CM-09-10-217STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HDR Engineering, Inc. ("Engineer") ADDRESS: 4401 West Gater Blvd., Suite 400, Austin, Texas 78745 PROJECT: RM 1431— 2 MG EIevated Water Storage Tank This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and HDR Engineering, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 27th day of September, 2007 for the RM 1431 — 2 MG Elevated Water Storage Tank Project in the amount of $324,523.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on April 3, 2008 to amend the scope of services and to increase the compensation by $10,000.00 to a total of $334,523.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $11,910.00 to a total of $346,433.00; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $11,910.00 the lump sure amount payable under the Contract for a total of $346,433.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract #2 Rev.12/01/08 0199.4632; 00174214 84275 \VT05143ITK 1 CM -041 -Io -217 HDR ENGINEERING, INC. B Date CITY OF ROUND ROCK By: l0-30-2009 Date Jame5-4.1qu,P.E . Supplemental Contract 42 0199.4632; 00174214 WT051431TK 2 APPROVED AS TO FORM: St Phan L. Sheets, Cit k rney Rev.12/01 /08 84275 ADDENDUM TO EXHIBIT B Engineering Services The following services are to be provided for the extended contract duration: CONSTRUCTION PHASE 1. Consult with and advise City as set forth herein and as provided in the General Conditions and Supplementary General Conditions of the Contract for Construction included in the Contract Documents for the project. The extent and limitations of the duties and responsibilities of Engineer as assigned in said Contract Documents shall not be modified, except as Engineer may otherwise agree in writing. City shall issue all instructions to the contractor performing the Work (hereinafter called "Contractor") except as otherwise provided in writing. 2. Make periodic visits to the site to observe the progress and quality of the executed work and to determine in general if the work is proceeding in accordance with the Contract Documents. In performing this service, the Engineer will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the work or material; he will not be responsible for the techniques and sequences of construction or the safety precautions incident thereto, and he will not be responsible or liable in any degree for the contractors' failure to perform the construction work in accordance with the Contract Documents. During visits to the construction site, and on the basis of the Engineer's on-site observations as an experienced and qualified design professional, he will keep the City informed of the extent of the progress of the work, and advise the City of material and substantial defects and deficiencies in the work of contractors which are discovered by the Engineer or otherwise brought to the Engineer's attention in the course of construction, and may, on behalf of the City, exercise whatever rights the City may have to disapprove work and materials as failing to conform to the Contract Documents. 3. Attend and conduct the monthly progress/coordination meeting with the city, contractor and others including review of the project schedule. Make recommendations to City concerning the disapproval or rejection of Contractors' Work while it is in progress if Engineer believes that such Work will not produce a completed project that conforms generally to the Contract Documents or that it will prejudice the integrity of the design concept of the project as reflected in the Contract Documents. Engineer shall have access to the Work at all times wherever it is in preparation or progress. 4. Consult and advise with the City; issue all instructions to the contractor requested by the City; and prepare routine change orders as required. 5. Evaluate and determine the acceptability of substitute materials and equipment proposed by Contractor. B-1 6. Make recommendations to City regarding the advisability of requiring special inspections or testing of the Work and have City, for the purposes of this paragraph, receive and review all certificates of inspections, testing and approvals required by laws, rules, regulations, ordinances, codes, orders or the Contract Documents to determine generally that their content complies with the requirements of, and the results certified indicate compliance with, the Contract Documents. 7. Act as initial interpreter of the requirements of the Contract Documents, judge the acceptability of the Work and make decisions on all claims of City and Contractor relating to the acceptability of the Work or the interpretation of the requirements of the Contract Documents pertaining to the execution and progress of the Work. Engineer shall not be liable for the results of any such interpretations or decisions rendered in good faith. 8. Review samples, catalog data, schedules, shop drawings, laboratory, shop and mill tests of materials and equipment and other data which the contractor is required to submit, only for conformance with the design concept of the Project and compliance with the information given by the Contract Documents; and assemble written guarantees which are required by the Contract Documents. 9. Determine the amount owing to Contractor based on Engineer's observations at the site and the data comprising the Application for Payment, and recommend in writing payments to Contractor in such amounts. Such recommendations of payment will constitute a representation to City that the Work has progressed to the point indicated and that, to the best of Engineer's knowledge, information and belief, the quality of the Work is in accordance with the Contract Documents. The foregoing representations are subject to an evaluation of the Work for conformance with the Contract Documents upon Substantial Completion, to results of subsequent tests and inspections of others, to minor deviations from the Contract Documents correctable prior to completion and to specific qualifications expressed by Engineer. The issuance of a recommendation will further constitute a representation that the Contractor is entitled to payment in the amount certified. However, the issuance of a recommendation for payment will not be a representation that the Engineer has (1) made exhaustive or continuous on-site inspections to check the quality or quantity of the Work; (2) reviewed construction means, methods, techniques, sequences or procedures; (3) reviewed copies of requisitions received from Subcontractors and material suppliers and other data requested by the City to substantiate the Contractor's right to payment; or (4) made examination to ascertain how or for what purpose the Contractor has used money previously paid on account of the Contract Price. 10. Receive and review maintenance and operating instructions, schedules, guarantees, bonds, certificates of inspection and tests and approvals of equipment, which are to be provided by Contractor in accordance with the Contract Documents. Determine that their content complies with the requirements of the Contract Documents and transmit them to City with written comments. B-2 11 Conduct, in company with the City, a preliminary and a final inspection of the Project for assessing conformance with the design concept and compliance with the Contract Documents, determining the substantial completion date for the Project, and recommending final payment to the contractor in writing. 12. Revise contract drawings, with the assistance of the City's representative, to provide record drawings of the completed Project. Furnish one set of reproducible drawings, electronic files (AutoCAD 2000i on CD ROM), and two sets of prints of the record drawings to the City. Because data stored in electronic media format can deteriorate or be modified inadvertently or otherwise without authorization of the data's creator, the party receiving electronic files agrees that it will perform acceptance tests or procedures within 60 days, after which the receiving party shall be deemed to have accepted the data thus transferred. Any errors detected within the 60 -day acceptance period will be corrected by the party delivering the electronic files. Engineer shall not be responsible to maintain documents stored in electronic media format after acceptance by the City. When transferring documents in electronic media format, Engineer makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Engineer at the beginning of this Project. The City may make and retain copies of Documents for information and reference in connection with use on the Project by the City. Such Documents are not intended or represented to be suitable for reuse by the City or others on extensions of the Project or on any other project. Any such reuse or modification without written verification or adaptation by Engineer, as appropriate for the specific purpose intended, will be at the City's sole risk and without liability or legal exposure to Engineer or to Engineer's subconsultants. The City shall indemnify and hold harmless Engineer and Engineer's subconsultants from all claims, damages, losses, and expenses, including attorneys' fees arising out of or resulting there from. If there is a discrepancy between the electronic files and the hard copies, the hard copies will govern. 13. Compile, review, and comment on operation and maintenance manuals, which will be provided by Contractor in accordance with the Contract Documents. 14. Assist City staff during start-up of the project. The Engineer shall provide technical support and professional advice regarding any unforeseen problems with the operation and rnaintenance of the Project for a period of 1 year to the City. WELDING AND COATING INSPECTION PHASE 1. Conduct on site visits to provide Quality Assurance Surveillance and observe the progress and quality of the executed work in accordance with the Contract Documents. In performing these services, reasonable measures will be taken to protect the Owner/Engineer against defects and deficiencies in the work of the Contractor. Responsibility for the actual supervision of construction operations or for the safety measures that the contractor takes or should take cannot be guaranteed. 2. HOT proposes to provide an AWS Certified Welding Inspector and NACE Certified Coating Inspector on the referenced project for the City of Round Rock and HDR Engineering. The B-3 objective of this project is to provide quality assurance surveillance of the erection, welding, sandblasting, and painting during the construction of the referenced water tank. Inspection and testing visits will be strategic and at the discretion of the Owner/Engineer. The services to be provided will include the following: 3. Sandblasting and Coating Inspection • Review coating specifications and make comments/recommendations. • Pre -surface preparation inspection. • Measurement of ambient conditions. • Evaluation of compressor and surface preparation equipment. • Determination of surface preparation cleanliness and profile. • Inspection of application equipment. • Witnessing coating mixing. • Inspecting coating application. • Determination of wet film thickness. • Determination of dry film thickness. • Evaluating cleanliness between coats. • Witness contractor conduct holiday testing of the inside coating system. • Evaluate cure. • Prepare a final inspection report to engineer and owner. 4. The inspection methods to be implemented for the sandblasting and coating inspections will consist of visual inspections, mil gauging, holiday testing, profile gauging and atmospheric measuring. All inspections will verify compliance with the AWWA D102-97 and contract specifications. The measurement of air temperature, surface temperature, humidity, dew point, coating thickness and holiday detection will be recorded in an inspectors logbook. The equipment to obtain such measurements will be supplied by HOT. 5. WORK EXCLUDED: Work required for safely accessing the tank is not included in the cost of this project. It will be the contractor's responsibility for providing safe access to all areas of the tank for inspection and testing during the construction. OSHA approved staging will be necessary for the complete access of the tank. 6. The cost for the above mentioned services is based on a $75.00 per hour fee and is estimated for the remainder of the project. If re -inspections are necessary due to contractor performance deficiencies and non-conformance issues during the construction phase, the additional time will be documented and billed at the rate above. B-4 CO C17 LL 0 0 C.0 2 —7 z 0 CO —7 . 1 , ; 1 x X ; I ! I ; ' X U.. —3 x 0 z • 1 0 • . g .a" cr co e 00 :0 O E o o C..) • 0 'glo to; 2 V A: • 0 u),U. a. 7 0 0 0. .- 3 .0 Addendum to Exhibit D RM 1431 2MG Elevated Storage Tank Budget Hours Project Project Senior Project Admin. Task Task Description Principal Manager Engineer Engineer Technician Assist. Cost/Fee Hourly Rates $53.28 552.00 526.00 521.18 Construction Meetings/Site Visit - November 6 1 5340.86 Correspondence and Coordination 12 2 5681.72 Administrative (monthly reports, files, billing, subcontract admin) 6 8 $489.12 Construction Administration Pay Applications 3 Apps 3 1 $181.02 Submittal Review Hours per Shop Drawing Review 1 Shop Drawing Submittals 1 0.5 $63.87 Hours per O&M Manual Review 7 O&M Manuals 8.4 2.1 3.5 5630.88 Hours per Misc, Or Resubmittal 3 Misc and Resubmittal Review (20%) 3 1 1,5 $243.61 Requests for Information and Field Orders Hours per Response 3 Responses 3 1.5 0.75 $253.73 Inspection & Punch List - Substantial & Final 24 1 $1,330.72 Start-up Observation and Advice 4 2 5317.12 Record Drawings - 24 sheets 2 20 $626.55 Close-out Document Review 2 4 5191.28 Labor Totals Total Direct Labor Cost Overhead (175%) Profit (12%) Total Hours 0 74.4 0 7,6 20 22.25 $5,350.49 175% $9,363.35 12% $1,123.60 Total Labor Fee Reimbursable Direct Costs Postage & Delivery Travel Expenses Miscellaneous Printing & Photocopying Printing of Record Sets 515,837.44 5 $40.00 per month 5200.00 lump sum mileage 5140.00 5 $10.00 per month 550.00 5 50.10 per copy 100 copies/mn 550.00 4 Sets Lump Sum $250.00 Total Reimbursable Direct Costs $690.00 SUBCONSULTANTS HOT Inspection Services - Welding and Coatings - Additional Inspection 52,595.00 Total Subconsultants 52,595.00 I Total Estimated Cost to Complete 519,122,44 Estimated Fee Remaining $7,212,44 Amended Fee Increase 511,910.00 D-2 DATE: October 28, 2009 SUBJECT: City Manager Approval — October 30, 2009 ITEM: Consider executing Supplemental Contract No. 2 with HDR, Engineering, Inc. for the RM 1431-2MG Elevated Water Storage Tank. Department: Staff Person: Justification: Water and Wastewater Utilities Michael D. Thane, P.E. - Director of Utilities This Supplemental Contract is for additional quality control and construction administration services required to complete the construction of the R.M. 1431 two -million gallon elevated water storage tank. This work includes general contract administration (site visits, progress meetings, etc.) along with welding and coating inspection. This additional work will be completed over the next 90 days. This project is one of three projects the City is required to complete according to the Emergency Water Supply Interlocal Agreement with Cedar Park. Strategic Plan Relevance: Goal 27.0 "Ensure there is an adequate, affordable and safe water supply." Funding: Cost: $11,910.00 Source of funds: Self -Financed Water Construction Outside Resources: HDR Engineering, Inc. Public Comment: N/A Blue Sheet Format Updated 01/20/04 5/12/2009 Request for City Council/City Manager Action 0 City Council p City Manager./ Submit completed form for all City Manager and City Council approvals Department Name: Water & Wastewater Utilites Contact Person: Chez Gordon 1 Kathy Michna Project Mgr/Resource: Don Rundell For }rtiSrii tsraikinkJ ONLY Received: OCT 2 8 2009 1 Tag#: a ffl-09- 2.117 Original Documents Received: 1 Project Name: RM 1431- 2MG Elevated Water Storage Tank ContractorNendor. HDR Engineering Funding Source: sex-Financadwater construction Project Coordinator Wheel Thane Additional funding Source: Amount: Account Number na Assigned Attorney: Steve Sheets City Council or City Manager Approval Date: Agenda Wording 10/30/2009 11,910.00 Consider executing Supplemental Contract No. 2 with HDR Engineering, Inc. for the RM 1431-2MG Elevated Water Storage Tank Finance Information Is Funding Required? Yes O No Initial Construction Contract Construction Contract Amendment O Change Order # J1jChange in Quantity DUnforeseen Circumstances ED Initial Professional Services Agreement Q Supplemental Professional Service Agreement # 2 O Purchasing/Service Agreement Purchase Order Item(s) to be purchased Other (Please clearly identify action on lines below) Amount 11,910.00 FINANCE WA Approved El a Finance/CIP Date El CD Finance/Acct Date CICI Purchasing Date 00 Budget Date APPROVALS (to be completed ONLY by Finance) Final Finance Approval Required Approved Finance Director Date Once approvals have been obtained. please forward the RFA. blue sheet, backup information and originals to City Secretary, Sara White. ITEMS WILL NOT BE PLACED ON THE COUNCIL AGENDA WITHOUT FINANCE AND LEGAL APPROVAL PRIOR TO SUBMISSION. Required for Submission of ALL City Council and City Manager Items Project Mgr. Signature: Date: Dept. Director Signature: 1")14.•.-- Date: 'City Attomey Signature: G, Date: City Manager Signature: w'/" ��r! Date: in -30-09 10-30-C Oily Attorney signature is required for all items. REVISED 10/26/2009 5/12/2009 Request for City Council/City Manager Action ® City Council Eal City Manager Submit completed form for all City Manager and City Council approvals. Department Name: Water & Wastewater Utilites ForA Received: Tag #: Original Documents Received: Project Name: RM 1431 - 2MG Elevated Water Storage Tank Contact Person: Chaz Gordon / Kathy Michna ContractorNendor: HDR Engineering Project Mgr/Resource: Don Rundell Funding Source: Self -Financed Water Construction Project Coordinator: Michael Thane Additional funding Source: Assigned Attorney: Steve Sheets Amount: Account Number: na City Council or City Manager Approval Date: Agenda Wording 10/30/2009 11,910.00 Consider executing Supplemental Contract No. 2 with HDR Engineering, Inc. for the RM 1431-2MG Elevated Water Storage Tank Finance Information Is Funding Required? Yes n No Initial Construction Contract Construction Contract Amendment # Change Order # =Change in Quantity =Unforeseen Circumstances Initial Professional Services Agreement xx Supplemental Professional Service Agreement # 2 Purchasing/Service Agreement Purchase Order Item(s) to be purchased Other (Please clearly identify action on lines below) Amount 11,910.00 APPROVALS (to be completed ONLY by Finance) FINANCE Final Finance Approval Required N/A Approved CI E Finance/CIP B. Ramsey Date 10/28/2009 Finance/Acct E. Wilson Date 10/28/2009 Purchasing EE Bowden Date 10/28/2009 Budget P. Bryan Date 10/27/2009 Approved x Cheryl Delaney 10/28/2009 Finance Director Date Once approvals have been obtained. please forward the RFA. blue sheet back up information and originals to City Secretary, Sara White. ITEMS WILL NOT BE PLACED ON THE COUNCIL AGENDA WITHOUT FINANCE AND LEGAL APPROVAL PRIOR TO SUBMISSION. Required for Submission of ALL Citv Council and City Manager Items Project Mgr. Signature: Dept. Director Signature: *City Attorney Signature: City Manager Signature: Date: Date: Date: Date: *City Attorney signature is required for all items. REVISED 10/28/2009 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: PW/Utilities Project Mgr/Resource: Don Rundell []Council Action: ORDINANCE Agenda Wording Project Name: RM 1431 - 2 MG Elevated Water Storage Tank ContractorNendor: HDR Engineering, Inc. RESOLUTION City Manager Approval CMA Wording Consider executed Supplemental Contract No. 2 with HDR Engineering, Inc. for the RM 1431 - 2 MG Elevated Water Storage Tank. Attorney Approval Attorney Notes/Comments Date i(, ! o� O:\wdox\SCCInts10199146321MiSC100174254.XLS Updated 6/3/08