Loading...
CM-09-10-211STATUTORY CHECKLIST 24 CFR §58.5 STATUTES, EXECUTIVE ORDERS & REGULATIONS Project Name: YMCA — Construction of Restroom Facilities Project Description (Include purpose, need, and all actions which are either geographically or functionally related): Construction of restroom facilities: $75,000.00 CDBG Funds to construct restrooms with ADA improvements at the YMCA Sports Field Complex. The Project is located in a low to moderate income area and the restrooms are needed to serve the low to moderate income users of the YMCA Sports Field Complex. Location: 1500 North Mays Street Round Rock, Texas 78664 If this project is determined to be categorically excluded according to: 24 CFR 58.35, then use Statutory Checklist for Categorical Excluded projects only. Compliance Factors: Statutes, Executive Orders, and Regulations listed at 24 CFR 08.5 N/A Consultation, Consistency Condition, Rniex•, Deterniination Mitigation vetmits Required Compliance Documentation Appendix 111 Historic Preservation [36 CFR Part 800] X Project is not listed in the national register of historic places. Project may proceed per Charles Peveto for Lawrence Oaks, State Historic Preservation Officer (see clearance letter) Floodplain Management [24 CFR 55, Executive Order 11988] X Project is located in FIRM MAP PANEL 48491C0490E Zone "AE" See letter from Round Rock engineering dept. Wetland Protection [Executive Order 11990] X The Project is located at a previously developed site where there are no wetlands, marshes, wet meadows, nutd flats or natural ponds. Map attached. Coastal Zone Management Coastal Zone Management Act [Sections 307(c), (d)] X Project does not involve placement, erection, or removal of materials, nor an increase in the intensity of use in the Coastal Zone. Project is 219 miles away from CZ. Map attached. Sole Source Aquifers Safe Drinking Water Act (42 USC 201, 300(f) & 21 U.S.C. 349) [40 CFR 149] X Project is not located over the Edwards Aquifer recharge zone. Map attached. Fish and Wildlife Endangered Species Act [50 CFR 402] X The subject property has been developed sincel984 and the Project will have no effect on threatened or endangered species, According to TPWD, many threatened and endangered species are highly mobile. Map and information attached. Wild and Scenic Rivers (next page) Wild and Scenic Rivers Act [Sections 7(b), and (c)] X A Project is located 514 miles from the Rio Grande River at Big Bend National Park being the only Wild and Scenic River in Texas. Map and information attached. Clean Air Clean Air Act [Sections I76(c), (d), X Project is located within an "attainment" area. Per City of Round Rock engineering department. See entail attached. OA -0'110--211 Compliance Factors: Statutes, Executive Orders, and Regulations listed at 24 CFR §58.5 N' A Consultation, Consistency Condition, Reeiew, Determination Mitigation Permits Required Compliance Documentation Appendix III and 40 CFR 6, 51, 93] Farmland Protection Farmland Protection Policy Act [7 CFR 658] X Project site does not include prime or unique farmland, or other farmland of statewide or local importance as identified by the U.S.D.A Project is located in an area comrnitted to urban Ines as a residential area. Map and information attached. Environmental Justice [Executive Order 12898] X Site is suitable for its proposed use and will not be adversely impacted by adverse environmental conditions. Map and information attached. HUD ENVIRONMENTAL STANDARDS Noise Abatement and Control [24 CFR 51 B] X Project does not involve development of noise sensitive uses and the project is not within tine -of -site of a major or arterial roadway or railroad. Map and information attached. Explosive and Flammable Operations [24 CFR 51C] X Project site has no record of any environmental hazards. Attached letter from City of Round Rock, Fire Department. Toxic Chemicals and Radioactive Materials [24 CFR 58.5(i)] X Project site has no record of any environrnental hazards. Site is in a developed residential area. Attached letter from City of Round Rock, Fire Department. PREPARER SIGNATURE: PREPARER NAME: Elizabeth G. Alvarado OFFICIAL SIGNATURE: NAME, TITLE: s R. Nuse, P.E. City Manager RESPONSIBLE ENTITY AGENCY 24 CFR 58.5 - ERR Document DATE:C - / 24Crj'7 DATE: in- 11D-09 I2/08 HUD Region VI Environmental Assessment Checklist Finding of No Significant Impact 1. Is project in compliance with applicable laws and regulations? NYes ONO 2. Is an EIS required? ❑Yes NNo 3. Finding of No Significant Impact (FONSI) can be made. Project will not significantly affect the quality of the human environment. ®Yes ❑No Prepared By: Elizabeth G. Alvarado Title: CD Assistant Date: October 8, 2009 Certified By: Janes R. Nuse, P.E. Title: City Manager Date: /0qt0 DATE: October 12, 2009 SUBJECT: City Manager Approval at the October 16, 2009 staff meeting ITEM: Consider executing the Statutory Checklist for a Finding of No Significant Impact for the YMCA restroom project. Department: Planning and Community Development Staff Person: Jim Stendebach, Director of Planning and Community Development Elizabeth Alvarado, Community Development Assistant Justification: The Statutory Checklist has been completed and does not require any mitigation for compliance with any listed statues or authorities. A Notice of Finding of No Significant Impact and Notice of Intent to Release of Funds will be published on October 17, 2009. After the comment period ends on November 1, 2009 a HUD form 7015 Request for Release of funds will be sent to HUD. Funding: Cost: None Source of Funds: CDBG Background Information: YMCA was approved in the amount of $75,000.00 for CDBG YR 2008-2009. Project description is the construction of restroom facilities with ADA improvements at the YMCA Sports Field Complex. 5112/2009 Request for City Council/City Manager Action El City Council D City Manager Submit completed form for all City Manager and City Council approvals. For Administration Use ONLY (Y`i--ZYTh (q", Received: Received: Tag#: cm- lOG-Jo- 21! Original Documents Received: 2 Department Name: Planning and Community Development Project Name: CDBG - Statutory Checklist for YMCA Contact Person: Veronica Chandler / Vickie Moreno Project Mgr/Resource: Elizabeth Alvarado Project Coordinator: Jim Stendebach Assigned Attorney: Steve Sheets City Council or City Manager Approval Date: Agenda Wording ContractorNendor: N/A Funding Source: Additional funding Source: Amount $0.00 City Manager - October 16, 2009 Account Number: N/A Consider executing the Statutory Checklist for a Finding of No Significant Impact for the YMCA restroom project. Finance Information i= Is Funding Required? Yes [I] No r. Initial Construction Contract Construction Contract Amendment Change Order Change in Quantity Initial Professional Services Agreement Supplemental Professional Service Agreement Purchasing/Service Agreement Purchase Order Item(s) to be purchased LlUnforeseen Circumstances Other (Please clearly identify action on lines below) Amount Required for Submission of ALL City Council and City Manager Items Project Mgr. Signature: Dept. Director Signatu *City Attorney Signature: City Manager Signature: Date: Date: Date: 6-r_4` /1„1 tsc9 /O I L,-D� Date: / O-/ (p -D9 *City Attorney signature is required for all items. REVISED 10/14/2009 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: Planning Project Mgr/Resource: Elizabeth Alvarado ElCouncil Action: ORDINANCE Agenda Wording Project Name: CDBG - Statutory Checklist for YMCA ContractorNendor: None a RESOLUTION :ICity Manager Approval CMA Wording Consider executing the Statutory Checklist for a Finding of No Significant Impact for the YMCA restroom project. Attorney Approval attorney Notes/Comments Date //?/..!)5 O:1wdox\SCCInts\0179\0903\M ISC\00173633.XLS Updated 6/3/08