CM-09-06-113STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HUGGINS/SEILER & ASSOCIATES, L.P. ("Engineer") ADDRESS: 116 East Main Street, Round Rock, TX 78664 PROJECT: North Mays Extension/Arterial "M" from Jeffrey Way to Old Settlers Blvd. This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Huggins/Seiler & Associates, L.P., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 24th day of January, 2008 for the North Mays Extension/Arterial "M" from Jeffrey Way to Old Settlers Blvd. Project in the amount of $144,625.80; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $32,287.30 to a total of $176,913.10; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. 11. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $32,287.30 the lump sum amount payable under the Contract for a total of $176,913.10, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract 0199.7035/ 162635 Rev.12/01 /08 84275 HUGGINS/SEILER.' ASSOCIATES, L.P. By:46 8.144 tns Date CITY OF ROUND ROCK By: Date Supplemental Contract 0199.7035/ 162635 2 APPR I D AS O F • RM: L. Sheets, City Attorney Rcv.12/01/08 84275 ADDENDUM TO EXHIBIT B ENGINEERING SERVICES This project consists of widening and extending North Mays Street from FM 3406, north approximately 1800'. It has become necessary to extend the project limits north by 600'. This change was necessitated by driveway considerations on the adjacent parcel and subsequent roadway super elevation additions. The extension of the project includes revisions to an existing cross drainage structure and completed Traffic Control Plans. It has also become necessary to obtain additional topo and to revise two ROW parcels previously completed. Water and wastewater plans were not included in the original scope of the contract. The following services are added to the contract: I. WATER AND WASTEWATER PLANS A. WATERLINE DESIGN 1. VALVES, FIRE HYDRANTS AND OTHER APPURTENANCES The ENGINEER shall identify needs for existing assembly adjustments. If adjustments are minor in nature, no other work is required. If adjustments are not covered by details and standards, plan sheets should be prepared in sufficient detail to ensure proposed placement does not conflict with proposed roadway or other utility elements. B. WASTEWATER DESIGN 1. VALVES AND OTHER APPURTENANCES The ENGINEER shall identify needs for existing assembly adjustments. If adjustments are minor in nature, no other work is required. If adjustments are not covered by details and standards, plan sheets should be prepared in sufficient detail to ensure proposed placement does not conflict with proposed roadway or other utility elements. ADDENDUM TO EXHIBIT C WORK SCHEDULE The work included in this contract will be completed by December 31, 2010. ADDENDUM TO EXHIBIT D FEE SCHEDULE Attached Behind This Page ADDENDUM TO EXHIBIT.D City of Round Rock Mays Extension Sheet 1 of 4 LABOR COSTS BY FUNCTION CODE DIRECT OVERHEAD LABOR 160.00% F.C. 110 ROUTE AND DESIGN STUDIES F.C. 120 ENVIRONMENTAL STUDIES F.C. 130 RIGHT OF WAY PLANS F.C. 150 FIELD SURVEYS / MAPPING F.C. 160 ROADWAY DESIGN CONTROLS F.C. 161 DRAINAGE F.C. 162 SIGNING, MARKINGS, AND SIGNALIZATION F.C. 163 MISCELLANEOUS (ROADWAY) F.C. 164 MANAGING CONTRACTED PROF. SERVICES F.C. 165 TRAFFIC MANAGEMENT SYSTEMS F.C. 170 BRIDGE DESIGN F.C. 190 PROJECT MANAGEMENT F.C. 191 SUPPORT SERVICES F.C. 310 CONSTRUCTION PROJECT SUPERVISION F.C. 320 CONSTRUCTION INSPECTION F.C. 330 CONSTRUCTION JOB CONTROL SUB TOTAL TOTALS $ $ $ 4,370.00 $ 1,888.00 $ 796.00 $ 3,632.00 $ $ $ $ $ $ $ $ $ $ $ 6,555.00 $ 2,832.00 $ 1,194.00 $ 5,448.00 $ $ $ $ TOTAL DI FIXED FEE LABOR+OVH 12.00% $ 3 $ $ 10,925.00 $ 4,720.00 $ 1,990.00 $ 9,080.00 0 - 3 - $ $ $ $ $ TOTAL COST $ S $ 3 $ $ $ - $ $ 1,311.00 $ 12,236.00 $ 566.40 $ 5,286.40 $ 238.80 $ 2,228.80 3 1,089.80 $ 10,169.60 $ - $ $ $ $ $ $ $ $ - $ $ 3 $ $ $ $ $ 29,920.80 $ 10 686.00 $ 16 029.00 $ 26 716.00 DIRECT COSTS: EXPENSES: $ 3,206.80 $ 29,920.80 Final Mylar Plots Reproduction Mileage Airline Flights Per Diem Mail & Deliveries ?Advertise:tor Bids;: UNIT SF EA Mile EA Day EA RATE .::.:c:'".''`: QUANTITY TOTAL EXPENSES SUB -CONTRACTS: lnla`nd Ge.odotI TASK dditional Topp Parcel renis, $ TOTAL TOTAL TOTAL SUB -CONTRACTS TOTAL DIRECT COSTS TOTAL COST $ 2,366.60 $ 32,287.30 H/SA MANHOUR SUMMARY Sheet 2 of 4 Mays Extension City of Round Rock H/SA Contract No. 238.01.00 FC 110 ROUTE AND DESIGN STUDIES Manhours Rate Direct Labor Project Manager 0 $46.00 $ Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer 111 0 $42.00 $ Engr Spec 111 0 $42.00 $ Engineer! 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $ FC 120 ENVIRONMENTAL STUDIES Manhours Rate Direct Labor Project Manager 0 $46.00 $ Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer 111 0 $42.00 $ Engr Spec 111 0 $42.00 $ Engineer! 0 $38.00 $ Engr Tech 111 0 $34.00 $ Sub -total 0 $ FC 130 RIGHT OF WAY PLANS Manhours Rate Direct Labor Project Manager 0 $46.00 $ Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer 111 0 $42.00 $ Engr Spec Ill 0 $42.00 $ Engineer 1 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $ FC 150 FIELD SURVEYS/MAPPING Manhours Rate Direct Labor Project Manager 0 $46.00 $ Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer III 0 $42.00 $ Engr Spec III 0 $42.00 $ Engineer 1 0 $38.00 $ Engr Tech III 0 $34.00 $ Sub -total 0 $ H/SA MANHOUR SUMMARY Sheet 3 of 4 Mays Extension City of Round Rock H/SA Contract No. 238.01.00 FC 160 ROADWAY DESIGN CONTROLS Manhours Rate Direct Labor Project Manager 6 $46.00 $ 276.00 Engineer V 11 $46.00 $ 506.00 Engr Spec V 11 $46.00 $ 506.00 Engineer 111 11 $42.00 $ 462.00 Engr Spec 111 18 $42.00 $ 756.00 Engineer 1 24 $38.00 $ 912.00 Engr Tech III 28 $34.00 $ 952.00 Sub -total 109 $ 4,370.00 FC 161 DRAINAGE Manhours Rate Direct Labor Project Manager 2 $46.00 $ 92.00 Engineer V 4 $46.00 $ 184.00 Engr Spec V 4 $46.00 $ 184.00 Engineer 111 4 $42.00 $ 168.00 Engr Spec III 8 $42.00 $ 336.00 Engineer 1 10 $38.00 $ 380.00 Engr Tech 111 16 $34.00 $ 544.00 Sub -total 48 $ 1,888.00 FC 162 SIGNING, MARKINGS AND SIGNALIZATION Manhours Rate Direct Labor Project Manager 1 $46.00 $ 46.00 Engineer V 2 $46.00 $ 92.00 Engr Spec V 2 $46.00 $ 92.00 Engineer III 2 $4200 $ 84.00 Engr Spec 01 3 $42.00 $ 128.00 Engineer I 4 $38.00 $ 152.00 Engr Tech Ili 6 $34.00 $ 204.00 Sub -total 20 $ 796.00 FC 163 MISCELLANEOUS (ROADWAY) Manhours Rate Direct Labor Project Manager 10 $46.00 $ 460.00 Engineer V 4 $46.00 $ 184.00 Engr Spec V 28 $46.00 $ 1,288.00 Engineer 111 4 $42.00 $ 168.00 Engr Spec 111 8 $42.00 $ 336.00 Engineer 1 10 $38.00 $ 380.00 Engr Tech III 24 $34.00 $ 816.00 Sub -total 88 $ 3,632.00 FC 170 BRIDGE DESIGN Manhours Rate Direct Labor Project Manager 0 $46.00 $ Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer III 0 $42.00 $ Engr Spec 111 0 $42.00 $ Engineer 1 0 $38.00 $ Engr Tech 111 0 $34.00 $ Sub -total 0 $ H/SA MANHOUR SUMMARY Sheet 4 of 4 Mays Extension City of Round Rock H/SA Contract No. 238.01.00 FC 164 MANAGING CONTRACTED PROF. SERVICES Manhours Rate Project Manager 0 $46.00 $ Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer!!! 0 $42.00 $ Engr Spec III 0 $42.00 $ Engineer I 0 $38.00 $ Engr Tech 111 0 $34.00 $ 0 $ Sub -total FC 165 TRAFFIC MANAGEMENT SYSTEMS Project Manager Engineer V Engr Spec V Engineer!!! Engr Spec 111 Engineer I Engr Tech 111 Manhours Rate Direct Labor Direct Labor Sub -total FC 190 PROJECT MANAGEMENT Project Manager Engineer V Engr Spec V Engineer 111 Engr Spec 111 Engineer I Engr Tech!!! 0 $46.00 $ 0 $46.00 $ o $46.00 $ 0 $42.00 $ 0 $42.00 $ 0 $38.00 $ 0 $34.00 $ 0 $ Manhours 0 0 0 0 0 0 0 0 FC 191 SUPPORT SERVICES Project Manager Engineer V Engr Spec V Engineer 111 Engr Spec III Engineer 1 Engr Tech 111 Sub -total Sub -total Rate $46.00 $ $46.00 $ $46.00 $ $42.00 $ $42.00 $ $38.00 $ $34.00 $ Direct Labor Manhours Rate Direct Labor 0 $46.00 $ 0 $46.00 $ 0 $46.00 $ 0 $42.00 $ 0 $42.00 $ 0 $38.00 $ 0 $34.00 $ 0 $ FC 310 CONSTRUCTION PROJECT SUPERVISION Manhours Rate Direct Labor Project Manager 0 $46.00 $v Engineer V 0 $46.00 $ Engr Spec V 0 $46.00 $ Engineer 111 0 $42.00 $ Engr Spec 111 0 $42.00 $ Engineer! 0 $38.00 $ Engr Tech 111 0 $34.00 $ 0 $ Sub -total DATE: June 17, 2009 SUBJECT: City Manager Approval — June 19, 2009 ITEM: Consider executing Supplemental Contract No. 1 with Huggins/Seiler & Associates, L.P. for the North Mays Extension/Arterial "M" from Jeffrey Way to Old Settlers Blvd. project. Department: Transportation Services Staff Person: Tom Word, P.E., Chief of Public Works Operations Justification: The North Mays Extension/Arterial "M" Project will widen Mays Street between Old Settlers Boulevard and Jeffrey Way. This Supplemental Contract No. 1 will extend the original project limits north by 600'. This change is due to driveway considerations on the adjacent parcel and subsequent roadway super elevation additions. The extension of the project includes revisions to an existing cross drainage structure and completed Traffic Control Plans. It has also become necessary to obtain additional topo and to revise two ROW parcels. Water and Wastewater design plans are also being added with this Supplemental Contract No. 1. Funding: Cost: $32,287.30 Source of funds: RR Trans Dev Corp Construction Outside Resources: Huggins/Seiler & Associates, L.P. Background Information: On January 24, 2008 the City Council approved a contract for engineering services with Huggins/Seiler & Associates, L.P. for the North Mays Extension/Arterial "M" project (R -08-01- 24-10E1). The original contract consists of widening and extending North Mays Street from Old Settlers Boulevard north to Jeffrey Way, approximately 1800'. Public Comment: N/A UPDATED APRIL 2008