CM-09-05-094Note: CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER This change order voids and replaces previous Change Order No. 4. DEPARTMENT: Engineering & Development Services PROJECT: South Creek Channel Improvements ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: ITEM # DESCRIPTION OF CHANGES $2,519,793.75 $41,210.12 ($207.143.87) (8165.933.75) CHANGE DATA UNIT QTY. PAGE 1 OF 1 DATE: May 15, 2009 CHANGE ORDER NO: 4 (Revised) JUSTIFICATION: Change Order No. 4 (Revised) voids and replaces previous Change Order No. 4 and properly reconciles the final contract price. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING 1 2 3 4 5 6 7 8 9 Delete Base Bid Item # 19, 24" dry rock riprap. Delete Base Bid Item # 20, 6" dry rock riprap. Delete Base Bid Item # 24, filter fabric. Adjust quantity of Base Bid Item # 27, stabilized construction entrance. Delete Base Bid Item # 28, silt fence. Adjust quantity of Alt. 2 Bid Item # 4, non-native seeding for erosion control method. Adjust quantity of Alt. 2 Bid Item # 5, soil retention blanket. Delete Alt. 2 Bid Item # 7, filter curb inlet protection. Adjust quantity of Alt. 2 Bid Item # 8, rock berm. SY CY SY EA LF SY SY EA LF -968 -1,710 -987 -1 -2,000 -361.12 -361.12 -2 -28 $58.00 $80.00 $2.30 $5,300.00 $2.00 $1.35 $3.80 $63.00 $23.00 ($56,144.00) ($136,800.00) ($2,270.10) ($5,300.00) ($4,000.00) ($487.51) ($1,372.26) ($126.00) ($644.00) 0 0 0 0 0 0 0 0 0 SIGNATURE: Au in Fi -r Systems, Inc. tractor PRINT NAME/TITLE: /1444,0/r v w APPROVED: City`ofRound Rock James R. Nuse, P.E., City Manager Date TOTAL: ($207,143.87) 0 PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: ($207,143.87) PREVIOUS CHANGE ORDER: $41,210.12 TOTAL % CHANGE: (6.59)% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $2,353,860.00 oonstoo2/forms6nk DATE: May 20, 2009 SUBJECT: City Manager Approval — May 22, 2009 ITEM: Consider executing Change Order No. 4 (revised) with Austin Filter Systems, Inc. for the South Creek Channel Improvements Project. Department: Engineering and Development Services Staff Person: Danny Halden, P.E., City Engineer Justification: Change Order No. 4 (revised) is needed to replace previously executed Change Order No. 4. The previous change order was drafted prior to finalization of a settlement agreement between the City and the Contractor, and this revised change order will provide accurate accounting regarding the final contract price. Funding: Cost: ($207,143.87) Source of funds: 2002 G. O. Bond Original Contract Previous Change Orders Change Order No. 4 (revised) Revised Contract Outside Resources: Espey Consultants, Inc. Background Information: Amount $2,519,793.75 $41,210.12 ($207,143.87) $2,353,860.00 % Change N/A 1.64% -6.59% -4.95% Previously, the City and Contractor (Austin Filter Systems, Inc.) entered into a settlement agreement for the South Creek Channel Improvements Project. Included in the agreement was Change Order No. 4 which reduced the contract. However, the original Change Order No. 4 was drafted before the final terms of the settlement agreement had been determined. The original Change Order No. 4 contemplated removal of grass growth from the contract in the amount of $24,000.00. The settlement agreement addresses grass growth, and Change Order No. 4 (revised) is needed so that grass growth ($24,000.00) is not removed from the contract. This revised change order will ensure correct accounting regarding the contract price but will not increase or decrease what the City is obligated to pay the Contractor under the settlement agreement. Public Comment: N/A UPDATED APRIL 2008