CM-09-05-095CITY OF ROUND ROCK PUBLIC WORKS CONSTRUCTION CHANGE ORDER Project: Vehicle Maintenance Facility Address: 901 Luther Peterson Place Change Order No.: 2 Initiation Date: 5/14/2009 Round Rock, Texas Contract For: New Construction To: Prism Development Inc. 2709 East 5th Street Austin, Texas 78702 (Contractor) The Contract is changed as follows: Contract Date: 2/18/2009 Additional cost due to the un -foreseen telecommunications and fiber conduit lines running under the south west comer of the designed foundation footings. Additional steel and additional beam work required. ADD 2,850.00 Summary The original (Contract Sum) was• $ 220,792.00 Net change by previous authorized Change Orders. $ 3,973.00 The (Contract Sum) prior to this Change Order was' $ 224,765.00 $ 2,850.00 The new (Contract Sum) including this Change Order will be• $ 227,615.00 The Contract time will be (unchanged) by ( 0 )days: The Date of Substantial Completion as of the date of this Change Order therefore is: The (Contract Sum) will be (increased) (unchanged) by this Change Order Changes included in the summary above (do) (do not) include modifications which have been authorized by Construction Change Directive(s). Architecture Plus Prism Development Inc. Architect 1907 N. Lamar Blvd # 260 Address Austin, Texas 78705 Contractor 2709 East 5th Street Address City of Round Rock Owner 221 East Main Street Address Texas 78702 Round Rock, Texas 78664 Mac Ragsdale Date CM-r.t-c-mss By Michael von Ohlen Date James R. Nuse, P.E '- -c9k Date • 1 • Prism Development, Inc. CHANGE ORDER PROPOSAL DATE: May 12, 2009 ATTN.: Pete Dominguez COMPANY: City of Round Rock VIA FACSIMILE: JOB NAME: Vehicle Maintenance Facility LOCATION: 901 Luther Peterson Place WE HEREBY propose to furnish material and labor - complete in accordance with these specifications for: CHANGE ORDER PROPOSAL INCLUDES: LABOR AND MATERIAL TO ACCOMMODATE THE TELECOMMUNICATIONS CONDUIT UNDER THE EXISTING FOOTING AS ILLUSTRATED ON THE DETAIL PLANS, PAGES XS -6 THRID 9 DATED 5/04/09. ALL FOR THE SUM OF: $ 2,850.00 EXCLUSIONS: PERMITS AND FEES, LICENSES, BONDING FEES, SURVEYING, LAYOUT, TESTING, INSPECTIONS, DESIGN, UTILITY LOCATION, DAMAGE TO UTILITIES, SHORING, TRENCH PROTECTION, EXCAVATION, HAUL OFF, TAXES, BACKFILLING, VOID MITITGATION, CARTON FORMS, SUBGRADE PREPARATION, SEALERS, SHORING, FORMING OF ELEVATED PANWORK, HOISTING, PUMPING. SLEEVES, EMBEDS, ROCK EXCAVATION, HAUL -OFF, TRAFFIC CONROL & BARRICADES, SITE MUST BE ACCESSIBLE AND CLEARED, AND ALL OTHER MATERIALS AND/OR TRADES NOT CLEARLY STATED IN ABOVE PROPOSAL. Items and prices are broken down and separated to assist in bidding purposes only, and are not intended to be separated or deleted without prior consent. All material is guaranteed to be as specified. All work to be completed in workmanlike manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above estimate. All agreements are contingent upon strikes, accidents or delays beyond our control. er/General Contractor to cavy fire, tornado, and other necessary insurance. Our workers are fully-coye 4 by Wo ers Compensation Insurance. Authorized Signature i v € ,6' 8t i L G; sti ator 1111 NOTE: This proposal may be withdrawn by us if not accepted within 10 days. PLEASE NOTE: MATERIAL PRICES ARE GOOD FOR 10 DAYS ONLY. THE GC WILL BE RESPONSIBLE FOR ALL ESCALLATIONS 10 DAYS AFTER THE PROPOSAL DATE UNLESS WE RECEIVE A SIGNED PROPOSAL WITHIN THE 10 DAYS. ACCEPTANCE The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. All invoices due in 30 days. A late fee of 1.5% interest will be billed if not r e y • within 30 days. Signature: Print Name: Date: 15.2%2- • own 2709 East 5th Street Austin, Texas 78702 (512) 479-9587 FAX (512) 479-9591 DATE: May 20, 2009 SUBJECT: City Manager - May 22, 2009 ITEM: Consider executing Change Order No. 2 with Prism Development, Inc. for the Additions and Renovations to the Vehicle Shop Facility. Department: Engineering and Development Services Staff Person: Tom Word, Chief of P.W. Operations Larry Madsen, Construction Manager Justification: Additional cost due to the un -foreseen telecommunications and fiber conduit lines running under the south west corner of the designed foundation footings. Additional steel and additional beam work required. Funding: Cost: Source of funds: General Self Finance Construction $2,850.00 Outside Resources: Architecture Plus, Inc. Background Information: Original construction contract with Prism Development was approved by City Council on 12/16/2008. Public Comment: N/A Amount % Change Original Contract $220,792.00 N/A Previous Change Orders $3,973.00 1.80% Change Order No. 2 $2,850.00 1.29% Revised Contract $227,615.00 3.09% Outside Resources: Architecture Plus, Inc. Background Information: Original construction contract with Prism Development was approved by City Council on 12/16/2008. Public Comment: N/A