Loading...
CM-09-12-237corrpro® An Insituform• Company ROUND ROCK, CITY OF WATER SYSTEM SUPPORT ADMINISTRATION 2008 ENTERPRISE DRIVE Round Rock, TX 78664 ATTN: MR. BUDDY FRANKLIN ANNUAL SERVICE AGREEMENT WATER STORAGE TANK / CLARIFIER CATHODIC PROTECTION SYSTEM(S) www.corrpro.com Corrpro engineering and maintenance services for effective and economical corrosion control in accordance with AWWA D 104 Appendix "C". Capacity/Structure 1,250,000 ELEVATED TANK 1,250,000 ELEVATED TANK 2,700,000 COMPOSITE ELEVA 1,250,000 ELEVATED TANK Designation/Location HIGH COUNTRY TANK ROUTE 81 TANK "BARTON HILL" CHISHOLM VALLEY TANK System No. 55284 55650 55886 55283 P 0 Box 721 Medina, OH 44256 Phone: 330-725-6681 Fax: 330-723-6065 CONTRACT NO. 0036325 CUSTOMER CW000405 Plan C C C C Amount $ 620.00 $ 620.00 $ 620.00 $ 620.00 All service plans include one site visit per contract term to include 1 thru 5. Additional plan services as noted below 1. Tank -to -Water potential profile within tank to monitor and verify effectiveness of system on submerged surface of tank. 2. Electrical Measurements to test anode and reference cells. 3. Inspect, test, and clean rectifier, controls, meters, contacts,wiring and connections. Replace fuses as required. 4. Adjust system for optimum corrosion control on submerged metal surface of tank. 5. Submit report with all data obtained, evaluation of data, and recommendations for continued performance. Plan "A" Service: Includes one annual inspection as indicated including repair and/or replacement of anodes and rectifiers as required. Plan "B" Service: Includes one annual inspection as indicated including repair and/or replacement of anodes as required. Plan "C" Service: Includes only service listed in items 1 thru 5 above. Plan "AA" Service: Includes two inspections annually as indicated including spring installation and fall removal of anodes as well as repair and/or replacement of anodes and rectifiers as required Plan "BB" Service: Includes two inspections annually as indicated including spring installation and fall removal of anodes as well as repair and/or replacement as required Plan "CC" Service: Includes two inspections annually as indicated including spring installation and fall removal of anodes. Notes: Price reflects multiple tank discount. For contract period 10/01/09 through 9/30/10. Total lump sum of this agreement is $ 2,480.00 Payment is due at the start of the contract period. Additional repairs or replacements of system components would be subject to the subscriber's approval. This agreement does not effect in any way the original warranty on the system(s) described above. Corrpro agrees to maintain General Liability Insurance and Workmen's Compensation Insurance during the annual service period. The subscriber agrees to indemnify and hold harmless Corrpro for any damages arising out of the performance of this contract which is not covered by the foregoing insurance. Client and Corrpro agree that neither party shall be responsible to the other party for incidental, consequential, indirect, punitive, or exemplary damages with respect to any claims, disputes, or other matters in question arising out of or relating to this Agreement or its termination, and Client and Corrpro hereby waive such damage. Corrpro's total liablility to Client shall not exceed the amount of compensation actually paid for the services, products, or materials giving rise to the claim. Client and Corrpro waive all rights against each other and any of their subcontractors, agents, and employees for all loss or damage to property or its loss of use. Please include Job Site Contact Person: CORRPRO By: Signature: Ellen Hutcheson/Customer Service Printed nam Date: 7/16/09 Date: Subscriber to mail one signed copy to CORRPRO at the above address. Phone number: SUBSCRIBER'S ACCEPTANCE NrOci- 13-v DATE: December 2, 2009 SUBJECT: City Manager Approval — December 4, 2009 ITEM: Consider executing the Annual Service Agreement Water Storage Tank/Clarifier Cathodic Protection System(s) with CORRPRO. Department: Staff Person: Water and Wastewater Utilities Michael D. Thane, P.E. — Director of Utilities Justification: This is an annual service agreement which provides for the inspection of the cathodic protection corrosion control equipment. CORRPRO Waterworks will evaluate the corrosion control system in four of the City's elevated water storage tanks. The intent of this agreement is to prevent elevated water storage tanks from premature deterioration. The term of this contract is October 1, 2009 thru September 30, 2010. Strategic Plan Relevance: Goal No. 27.0 "Ensure there is an adequate, affordable and safe water supply." Funding: Cost: $2,480.00 Source of funds: Utility Fund 5283-200-42000 Outside Resources (if applicable): CORRPRO Waterworks Public Comment (if applicable): N/A UPDATED APRIL 2008 10.1909 Request for City Council/City Manager Action ® City Council CO City Manager Submit completed form for all City Manager and City Council approvals. Department Name: Water and Wastewater Utilities Contact Person: Chaz Gordon / Kathy Michna Project Mgr/Resource: Buddy Franklin Project Coordinator. Assigned Attorney: Michael Thane City Council or City Manager Approval Date: Agenda Wording For Adis Vjg 611LY /� DEC 0 2 2009 > Tao:GM- 09-12- 237 Original Documents Received: Received: Cathodic Protection Corrosion Control System Services Project Name: Agreement ContractorNendor: CORRPRO Funding Source: Utility Fund Additional funding Source: Amount: 12/4/2009 Account Number 5283-200-42000 2,480 Consider executing the Annual Service Agreement Water Storage Tank/Clarifier Cathodic Protection System(s) with CORRPRO. Finance Information D 0 a Is Funding Required? Initial Construction Contract Construction Contract Amendment Change Order Change in Quantity Initial Professional Services Agreement Supplemental Professional Service Agreement Purchasing/Service Agreement Purchase Order Item(s) to be purchased Yes No n Unforeseen Circumstances Other (Please clearly identify action below) Amount 2,480 FINANCE WA Approved EJ EJ FinanceICIP Date D D Finance/Acct t ate ElQ Purchasing Date D D Budget Date APPROVALS (to becompleted ONLYbyFinance) Final Finance Approval Required APMoved I 1 Finance Director Once approvals have been obtained please forward the RFA, blue sheet, backup information and originals to City Secretary, Sara White. ITEMS WILL NOT BE PLACED ON THE COUNCIL AGENDA WITHOUT FINANCE AND LEGAL APPROVAL PRIOR TO SUBMISSION. Required for Submission of ALL City Council and City Manager Items Project Mgr. Signature: Dept. Director Signature: 'City Attorney Signatu City Manager Signature: Date Date: Date: /ibcla 12-14-01 Date: Date: 12409 *City Attorney signature is required for all items. REVISED 11/30/2009 10 19 09 Request for City Council/City Manager Action IM City Council EU City Manager Submit completed form for all City Manager and City Council approvals. Department Name: Water and Wastewater Utilities Project Name: Agreement For Administration Use ONLY Received: Tag #: Original Documents Received: Cathodic Protection Corrosion Control System Services Contact Person: Chaz Gordon / Kathy Michna Project Mgr/Resource: Buddy Franklin Project Coordinator: Assigned Attorney: Stephan Sheets Michael Thane City Council or City Manager Approval Date: A'enda Wordin Consider executing the Annual Service Agreement Water Storage Tank/Clarifier Cathodic Protection System(s) with CORRPRO. ContractorNendor. CORRPRO Funding Source: Utility Fund Additional funding Source: Amount: Account Number 5283-200-42000 12/4/2009 2,480 Finance Information Is Funding Required? Yea Initial Construction Contract Construction Contract Amendment C1=1 Change Order EIChangein Quantity Unforeseen Circumstances Initial Professional Services Agreement Supplemental Professional Service Agreement fJPurchasing/Service Agreement Purchase Order Item(s) to be purchased lEj Other (Please clearly identify action below) FINANCE N/A Approved 0 C Finance/CIP B. Ramsey Finance/ACCt E. Wilson Purchasing EEBowden Budget P. Bryan No APPROVALS (to be completed OINLYbyfinance) Final Finance Approval Required Amount 2,480 Date 12/2/2009 Date 12/2/2009 Date 12/2/2009 Date 12/1/2009 APpr Cheryl Delaney Finance 12/2/2009 Date Once approvals have been obtained please forward the RFA,;btue sheet, back up information and originals to City Secretary, Sara White. ITEMS WILL NOT BE PLACED ON THE COUNCIL AGENDA WITHOUT FINANCE=AND LEGAL APPROVAL PRIOR TO SUBMISSION. Reuired for Submission of ALL C Council and C' Liana . er Items Project Mgr. Signature: Dept. Director Signature: 'City Attorney Signature: City Manager Signature: Date: Date: Date: Date: City Attorney signature is required for at items. REVISED 12/2/2009 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: PUBLIC WORKS Project Mgr/Resource: BUDDY FRANKLIN JCouncil Action: 1� ORDINANCE Agenda Wording CATHOTIC PROTECTION. CORROSION Project Name: CONTROL SYSTEM SERVICES AGREEMENT ContractorNendor: CORRPRO RESOLUTION City Manager Approval CMA Wording Consider executing the Annual Service Agreement Water Storage Tank / Clarifier Cathodic Protection System(s) with CORRPRO. Attorney Approval ❑v Attorney Notes/Comments ff Date //, ? o:IwdoxlSCClnls1D125109D21MISC100173383 Updated 6/3/08