CM-09-06-117CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER DEPARTMENT: Engineering and Development Services PROJECT: Additions and Renovations to Vehicle Shop Facility ORIGINAL CONTRACT PRICE: $220,792.00 PREVIOUS CHANGE ORDERS: $6,823.00 THIS CHANGE ORDER: $950.00 CHANGE ORDERS TO DATE: $7,773.00 ITEM # 1 DESCRIPTION OF CHANGES Labor and materials to add concrete curb to existing small engine shop to repair addition to correct possible drainage problem. Labor and materials to add additional metal to overhand at small engine repair shop. Labor and material to repair damaged grade beam, splicing and repair of existing steel, due to water main line break discovered under new construction. CHANGE DATA UNIT 1 QTY. 1 PAGE 1 OF 1 DATE: 6/16/2009 CHANGE ORDER NO: 3 JUSTIFICATION: UNIT PRICE $950.00 AMOUNT $950.00 ADDED DAYS CALENDAR/ WORKING PREPARED BY/ Architecture Plus- Mac Ragsdale C NAME OF CONTRAC R: Prism Development Inc. SIGNATURE: PRINT NAME/TITLE: Michael von Ohlen, President TOTAL: $950.00 0 6-'O' PERCENT OF ORIGINAL CONTRACT PRICE DATE THIS CHANGE ORDER: 0.43% PREVIOUS CHANGE ORDER: 3.09% TOTAL % CHANGE: 3.52% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $228,565.00 OUND ROCK- James R. Nuse, P.E. constco2/forms6/Ik Prism Development, Inc. CHANGE ORDER PROPOSAL DATE: June 10, 2009 ATTN.: Pete Dominguez JOB NAME: Vehicle Maintenance Facility COMPANY: City of Round Rock LOCATION: 901 Luther Peterson Place VIA EMAIL: pdominguez@round-rock.tx.us WE HEREBY propose to furnish material and labor - complete in accordance with these specifications for. CHANGE ORDER PROPOSAL INCLUDES: LABOR AND MATERIAL TO REPAIR DAMAGED GRADE BEAM STEEL IN FOOTING (REMOVAL OF EXISTING STEEL, SPLICING, REPAIRING AND REPLACING STEEL AS ILLUSTRATED IN TYP. GRADE BEAM REINF. DETAIL 15, S2.0 AND DRAWING DATED 6/8/09. ADDITIONAL STEEL FOR THE SMALL ENGINE REPAIR ROOM (PURLINS), STEM WALL (30' X 6" X 6"). ALL FOR THE SUM OF: $ 950.00 EXCLUSIONS: PERMITS AND 1•hhb, LICENSES, BONDING FEES, SURVEYING, LAYOUT, TESTING, INSPECTIONS, DESIGN, UTILITY LOCATION, DAMAGE TO UTILITIES SHORING, TRENCH PROTECTION, EXCAVATION, HAUL OFF, TAXES, BACKFILLING, VOID MITITGATION, CARTON FORMS, SUBGRADE PREPARATION, SEALERS, SHORING, FORMING OF ELEVATED PANWORK, HOISTING, PUMPING. SLEEVES, EMBEDS, ROCK EXCAVATION, HAUL -OFF, TRAFFIC CONROL & BARRICADES, SI Th MUST BE ACCESSIBLE AND CLEARED, AND ALL OTHER MATERIALS AND/OR TRADES NOT CLEARLY STATED IN ABOVE PROPOSAL. Items and prices are broken down and separated to assist in bidding purposes only, and are not intended to be separated or deleted without prior consent. All material is guaranteed to be as specified. All work to be completed in workmanlfice manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above estimate. All agreements are contingent upon strikes, accidents or delays beyond our control. Owner/General Contractor to carry fire, tornado, and other necessary insurance. Our workers are fully covered by Workers Compensation Insurance. Authorized Signature Estimator NOTE This proposal may be withdrawn by us if not accepted within 10 days. PLEASE NOTE: MATERIAL PRICES ARE GOOD FOR 10 DAYS ONLY THE GC WILL BE RESPONSIBLE FOR ALL ESCALLATIONS 10 DAYS AFTER THE PROPOSAL DATE UNLESS WE RECEIVE A SIGNED PROPOSAL WITHIN THE 10 DAYS. ACCEPTANCE The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. All invoices due in 30 days. A late fee of 1.5% interest will be billed if not iceived within 30 days. Signature Print Name: Date: 1114 /041 2709 East 5th Street Austin, Texas 78702 (512) 479-9587 FAX (512) 479-9591 DATE: June 24, 2009 SUBJECT: City Manager - June 26, 2009 ITEM: Consider executing Change Order No. 3 with Prism Development, Inc. for the Additions and Renovations to the Vehicle Shop Facility. Department: Engineering and Development Services Staff Person: Tom Word, Chief of P.W. Operations Larry Madsen, Construction Manager Justification: Change Order # 3 is required to cover the additional cost for unforeseen damage to grade beam steel in the footing, additional steel and beam work, and a curb poured at the existing small engine shop to repair the foundation for water protection. Funding: Cost: $950.00 Source of funds: General Self Finance Construction Outside Resources: Architecture Plus, Inc. Prism Development, Inc. Background Information: The original construction contract with Prism Development was approved by City Council on 12/16/2008. Public Comment: N/A Amount % Change Original Contract $220,792.00 N/A Previous Change Orders $6,823.00 3.09% Change Order No. 3 $950.00 0.43% Revised Contract $228,565.00 3.52% Outside Resources: Architecture Plus, Inc. Prism Development, Inc. Background Information: The original construction contract with Prism Development was approved by City Council on 12/16/2008. Public Comment: N/A