Loading...
CM-09-05-080STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: AGUIRRE & FIELDS, LP ("Engineer") ADDRESS: 4800 Sugar Grove, Ste. 600, Stafford, TX 77477 PROJECT: Georgetown Street Bridge Over Brushy Creek Project This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Aguirre & Fields, LP, hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 25th day of April, 2008 for the Georgetown Street Bridge Over Brushy Creek Project in the amount of $15,000.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $7,400.00 to a total of $22,400.00; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Il. Article 4 Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $7,400.00 the lump sum amount payable under the Contract for a total of $22,400.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rev.12/01/08 0126.0811/159872 CM-OS-05-oso 84275 AGU & FIELDS, LP By: u;nt LLG - Gan. t Bear? RLccca R. F71h ,200 Date Date Supplemental Contract 0126.0811/159872 2 AP . ! 1 VED AST FORM: . 4/ Steph n L. Sheets, City Attorney Rev. 12/01/08 84275 ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: Project Description: The project shall consist of a geotechnical field program, laboratory testing, engineering report, and reconunendations for the repair of the approach slab and sidewalk at the north end of the Georgetown St. Bridge in an effort to eliminate the settling of the slab and the resulting bump that is experienced by vehicular traffic. Recommendations will be in the form of a written report prepared to inform the City of preferred repair methodology of the bridge. Under this work authorization the Engineer will be responsible for the following: DELIVERABLES 1. Geotechnical engineering and evaluation report 2. Recommended repair report MISCELLANEOUS (Function Code 163) A) Data Collection. The Engineer shall collect, review and evaluate data described below. The Engineer shall notify the City in writing whenever the Engineer finds disagreement with the information or documents: Two (2) borings to depths of 20 feet at the north approach. Soil/fill parameters with respect to strength and serviceability (e.g. compressibility). B) Geotechnical Engineering and Evaluation Report. 1. The results of the field and laboratory programs will be evaluated by a registered professional engineer. 2. The report will provide recommendations regarding subsurface conditions. C) Recommended Repair Report. The report, provided by a registered professional engineer, will include the following: 1. Evaluation and significance of subsurface conditions. 2. Recommendation of preferred repair methodology and opinion of probable quantities and cost. ADDENDUM TO EXHIBIT C Work Schedule The changes to the Work Schedule for this project are as follows: Project: Georgetown Street Bridge over Brushy Creek 1. The Engineer shall complete work described in Exhibit B within 45 days of the notice to proceed. 2. The Engineer shall provide final submittals of each report. Project: ADDENDUM TO EXHIBIT D Fee Schedule The changes to the fee schedule for this project are as follows: Georgetown Street Bridge Brushy Creek Bridge Approach Repair Added Geotechnical Evaluation Phase Position HOURS _ RATE AMOUNT Project Manager 3.00 $60.00 $180.00 Sr. Bridge Engineer $60.00 Project Engineer 16.00 $36.00 $576.00 E.I.T. $28.00 Tech $20.00 Clerical $18.00 Subtotal Overhead (160%) Salary Total Fixed Fee (15%) 19.00 $756.00 $1,209.60 $1,965.60 $294.84 TOTAL SALARY PLUS OVERHEAD PLUS FIXED FEE $2,260.44 Direct Expenses $79.56 Subconsultants: Terracon (Geotech)(lncluding 10% Coordination) $5,060.00 TOTAL $7,400.00 DATE: May 6, 2009 SUBJECT: City Manager Approval — May 8, 2009 ITEM: Consider executing Supplemental Contract No. 1 with Aguirre & Fields, L.P. for the Georgetown Street Bridge over Brushy Creek Project. Department: Staff Person: Justification: Engineering and Development Services Danny Halden, P.E., City Engineer This contract is to perform geotechnical engineering and evaluation, and to obtain recommendations regarding repair/stabilization of the approach area immediately north of the Georgetown Street Bridge. Funding: Cost: $7,400 Source of funds: General Fund Outside Resources: Aguirre & Fields, L.P. Background Information: The approach area at the north end of the Georgetown Street Bridge has settled and the sidewalk has experienced significant cracking. Previous efforts by the City to raise or repair the approach area have only provided temporary relief. Aguirre & Fields, L.P. has been retained to determine a viable long term solution to the approach area problem and for proper design of the sidewalk repairs. The original contract also included services to perform a cursory assessment of the entire bridge for ensuring that the bridge will remain functional and serviceable for the public. The original contract was approved on April 25, 2008. Aguirre and Fields has previously performed the bridge assessment and found the bridge to be in satisfactory condition. The City expended $4,000 of the original $15,000 contract on the bridge assessment. This supplement will add geotechnical investigation and evaluation to the scope contained in the original contract which will help to direct the approach area design work that has not yet been undertaken as part of the original contract. Public Comment: N/A UPDATED APRIL 2008