CM-09-10-222STATE OF TEXAS
COUNTY OF WILLIAMSON
SUPPLEMENTAL CONTRACT NO. 1
TO CONTRACT FOR ENGINEERING SERVICES
FIRM: JACOBS ENGINEERING GROUP, INC. ("Engineer")
ADDRESS: 2705 Bee Cave Roacl, Suite 300, Austin, Texas 78746
PROJECT: Due Diligence Analysis for the BCRUA's Deep Water Intake Facility Site
This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between
the CITY OF ROUND ROCK, (hereinafter referred to as "Round Rock"), the CITY OF CEDAR
PARK, (hereinafter referred to as "Cedar Park"), the CITY OF LEANDER, (hereinafter referred
to as "Leander"), (all collectively referred to hereinafter as "Owners") and Jacobs Engineering
Group, Inc., hereinafter called the "Engineer".
WHEREAS, the Owners and Eng.ineer executed a Contract for Engineering Services, hereinafter
called the "Contract", on the 9t' day of April, 2009 for the Due Diligence Analysis for the
BCRUA's Deep Water Intake Facility Site Project in the amount of $229,729.00; and
WHEREAS, it has become necessary to amend the Contract to modify the provisions for the
scope of services and to increase the compensation by $35,000.00 to a total of $264,729.00; and
NOW THEREFORE, premises considered, the Owners and the Engineer agree that said
Contract is amended as follows:
1.
Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set
forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall he amended as
set forth in the attached Addendum To Exhibit C.
II.
Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by
$35,000.00 the lump sum amount payable under the Contract for a total of $264,729.00, as
shown by the attached Addendum to Exhibit D.
IN WITNESS WHEREOF, the Owners and the Engineer have executed this Supplemental
Contract in duplicate.
Supplemental Contract
0199.7096/ 173825
OA- (o -22-1
Rev,12/01/08
84275
CITY OF ROUND ROCK, TEXAS APPROVED AS TO FORM:
Bv:
ATTEST:
By:
(Ctri-tal- L Sir 1j
jameb-R,Nuse.,P.E. Stdphan L. Sheets, City At ey
Sara L. White, City Secretary
Supplemental Contract
0199.7096/ 173825
2
Rev.12/01/08
84275
CITY OF CEDAR PARK, TEXAS
By:
Robert S. Ley on, Mayor
ATTEST:
By
LeAnn Quinn, City Secretary
Supplemental Contract
0199.7096/173825
3
(j4-OK--to-222
APPROVED AS TO FORM:
Charles Rowland, City orney
Rev.12/01 /08
84275
CTTY I LEANDER, TEXAS APPR • VED AS TO FORM:
kl • 440ne
By:
J
Cowman, Mayor
ATTE
By: /i
iduk
Debbie Haile, City Secretary
pima -Granger, Attorney
1v11!v1 LEt A'
JACOBS ENGINEERING GROUP, INC.
By: f
1-Actr"-.
Supplemental Contract
0199.7096/ 173825
5
(Printed Name)
(Title)
Rev.12/01/08
84275
ADDENDUM TO EXHIBIT B
ENGINEERING SERVICES
SCOPE OF WORK
The objective of this supplemental agreement is to perform engineering services to
identify the preferred deep intake elevation based on LCRA lake level projections and
evaluate options to extend the intake to this preferred elevation. Sites that will be
considered for the intake include:
• Site 2
• Site 4
• Sandy Creek WTP with tunnel to Starnes Island or Site 5
• Temporary floating intake installed during low lake levels to pump up to a
higher intake elevation located at Site 2 and Site 4.
Specific services included in this Supplemental Agreement No. 1 are described herein:
1. Review and document near and long-term LCRA lake level projections to identify
strategic elevations for deep water intake to minimize risk during drought
conditions,
2. Identify the deepest potential elevation for an intake at Sites 2 and 4, and Starnes
Island/Site 5.
3. Evaluate the feasibility and cost of extending the intake to the deeper elevations at
Sites 2, 4, and 5. Cost estimates will include a "bottom-up" estimate to confirm
tunneling costs. Feasibility will include evaluation of schedule, access, chemical
feed points, valve operation, screen cleaning, tunnel liners, electrical requirements
and availability, and risk assessment.
4. Perform hydraulic evaluation using a 78 -inch raw water pipeline to determine if
1) the pressures in the pipeline at peak flow, 2) required pump sizing, 3) potential
peak flow delivered, and 4) the long-term energy costs vs, capital costs.
5. As an alternative, evaluate the cost and feasibility of temporary
pumping from "deep water" to lowest intake during extreme drought conditions at
Sites 2 and 4.
6. Generate a Technical Memorandum documenting the findings and
recommendations related to extending the intake to a deeper elevation.
ADDENDUM TO EXHIBIT C
WORK SCHEDULE
Attached Behind This Page
&
\
/ j
Wed 7/8/09
El m
Wed B/19/09
4 wks Thu 7/23/
Floating Intake Feasibility Analysis
87§ 2£ 2#¥ a
: ` k 4 ±
; a 4
4 / /) % 4 )
, CO
) k / k\ f
f \ \ \ \ } } 2
G
Due Diligence. Intake
)
}
k
0 0
BCRUA Review
Draft 2 - Revised Site Pla
BCRUA Review
Final Site Plan
0
Amendment #1
Wod 9/30/09
T.
( 0 \ \ \
) / / 7 }-
Generate Maps and Key Ft
Meet with DDC and disc
§
Analyze Options
Meet w/DOC with Preliminary Results
m
Wed 9/16/09
Work w/PEC on Po
m
Wed 10/14/09
�
Wod 10/14/09 Tue 10/20/09
Amendment #1 Tech Memo
\ \ 0
Draft Due Diligence Report
}
0
Presentation to BCRUA Board
}
co
n ; k
5'
2
ADDENDUM TO EXHIBIT D
FEE SCHEDULE
HOURLY SUMMARY
Table 1 of 2
Employee Hours Salary Direct Labor Cost
Category
PM 20 $71.15 $1,423.00
Sr. PE 32 $66.41 $2,125.12
PE 42 $52.07 $2,186.94
ETT 38 $29.34 $1,114.92
CADD Designer 6 $43.17 $259.02
RPLS 0 $50.00 $0.00
Clerical/Acct 6 $24.00 $144.00
Subtotal $7,253.00
MAXIMUM COST
Table 2 of 2
LABOR COST
Phase Labor Overhead Total -Labor Fixed Fee- Total Cost
Percent Plus Overhead Percent
Phase 2 — Deep $7,253 135% $17,044.55 12% $19,089.89
Intake Due
Diligence
DIRECT COST
Expense Rate Quantity Total
Sub Consultants $15,000 1 815,000
Expenses
Miscellaneous $375.21 1 Job $375.21
Printing $300 1 Job
$300
Travel $0.58 405 $234.90
Total Expenses $910.11
Total Direct Costs $15,910.11
Total Maximum Costs $35,000.00
DATE: October 23, 2009
s
SUBJECT: City'Couneil Approval — November 12, 2009
ITEM: Consider a resolution authorizing the Mayor to execute Supplemental Contract
No. 1 with Jacobs Engineering Group, Inc., for the Due Diligence Analysis for the
BCRUA's Deep Water Intake Facility Site project.
Department:
Staff Person:
Water & Wastewater Utilities
Michael D. Thane, Director of Utilities
Justification:
The Deep Water Intake facility will be able to provide 141.7 million gallons per day (mgd) of raw
water to the Cities of Round Rock, Cedar Park, and Leander. The intake facility will pump water
from Lake Travis to the regional water plant, as well as to the existing Cedar Park and Sandy
Creek water treatment plants. Based on LCRA's long-term lake level projections, which are
being used to determine strategic elevations for the deep water intake site, the Parties of the
Regional Water Supply System agree it is necessary to evaluate these deeper water options.
This Supplemental Contract No. 1 is for the evaluation of several options to extend the deep
water intake screen location to the 520 foot mean sea level contour of Lake Travis.
The total cost of this Supplemental Contract No. 1 is $35,000. The City of Round Rock's
percentage is 28.79%, which is $10,076.50. With this supplemental contract, Jacobs revised
contract amount is $264,729, with Round Rock's total share being $76,215.48.
Strategic Plan Relevance:
Goal 27.0 "Ensure there is an adequate, affordable and safe water supply."
Funding:
Cost: $35,000 with Round Rock's share being $10,076.50
Source of funds: Regional Water Fund
Outside Resources: Cities of Cedar Park and Leander
Jacobs Engineering Group, Inc.
Public Comment: Because the intake improvements may be located in the Village of
Volente area, the Cities have conducted several meetings with the residents to discuss the
scope of the due diligence services.
5/12/2009
Request for City Council/City Manager Action
City Council ��_r� City Manager
Submit completed form for all City Manager and City Council approvals.
Department Name: Water & Wastewater Utilites
For Adrt tGfilltj s LY
Received: 2/l, . 2 r. 7i,109
Tag#: 2..
Original Documents Received:
Project Name: Due Diligence Aneysis for the BCRUA's Deep Water Intake Faa6ty Site
Contact Person: Chaz Gordon I Kathy Michna ContractorNendor, Jacobs Engineering Group, Inc.
Project Mgr/Resource:
Project Coordinator. Wheel Thane
Assigned Attorney: Steve Sheets
City Council or City Manager Approval Date:
Funding Source: Regional Water Fund
Additional funding Source:
Amount:
Account Number ne
11/1212009
10,076.50
Agenda Wording
Consider a resolution authorizing the Mayor to execute Supplemental Contract No. 1 with Jacobs Engineering Group, Inc., for the Due Diligence Analysis for the BCRUA's Deep
Water Intake Facility Site project.
Finance Information
Is Funding Required? Yes O No Ell
Amount
Initial Construction Contract
Construction Contract Amendment
Change Order
J1jChange in Quantity JJUnforeseen Circumstances
Initial Professional Services Agreement
Supplemental Professional Service Agreement # 1 10,076.50
ED Purchasing/Service Agreement
Purchase Order
Item(s) to be purchased
Other (Please dearly identify action on lines below)
APPROVALS
(to be completed ONLY by Finance)
FINANCE Final Finance Approval Required
N/A Approved Appy
E Finance/CIP Date
Finance/Acct Date Finance Director Date
EJa Purchasing Date
Q Budget Date
Once approvals have been obtained. please forward the RFA, blue sheet. back up information and originals to City Secretary, Sara White.
ITEMS WILL NOT BE PLACED ON THE COUNCIL AGENDA WITHOUT FINANCE AND LEGAL APPROVAL PRIOR TO SUBMISSION.
Required for Submission of ALL City Council and City Manager Items
Project Mgr. Signature:
Date:
Dept. Director Signature:``'_ J)�
=( - i n Date: acs /w via �
F
d
'City Attorney Signature: �` Date: 10- 30 " CY'l
City Manager Signature: '��, ) Date: ` O ''2/O
Atfomey signature is required for all items.
REVISED 10/20/2009
5/122009
Request for City CounciUCity Manager Action
El City Council n City Manager
Submit completed form for all City Manager and City Council approvals.
Department Name: Water & Wastewater Utilites
Contact Person: Chaz Gordon / Kathy Michna
Project Mgr/Resource:
Project Coordinator:
Michael Thane
Assigned Attomey: Steve Sheets
City Council or City Manager Approval Date:
For Administration Use ONLY
Received:
Tag #:
Original Documents Received:
Project Name: Due Diligence Analysis for the BCRUA's Deep Water Intake Facility Site
ContractorNendor: Jacobs Engineering Group, Inc.
Funding Source: Regional Water Fund
Additional funding Source:
Amount:
Account Number: na
11/12/2009
10,076.50
Agenda Wording
Consider a resolution authorizing the Mayor to execute Supplemental Contract No. 1 with Jacobs Engineering Group, Inc., for the Due Diligence Analysis for the BCRUA's Deep
Water Intake Facility Site project.
Finance Information
Is Funding Required'? Yes EI No
Initial Construction Contract
Construction Contract Amendment
Change Order
flChange in Quantity
Initial Professional Services Agreement
Supplemental Professional Service Agreement
Purchasing/Service Agreement
Purchase Order
Item(s) to be purchased
Unforeseen Circumstances
El
Other (Please clearly identity action on lines below)
Amount
10,076.50
APPROVALS
(to be completed ONLY by Finance)
Final Finance Approval Required
FINANCE
N/A Approved
Finance/CIP B. Ramsey Date 10/28/2009
Finance/Acct Date
Approved
Cheryl Delaney 10/28/2009
Finance Director Date
LPurchasing Date
Budget Date
Once approvals have been obtained, please forward the RFA. blue sheet, back up information and originals to City Secretary, Sara White.
ITEMS WILL NOT BE PLACED ON THE COUNCIL AGENDA WITHOUT FINANCE AND LEGAL APPROVAL PRIOR TO SUBMISSION.
Required for Submission of ALL City Council and City Manager Items
Project Mgr. Signature:
Dept. Director Signature:
*City Attorney Signature:
City Manager Signature:
Date:
Date:
Date:
Date:
*City Attorney signature is required for all items.
REVISED 10/28/2009
LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION
Required for Submission of ALL City Council and City Manager Items
Department Name: utilities
Project Mgr/Resource: Don Rundell
[]Council Action:
ORDINANCE
Agenda Wording
XX
Due Diligence Analysis for the BCRUA's Deep
Project Name: Water Intake Facility Site
ContractorNendor: Jacobs Engineering Group, Inc.
RESOLUTION
Consider a resolution authorizing the Mayor to execute Supplemental Contract No. 1 with Jacobs Engineering Group, Inc. for the
Due Diligence Analysis for the BCRUA's Deep Water Intake Facility Site Project.