CM-2015-995 - 12/11/2015STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: AECOM TECHNICAL SERVICES, INC. ("Engineer") ADDRESS: 9400 Amberglen Boulevard, Austin, TX 78729 PROJECT: Dam 101 This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and AECOM Technical Services, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 13th day of August, 2015 for the Dam 101 Project in the amount of $79,337.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $21,350.00 to a total of $100,687.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $21,350.00 the lump sum amount payable under the Contract for a total of $100,687.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. 64-2015-�q5- Supplemental Contract 0199.1533; 00347444 Rev. 12/01/08 84275 AECOM TEC�HNICAL SERVICES, INC. Fav: Date CITY O ROUND ROCK APP VED AS TO FORM: By: 1 Alae-#�sGr�� or I �y �, �A„�tepha4 L. Sheets, City Attorney Date Supplemental Contract Rev. 12/01/08 0199.1533;00347444 84275 ADDENDUM TO EXHIBIT B Engineering Services Proposed AECOM Scope of Work (SOW) - City of Round Rock - Proposed Dam 101 Geophysical Survey to Investigate Foundation of Proposed Dam 101 Amendment 1 November 24, 2015 This amendment is for supplemental services for the geophysical investigation of Dam 101, per the contract executed 2015-08-13. The following is a summary of the basis for the additional funding request for work already performed. Property Owner request for new Indemnity Agreement, require funds for: - Internal/Client coordination; - Delayed work from Aug/Sep to Oct/Nov - Development and approval of ingress/egress maps - New certificates of insurance - Coordination with subs for same/approvals 2. Original driller decision to not work under the above indemnity agreement. - required search for new driller(s) that would sign; 3. Property Owner Relations/Access Requirements - Requires task -specific, week by week requests, permissions, and scheduling system. - Additional meetings/conference calls with clients, field teams, subs - Focus on avoidance of ruts, trees, vegetation/land disturbance - Rainy weather increases monitoring/scheduling requirements 4. Site Conditions - Delays in approval for an alternative access to work areas - heavy brush limit work completion - hunting season limits work to 3:00 pm - rains left site conditions wet; slowing progress; requiring additional equipment to prevent land damage. - rain outs / partial rain outs - inefficiencies in work teams; additional per diem for geophysical staff B-1 Description of Remaining Work to Complete Geophysical Scope. The following is a description of additional work remaining associated with the geophysical tasks. Refer to the attached figure. Site conditions and weather delays prevented completion of originally planned geophysical lines. It is proposed to perform the following field work to complete the field portion of the geophysical investigation. Task 1. • Layout and flag Lines 0 and 1 Task 2 • Clear Lines 0 and 1 • Perform ERI Testing of Line 0 • Perform preliminary processing of data for Line 0; • Obtain preliminary results for Line 0 — identify confirmation borehole location; Task 3 • Flag line 2, intended to be an offsite line associated with borehole location identified in Task 2. • Clear lines 1 and 2 Task 4 • Perform ERI Testing of Lines 1 and 2 • Process Lines 1 and 2 Remaining Field Schedule. Upon notice to proceed, initiate the above Tasks 1 through 4. This may be able to start within a week, and can be completed in approximately one week, but is dependent upon weather conditions (cannot conduct ERI in rain). Once the borehole location is identified in Task 2 above, planning for drilling activities can begin. The anticipated remaining schedule is still one week of drilling, but will require field conditions to be dry and remain dry for the week. B-2 ADDENDUM TO EXHIBIT C Work Schedule The schedule below provides approximate durations associated with the anticipated milestones: Dam 101 Geophysical Investigation Task Est. Task Start Est. Task End NTP 12/1/15 ERI Field Inv 12/7/15 12/11/15 ID Borings for Geotech drilling/ Utility clearance 12/8/15 12/11/15 Geotech field investigation 12/14/15 12/18/15 Lab Test Results (incorp. into design phase) NA Field notes / logs 12/21/15 1/8/16 Geotech summary Memo 12/21/15 1/8/16 Draft Tech Memo To City 1/11/16 1/15/16 City Review/Comment 1/18/16 1/22/16 Final Draft Tech Memo 1/25/16 1/29/16 Note — above dates assume no weather delays. All field work is dependent on weather conditions. Wet and rainy conditions will require postponement until dry conditions exist that will support equipment. Legend Add -ERI -Lines If Needed Add -ERI -Lines Proposed Borings F-iProposed Dam -•- Proposed Impoundment at Auxiliary �•- Spillway Crest j__; Dam 9Inundation Easement Karst Feature Disturbed (stump holes, land cleark etc.) Non -Sensitive • Sensitive Most Sensitive - - Intermittent Stream (USGS NHD) — • Right -of -Way (Major Roads) Fault (1:62,000; BEG) - - - Inferred Normal — k'___1 Eco•,. I ADDENDUM TO EXHIBIT D Fee Schedule The following table presents the originally scoped amount, the supplemental services request, and new total amount. .Task.,-,. Task Description Original Est Amount Supplemental Amount New Total Amount 1 Project Preparation & Mobilization $7,430 $750 $8,180 2 Field Investigation $18,428 $7,300 $25,728 3 Analysis and Report $12,335 $2,000 $14,335 4 Project Management $5,474 $4,300 $9,774 5 Other Direct Costs $35,670 $7,000 $42,670 Total: $79,337 $21,350 $100,687 1TCXCity of Round Rock onu"sORO°` Agenda Item Summary Agenda Number: Title: Consider exectuting Supplemental Contract No. 1 with AECOM Technical Services, Inc. for the Dam 101 Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 12/11/2015 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: Indexes: Attachments: ,LAF_AECOM_Dam 101 GeoPhys_ SA. #1_12.3.15.pdf, ESC_AECOM_Dam101GeoPhys SA No. 1_12.4.15.pdf, Lake Creek Watershed_Web.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2015-995 Consider exectuting Supplemental Contract No. 1 with AECOM Technical Services, Inc. for the Dam 101 Project. Additional funds are needed for this Project primarily due to the excessive weather conditions we are experiencing at this time. Additional costs were due to delays associated with gaining right -of -entry, additional equipment needs and brush clearing that was not anticipated in the original scope. This Engineering Services Contract with AECOM Technical Services, Inc. is for the Geophysical Investigation utilizing ERI (electrical resistivity imaging) which provide a rapid cost-effective means of evaluating the subsurface materials. This effort will allow for a more focused drilling effort in the future. Because the proposed dam site is located over the karstic region of the Edwards Aquifer Recharge Zone, great care must be taken to determine the appropriate foundation design. Dam 101 is a joint project between the Upper Brushy Creek WCID and the City to substantially lessen the frequency and depth of flooding along Lake Creek, particularly in the Greater Round Rock West area. The District and City signed an ILA that assigned responsibility for coordinating design, construction, and funding of Dam 101 to the City. C1ry of Round Rock Page 1 Printed on 12110/2015 Agenda Item Summary Continued (CM -2015.995) Staff recommends approval. City of Round Rock Page 2 Printed on 12/10/2015