Loading...
CM-09-09-180STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: CP&Y, Inc. ("Engineer") ADDRESS: 10415 Morado Circle, Bldg I, Suite 200, Austin, TX 78759 PROJECT: FM 1460 from 2.2 mi North of US 79 (north of Old Settler's Blvd) to 0.4 mi North of US 79 This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and CP&Y, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 25t1' day of September, 2008 for the FM 1460 from 2.2 mi North of US 79 (north of Old Settler's Blvd) to 0.4 mi North of US 79 Project in the amount of $320,388.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $31,960.51 to a total of $352,348.51; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: 1. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. 11. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $31,960.51 the lump sum amount payable under the Contract for a total of $352348.51, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Cont ract 0199.7081/170360 0,111-01-01- Rev.12/01/08 84275 CP&Y, By: Date oho ) tox._ Pres GI I 0 37 ipoy CITY OF ROUND ROCK By: les h.. t E Date Supplemental Contract 0199.7081/170360 2 AP ' OVE f AS 0 FORM: : ��I. ♦ _.I Step Ian L. Sheets, ity Attorney Rev.12/01 /08 84275 ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: The Engineer shall provide the necessary engineering and technical services required for the revisions of the preparation of plans, specifications and estimates (PS&E). Originally, signal plans were prepared for the intersections of Old Settler's Blvd, Chandler Creek Blvd, and Bowman Rd using a strain pole configuration. These services were performed by the Engineer under a separate contract with Texas Department of Transportation (TxDOT). The City of Round Rock has requested that the signals be designed using mast arms in lieu of span wire. The requested revisions are described in the TASK OUTLINE shown below. TASK OUTLINE The Engineer will revise and/or add construction plans in the following items to accommodate signal modifications using mast arms within the project limits: L TRAFFIC SIGNALS A. A revised traffic signal layout will be prepared for each signal location. The signal layouts will be prepared at a scale of 1"=40' and will indicate location of signal poles, conduit, ground boxes, existing and proposed traffic control devices (signs and markings), and existing utilities. Illutnination will also be located on signal poles for safety lighting purposes. The illumination and signals will utilize separate power sources. The signals will be video actuated utilizing mast artn design. 1. Existing traffic control that will remain (signs and markings) 2. Existing utilities 3. Proposed installation 4. Notes for plan layout B. Phasing and wiring plans will be prepared for each intersection 1. Signal locations 2. Signal indications 3. Phase diagram 4. Marking details (where applicable) S. Aerial or underground interconnect details (when applicable) C. Traffic signal elevations will be prepared showing the vertical clearance required for the mast arm design D. Construction phasing / traffic control per TxDOT standards E. Calculate quantities / prepare summary sheets F. General Requirements 1. Governing specifications and special provisions 2. Project estimate ADDENDUM TO EXHIBIT C Work Schedule The changes to the scope of this project are as follows: TRAFFIC SIGNALS WORK SCHEDULE Change Order 95% Plans Submittal September 8, 2009 Change Order Final Plans Submittal September 28, 2009 ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page 0 W w ow 1— 2 nU o W Z W Wu - 0 0 Fee Schedule/Budget for Chiang, Patel & Yerby, Inc. Li)U t.) c 0 15 O O 44 0 O 0 N CO im C :C 6T :Zr 0 CO lA Cf) (0 N NCf) 1.71 o 0 r r i O) 'V' M N =o 0 LL N ( c 1-3 8 C CTO- O 03 (`t N77 77 0 ctsvs 0. 0) O Q M (0 O o O (() id cc LC) O P.? N CO CO N 0. 0 N 11-1 8 z M cry CV N 0 to 0 0 CV M N (O CO 6V •-r Ea 12 ro C N0 1- b E � N 4) ro tr�c :(0 ,4) =- Q 5 0 6sg) NQS U C Oro4) U U U, 0wu. N 19 19 to co N N COf) C) co O 6A .to CO N :4- CV LO C9 O m D b> M O M �(i) (#)0Lif) CO a 0 0 0 0 1-0 00 CO CO N CV (0 0 N tf) C) ti CO CO (O rf r CO N 00 (- ars N 0 6R 64 64 E9 69 0 0 M O (o C? E4 EA 64 69 64 ^- r cCCO Op. COCOO 0 (O N C? (D CO CO N-• 0) 000 6) N �(0VIV)(ft O O (n 6 J00 O F- 1- 0 O 0 cc U ac 10 - c. < 0 W I W 0 TO0�6% ADDENDUM TO EXHIBIT D Fee Schedule EXHIBIT D - Supplemental Agreement #1 Unit Cost Amount WPM k�( Vetlu lo a fat'Qi1tio'P#bn, Mvlar; Bluellnes .112" X t". i 3/W:Paper Copies 171X47.11 IW Paper,Coples ' Color Paper Coples ateriats ►rt.Binders-/. Crt'Re sheet $: 2' sheet $ n et-•` beet 2 • 0.20 SUBTOTAL DIRECT EXPENSES Is 72.00 2 of 3 ADDENDUM TO EXHIBIT D Fee Schedule EXHIBIT D - Supplemental Agreement #1 Task Description Total Cost ..........:.......................... TOTALLABORCOS TRAFFIC SIGNALS $ 31,888.51 SUB -TOTAL LABOR EXPENSES SUMMARY .` $ 31,888.51 TOTAL LABOR COSTS EXPENSES SUBCONSULTANTS NA TOTAL CP&Y FEE 8 31,888.51 72.00 $ 31,860.51 GRAND TOTAL $ 31,960.51 3 or 3 DATE: September 9, 2009 SUBJECT: City Manager Approval — September 11, 2009 ITEM: Consider executing Supplemental Contract No. 1 with CP&Y, Inc. for the FM 1460 from 2.2 mi North of US 79 (North of Old Settler's Blvd) to 0.4 mi North of US 79 project. Department: Transportation Services Staff Person: Thomas E. Word, P.E., Chief of Public Works Operations Justification: Supplemental Contract No. 1 is required for revisions of the preparation of plans, specifications and estimates (PS&E). Originally, signal plans were prepared for the intersections of Old Settler's Boulevard, Chandler Creek Boulevard and Bowman Road using a strain pole configuration. Those services were performed by the Engineer under a separate contract with TxDOT. The City of Round Rock has requested that the signals be designed using mast arm in lieu of span wire. Funding: Cost: $31,960.51 Source of funds: 4B — Round Rock Transportation Development Corporation Construction Outside Resources: CP&Y, Inc. Background Information: On September 25, 2008 City Council approved a contract with CP&Y, Inc (R -08-09-25-14F2) for PS&E to combine FM 1460 from US 79 to Old Settler's Boulevard, Old Settler's Phase 1 from FM 1460 to the revised limits of Old Settler's Boulevard Phase 2, and the water and wastewater utility adjustments associated with FM 1460. The construction plans contained grading, paving, culver layouts, bridge layouts, span details, signing, pavement markings, delineation and sequence of construction, traffic control, signalization and drainage. The construction of this project was a joint -venture between the City of Round Rock and Williamson County. Public Comment: N/A UPDATED APRIL 2008