark Structures 1, L.P.
Date of Contract:
July 29, 2008
Date of Notice to Proceed:
July 21, 2008
Original Completion Date:
January 12, 2010
Contract Period: 540 Calendar Days
It is agreed to modify the Contract ref
CPR #
ITEM AND DESCRIPTION OF CHANGES
CHANGE IN
CONTRACT PRICE
CHANGE IN
CONTRACT TIME
3
Reduce the overflow pipe size from 24 -inch diameter to 16-
inch diameter.
($10,200.00)
0
4
Provide different exterior tank coating materials: Tnemec
Series 1075 instead of Series 140, and Series 700
Hydroflon instead of Series 1074U.
$30,301.00
0
5
Provide stainless steel piping instead of ductile iron for the
interior pedestal horizontal piping.
$15,702.00
0
Attach each approved CPR to this form Difference Net
$35,803.00
0
Summary: It is agreed to modify the Contract referred to above as follows:
Contract Price prior to this Change Order Contract Time prior to this Change Order
540 calendar days — January 12. 2010
$ 4.185,000.00
Net (increase) / (decrease) with this Change Order
$ 35.803.00
Revised Contract Price with all approved Change Orders
$ 4.220.803.00
Net (increase) / (decrease) with this Change Order
0 days
Revised Contract Time with all approved Change Orders
540 calendar days - January 12.2010
The changes included in this Change Order are to be accomplished in accordance with the terms, stipulations
and conditions of the original Contract as though included therein.
Accepted for Contractor by:
Date:
Recommended for Approval by ( Consulting Firm's Name ): CC. SDate:
Apprd for Owner by:
Attest: (if required)
Appro ther - when required)
Distribution: 0 Owner
CM -DSI -al -003
0 Contractor
0 Office
December 19, 2008
/ 2/7 Z / c2 3
Date:
1. g.d9
Date:
0 Field 0 Other
DATE: January 2, 2009
SUBJECT: City Manager Approval —January 9, 2009
ITEM: Consider executing Change Order No. 1 to the construction contract with
Landmark Structures I, L.P. for the RM 1431-2MG Elevated Water Storage Tank
Improvements Project.
Department:
Staff Person:
Water and Wastewater Utilities
Michael D. Thane, P.E., Director of Utilities
Justification:
Change Order No. 1 to the construction contract for the RM 1431-2MG elevated water storage
tank includes a change to a higher grade of Tnemec exterior coating system. This system
provides a longer and clearer finish with a 10 -year warranty in lieu of the standard one-year
warranty. Also with this change order, the interior horizontal pedestal piping is being changed
from a ductile iron pipe that requires a coating system to a stainless steel pipe which does not
require a coating. The final item in this change order is a reduction in the overflow pipe
diameter from 24 -inches to 16 -inches.
Funding:
Cost: $35,803.00
Source of funds: Capital Project Funds (Self -Financed Utility)
Amount % Change
Original Contract $4,185,000.00 N/A
Change Order No. 1 $35,803.00 0.86
Revised Contract $4,220,803.00 0.86
Outside Resources: Landmark Structures I, L.P.
HDR, Inc.
Background Information:
With the RM 1431-2.0 MG Elevated Water Storage Tank, the City can more efficiently deliver
potable water from our current Water Treatment Plant. Additionally, our future Brushy Creek
Regional Utility Authority (BCRUA) Water Treatment Plant will benefit from this project as well.
In addition to this project, two other projects are required to meet our obligations under an
Interlocal Agreement for Emergency Water Supply between the Cities of Round Rock and Cedar
Park. This agreement was approved by Council on May 24, 2007. These projects included the
RM 1431 36 -inch Water Line project which was recently completed along with the 7.5 MGD
High Service Pump project that is under construction. Cedar Park has contributed $1,000,000
toward these projects per said agreement.