CM-2015-1005 - 12/18/2005Contract Quantity Adjustment/Change Order �exumnoca n'.ns M awls De artment: p General Services Project Name: Rock N River PAC Expansion City Project ID Number Paget of3 Date: 1�8 1515 Change Order/Quantity Adjustment No. 3 Iustification Changes In the project not considered during planning and design phase: 1. Electrical service to food truck area for vendor service. 2. Landscape and Irrigation changes to separate reuse water outside fenced area and potable Irrigation around pool area, SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)): Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan, Adj./Change Order: New Contract Time: Submitted for Approval Amount $6,728,887.08 $0.00 $0.00 $6,728,887.00 $79,881.50 $47,534.33 $127,415.83 $6,856,302.831 $127,415.83 % Change mm Approvals Printed Name, Title, Gbmpany Date 0.01 0.01 0.02 9 LILY Project I --- Manager: ,Manager: Chad McDowell General Services Director CORR naturePrinted Name, Title Date Mayor/qty ,/ Manager •� I SignaturePrinted Name, Tide L.r Date oN 5,14�1ti � 1 Contract Quantity Adjustment/Change order poukn anct uc.+s MV, WIS Project Name: Rack N River FAC Expansion Quan. Adj.Xhange Order No.: f"han.y,ft nrAer ns" Page 2 of 3 Item # Item Description Unit Unit Price Amount Contract Time Adjustment p 1 Electrical Food truck and service area i $30,602.09 $30,602.09 2 Irrigation separation reuse/potable $16,932.24 $16,932.24 0.00 0.00 0.00 0.00 To -.001 $0.00 $0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 $0.05 0.00 0.50 $0.00 TOTALS:l $47534.3Y Rock N River FAC Expansion Change Order #3 Summary Date: 12/08/2015 Change Order #3 to the contract with Chasco includes changes to the current phase of construction. These changes include: Electrical Service to Food Truck Area: During the planning and design phase it was not considered that the food truck vendors would need electrical power. After a brief discussion by the construction team it was decided that it would better to provide this service rather than have the vendors use generators. The closest electrical panel would not support the 100amp load required; however, the existing Rock N River pump house electrical panel could support the additional electrical load. The conduit run, panels, gear, shut off, 20amp twist lock receptacles and labor are included. Cost: $30,602.09 Landscape and Irrigation- Reuse to Potable: During the planning and design phase of the project the existing reuse irrigation system in Old Settlers Park was not discussed. With the current design this reuse system would tie into irrigation areas in direct contact with the pool patrons. To have reuse water irrigation in these areas could cause possible contamination of the swimming pools and be a safety hazard. To draw a clear distinction between reuse and potable irrigation water it was decided to have all irrigation inside pool area on potable water and all irrigation outside fenced area on the existing reuse. For additional safety and to prevent future connection to reuse, the dividing line between reuse and potable is the parking lot of the facility. These changes include irrigation pipe, layout, valves, heads and fittings, sleeves under existing parking lot and labor impacting approximately one acre. j Cost: $16,932.24 r Total this Change Order: $47,534.33 Contingency Original $369,713.00 Betterment $100,000.00 0 /C. -N /OvS To Date (not including Change Order) $212,853.13 $51,852.37 C�-I-Z CO Change Order Project: 20-16039 ROCK N' RIVER FAC EXPANSION 3300 PALM VALLEY BLVD, ROUND ROCK, TX 76665 To Contractor: CHASCO CONSTRUCTORS P.O. BOX 1057 ROUND ROCK, TX 78680 Change Order: CO 1103 Date: 11/24120-15 Architect's Project: The Contract Is changed as follows: Electrical Changes, Landscape & Irrigation Changes - Reference CP 007 and CP 013 113Elecld Electrical Changes for Change Order No. 03 Areas 3 E and 6A CP -007 Landscape & Irrigation Changes The original Contract Amount was Net change by previously authorized Change Orders The Contract Amount prior to this Change Order was The Contract will be inaessed by this Change Order in the amount of The new ContraclAmount Including this Change Order will be The dale of Substantial Completion as of the date of this Change Order therefore is NOT VALID UNTIL SIGNED BY THE DAVIS & DAVIS. INC. ARCHITECT 1805-A W. PARK ROW OR ARLINGTON, TX 76013 CONTRACT AND OWNER. CHASCO CONSTRUCTORS CONTRACTOR P.O. BOX 1057 ROUND ROCK, TX 78680 P.O. DOX 1067 ROUND ROCK, TX 78860 Ph :512.244.0800 Total: CITY OF ROUND ROCK OWNER 212 Commerce Blvd ROUND ROCK, TX 78664 Ansfum) (Signature) (S7gnetum) $30,602.09 $16,932.24 $47,534.33 $6,728,887.00 $58,505.23 $6,785,392.23 $47,534.33 $6,832,926.56 RX Bass Electric, Inc. 1200 E FM 2410 * PO Box 2464, Harker Heights, TX 78648 Phone: 264-698.8761 * Fax 254.698-3411 * www.basselecAdo.com RIO 3 Customer Change Request: CP#13 Project: Rock N River Date Submitted: 11/3/2016 Dale Requested: Contractor: Chasco Description of Change: Area 3,4,6.8, & 9 Insjall 100 amp sub panel on container building for Container Building and 4 60 amp twist lock receptacles and OFCI. No cutting and patching. No concrete work Amount Material $ 8,896.66 Equipment Trencher $ 770.00 Subtotal Material and Equipment $ 9,465.65 Labor (Includes Burden) # of hours Standard Premium Labor - Electrician 247.16 hours x tabor $ 62.00 $ 78.00 $ 12,861.84 Miscellaneous . Field Supervision 12.4 hours x tabor $ 68.68 $ 87.84 $ 723.85 Drafting 0 hours x labor $ 62.00 $ 78.00 Fuel Costs 0 mks x mHeage rate $ 0.41 Freight $ 8,896.85 X.03 O&M Manuals / As built drawings Miscellaneous Material $ 8,896.86 X.05 $ 434.78 Warranty Reserve $ 81895.85 X.02 $ 173.91 Testing $ 12,851.64 X.02 $ 267.03 Storage Costs Small Tools $ 12,851.64 x .o2 $ 267.03 Sales Tax (Equipment Only) $ 770.00 X.0825 $ 83.63 Dlrect Costs $ 24,227.23 Overhead 10% $ 2,422.72 Profit $ _ Subtotal $ 28,849.95 Bond Premium 1% $ 286.60 Total Cost $ 26,916.46 Subcontractor Overhead 16% $ _ Profit 10% S _ $ 28,918.45 Extension of time required is Q days. This proposal is for acceptance within 10 days and Is subject to escalation thereafter or subject to voidance, SUBMITTED BY: TITLE: DATE: Robert Eno Supervisor/ Project Manager 11/3/2015 ACCEPTED BY: TITLE: DATE: today, tomorrow, tho future RK Bass Electric Inc Ate, PR RK# 3 . ESTIMATE SCHEDULE Date: 11/3/2016 QUANTI' DESCRIPTION MATERIAL MATERIAL LABOR LABOR UNIT EXTENSION UNIT EXTENSION 90 1 Rigid 3.37 303.16 0.086 7.74 10 2 Rigid 8.97 89.87 0.123 1.23 400 1 PVC 0.40 180.00 0.076 30.40 260 2 PVC 0.86 216.09 0.106 26.50 1600 10 THHN 0.22 352.00 0.010 15.23 1600 8 THHN 0.36 669.30 0.012 19.04 260 6 THHN 0.66 137,36 0.016 3,88 1000 2/0 THHN 2.86 2848.02 0.032 32.00 8 1 Rigid 90 5.77 46.18 0.397 3.18 3 2 Rigid 90 14.17 42.61 0.794 2.38 4 11/4 PVC'46 1.30 5.20 0.340 1.38 2 2 PVC 46 2.68 5.36 0.695 1.19 8 1 Rigid Conn 1.79 14.35 0.190 1.62 2 2 Rigid Conn 68.46 118.92 0.476 0.96 4 1" Rigid Coup 0.98 3.90 0.272 1.09 2 2 Rigid Coup 2.03 4.07 0.348 0.70 8 1 FA 0.44 3.65 0.261 2.01 2 2 FA 0.88 1.72 0.353 0.71 8 1 EMT Strapt 0.26 2.08 0.024 0.19 2 2 EMT Strap 0.96 1.92 0,036 0.07 4 WP J Box 4.76 19.03 0,794 3.18 1 60 Amp Disconnect 279.50 279.60 4.140 4.14 4 60 Amp Rec 32.50 130.00 0.886 3.46 4 OFI Outlet 14.63 68.60 0.353 1.41 4 Milbank U5200 Truck Pedestal 677.46 2709.82 2.000 8.00 4 WP Cover 7.49 29.95 0.169 0.64 640 Trenching 0.110 69,40 2 SP 20 A Brkr Eaton 16.36 32,70 0.500 1.00 6 DP 60 A Brkr 27.00 136,00 0.962 4.76 1 100 amp 3p WP panel no main 602.00 502.00 8.000 8.00. 1 100 3pole.eaton breaker 98.80 98,80 2.000 2.00 Total 8695.65 247.15 today, tomorrow, the future (- SosoS eO 4500 E, Palm Valley Blvd F I 11� Sta. 308-63 !f rr',r, Round Rock, TX 78665 lift J 512-680.9942 October 13, 2015 ROCK N RIVER, FAC Expansion Proposed Change Order We hereby propose to fumish all labor and materials necessary for the completion of the Irrigation modifications and additions as requested. CYAN Existing reuse Irrigation converted to potable water by connecting to the proposed Irrigation system. Add $4,210.00 Materials $2,050.00 Labor $2,160.00 RED Proposed modifications needed to connect BLUE and CYAN and ensure the reuse system is completely disconnected from the new potable water system. (excludes cutting and patching existing concrete or asphalt) Add $6,989.00 �^ Materials $3,628.00 Labor $3,361,00 YELLOW Add additional heads, pipe, fittings and valves to provide full coverage. Add $3,780.00 Materials $2,105,00 Labor $1,675.00 All material is guaranteed to be as specified, and the above work to be performed In accordance with the dmwtngs and spaclficelions, and to be completed Ina substantial workmanlike manner. Payment lobe made as per draw dale. Any ultemllon ordevlatlon from the above speclllcatlmu Involving care casnwlll become an antra charge war and above this Proposal. Respectfully submitted, Clark A. Carter Per: Texas Ll #4716 Irrigation in Texas is regulated by the Texas Commission on Environmental Quality (TCEQ) (MC -178), P.O. Box 13087, Austin, Texas 78711-3087. TCEQ s web site Is: www.tceq.state.tx.us. City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change order No.3 with Chasco Constructors for the Rock 'N River FAC Expansion Project Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 12/18/2015 Dept Director: Chad McDowell Cost: Indexes: Attachments: laf .pdf Department: General Services Department Text of Legislative File CM -2015-1005 Consider executing Quantity Adjustment/Change order No.3 with Chasco Constructors for the Rock'N River FAC Expansion Project Date: 12/08/2015 Change Order #3 to the contract with Chasco includes changes to the current phase of construction. These changes include: Electrical Service to Food Truck Area: During the planning and design phase is was not considered that the food truck vendors would need electrical power. After a brief discussion by the construction team it was decided that it would better to provide this service rather than have the vendors use generators. The closest electrical panel would not support the 100amp load required; however, the existing Rock N River pump house electrical panel could support the additional electrical load. The conduit run, panels, gear, shut off, 20amp twist lock receptacles and labor are included. Cost: $30,602.09 Landscape and Irrigation- Reuse to Potable: During the planning and design phase of the project the existing reuse irrigation system in Old Settlers Park was not discussed. With the current design this reuse system would tie into irrigation areas in direct contact with the pool patrons. To have reuse water irrigation in these areas could cause possible contamination of the swimming pools and be a safety hazard. To draw a clear distinction between reuse and potable irrigation water it was decided to have all irrigation inside pool area on potable water and all irrigation outside fenced area on the existing reuse. For additional safety and to prevent future connection to reuse, the dividing line City of Round Rock Page 1 Printed on 12/17/2015 Agenda Item Summary Continued (C*2015-1005) between reuse and potable is the parking lot of the facility. These changes include irrigation pipe, layout, valves, heads and fittings, sleeves under existing parking lot and labor impacting approximately one acre. Cost: $16,932.24 Total this Change Order: $47,534.33 Staff recommends approval City of Round Rock Page 2 Printed on 12117/2015