R-2015-3095 - 12/17/2015 RESOLUTION NO. R-2015-3095 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Capital Excavation Company for the Creek Bend Boulevard Extension Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Capital Excavation Company for the Creek Bend Boulevard Extension Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 17th day of December, 2015. ALAN MCGRAW Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Clerk 0112.1504;00347795 EXHIBIT "A» Page I of 3 Contract Quantity Adjustment/Change Order ROUNOROCK 11-:418 rev,OWS Department: Utilities&Environmental Services Project Name: Creek Bend Blvd Extension Project Date: 10/29/15 City Project ST33CBDR Change Order/Quantity ID Number Adjustment No. 1 justification Replacement of existing A/C 8"waterline under Creek Bend Blvd. and Creek Bend Circle. SUMMARY Amount %Change Original Contract Price: t $8,089,168.50 Previous Quantity Adjustment(s): This Quantity Adjustment: $37,390.27 Total Quantity Adjustment(s): $37,390.27 Total Contract Price with Quantity Adjustment(s): $8,126,558.77 Previous Change Order(s): 0.00 This Change Order: $59,880.00 0.01 Total Change Order(s)To Date: $59,880.00 0.01 Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $8,186,438.77 Difference between Original and Adjusted Contract Prices: $97,270.27 Original Contract Time: 435 Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 31 New Contract Time: 466 ., f, k �`'as l``" aa Prepared By: Signatu Printed Name,Title,Company Date Approvals Contractor: G Signatur < Printed Name Title,Company Date City Project 145 J ~ Manager: Signa tu Printed Name,Title Date Mayor/City Manager Signature Printed Name,Title Date Page 2 of 3 ! — Contract Quantity Adjustment/Change Order tttt!!!! OUNOHOCK It:W, rev06(15 Project Name: Creek Bend Blvd Extension Project Quan.Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment Item # Item Description Unit Qty. Unit Price Amount (Davs) 510-28 8"PVC DR14 C900 Water LF 480 $95.00 $45,600.00 10 510-29 CUT AND CAP EXISTING 8"WL EA 2 $1,400.00 $2,800.00 510-30 ABANDON EXISTING 8"AC WL LF 420 $24.00 $10,080.00 5 510-31 ADJUST WW CLEANOUTS EA 2 $700.00 $1,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $59880.00 15 Page 3 of 3 Contract Quantity Adjustment Change Order -- Q ty 7 / 9 --POUND flOCK ILYAS rev,06/15 Project Name: Creek Bend Blvd Extension Project Quan.Adj./Change Order No.: 1 Quantity Adjustment Data Contract Time Adjustment Bid Item# Item Description Unit Qty. Unit Price Amount 510-13 WET CONNECTIONS 8"DIA X 8"DIA. EA 2.00 $4,000.00 $8,000.00 1 510.21 DUCTILE IRON FITTINGS TON 0.27 $1.00 $0.27 CONNECT EXISTING WATER METER TO 510-26 PROPOSED LINE EA 4.00 $2,000.00 $8,000.00 5 509-01 TRENCH EXCAVATION PROTECTION LF 480.00 $2.00 $960.00 510-23 DISINFECTING/FLUSHING,&TESTING LS 0.62 $12,000.00 $7,440.00 10 511-08 FIRE HYDRANT EA 1.00 $5,000.00 $5,000.00 510-20 8"AC TO D1 ADAPTOR INCL INSTALLATION EA 2.00 $2,000.00 $4,000,00 502-2001 BARRICADES SIGNS&TRAFFIC HANDLING MO 1.33 $3,000.00 $3,990.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $37,390.27 16