Loading...
CM-10-02-028STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 6 TO AGREEMENT FOR ENGINEERING SERVICES FIRM: MWM Design Group ("Engineer") ADDRESS: 305 East Huntland Drive, Suite 200, Austin, TX 78752 PROJECT: Redesign of Sam Bass Road from Meadows Drive to IH -35 This Supplemental Agreement No. 6 to Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and MWM Design Group (Formerly Martinez Wright & Mendez, Inc.), hereinafter called the "Engineer". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinafter called the "Agreement", on the 8th day of May, 2003 for the Redesign of Sam Bass Road from Meadows Drive to 111-35 in the amount of $66,271.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 1 on September 11, 2003 to amend the scope of services and to increase the compensation by $16,305.00 to a total of $82,576.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 2 on September 23, 2004 to extend the contract date; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 3 on February 10, 2005 to amend the scope of services and to increase the compensation by $67,862.00 to a total of $150,438.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 4 on December 18, 2008 to amend the scope of services and to increase the compensation by $51,840.00 to a total of $202,278.00; and WHEREAS, the City and Engineer executed Supplemental Agreement No. 5 on August 14, 2009 to amend the scope of services and to increase the compensation by $40,713.62 to a total of $242,991.62; and WHEREAS, it has become necessary to amend the Agreement to modify the provisions for the scope of services and to modify the compensation by $25,573.02 to a total of $268,564.64, and NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: Supplemental Agreement 0127.0302/181916 V* o 102 -O2 - Rev.07/09 64836 1. Article 2, Scope Of Services To Be Performed By Engineer and Exhibit B, Services To Be Performed By The Engineer shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. ll. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $25,573.02 the lump sum amount payable under the Agreement for a total of $268,564.64, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement in duplicate. MWM DESIGN GROUP (f/n/a MARTINEZ, WRIGHT & MENDEZ, INC.) By: ,oyer F, cD, Marhhez 0%aj/v Date CITY FR,VND ROCK r By: • Jaryi es R. N ue,PC. 215110 Date Supplemental Agreement 0127.0302/181916 1Y1 aritK. 2 Stepha L. Sheets, City Attorney Rcv.07/09 64836 ADDENDUM TO EXHIBIT B Services to be performed by the Engineer The Engineer shall provide the following engineering services for the preparation of the construction plans, specifications and cost opinion (Professional Surveying & Engineering Services) for Supplemental Amendment #6: Item 1 • Addition to design scope - Design of the southeast and southwest corners of Sam Bass Road and Chisholm Trail intersection to accommodate updated locations of the new Traffic Signal and Pedestrian Crossing signal poles and foundations. Design revisions include reconfiguration of sidewalks and ADA compliant pedestrian crosswalk ramps, storm drainage lines, curb inlets, curb and gutter, and grading. • Revise the intersection construction phasing and temporary traffic control plans accordingly. Item 2 • Addition to design scope — Extend storm drainage infrastructure north of Sam Bass Road and parallel to the railroad tracks (area within the old right-of-way limits of Wonder Drive) to channel increased runoff (from recently developed private properties) via the proposed storm drainage infrastructure. • Update drainage area maps and corresponding calculations according to the City's (City of Round Rock) recently updated topographic information. Item 3 • Addition to survey scope — extend easement boundary services (as shown in attached sketch in Exhibit "A") for the extension of storm drainage infrastructure listed above. i) Scope of Services (I) Obtain and review available deeds, subdivision plats and ROW maps pertaining to subject tract and adjoining properties, as identified from Williamson County Appraisal District. (2) Perform field survey to locate existing monumentation on affected boundary lines. (3) Perform office calculations and analysis to re-establish location of affected boundary lines. (4) Prepare sketch for one easement. (5) Prepare metes and bounds description for one easement. (6) Prepare closure and area calculation for one easement. Item 4 • Design coordination with the design sub -consultant HDR-WHM and Client (City of Round Rock) for the design revisions and additional scope of work. Coordination includes office meetings, project site meetings, correspondence, review and sharing of electronic project data between all parties involved. i RAiL • CAA. 4-LRAGATIOS MSC CNIu101. OWLS rVj R..7IB,42 SAM BASS RD. 96H q"!..,. OAK 'j T EXHIBIT'A' Group 305 E. Hunfland Dr. Sults 200 Austtn, Texas 78752 p: 512.453.0767 E 512.453.1734 SCALE c ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Document ADDENDUM TO EXHIBIT "C" PROJECTED WORK SCHEDULE ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Document ADDENDUM TO EXHIBIT D FEE SCHEDULE Item I . Addition to design scope — redesign Sam Bass & Chisholm Tr intersection. MWM DG design task fee Item 2. Addition to design scope — extend storm drainage infrastructure MWM DG design task fee $ 9,895.14 $ 7,026.88 Item 3. Addition to design scope — easement boundary services for Item 2 MWM DG design task fee $ 6,118.28 Item 4. Design coordination w/ sub -consultant and client MWM DG design coordination fee $ 2,532.71 Total Supplemental Amount: $25,573.02 ADDENDUM TO EXHIBIT D FEE SCHEDULE LABOR COSTS BY FUNCTION CODE : DIRECT LABOR ":.OVERHEAD 150.00% TOTAL LABOR+OVHD FIXED FEE 12.00% TOTAL COST 1 Addition to design scope - update the southeast and southwest corners of Sam Bass Rd and Chisholm Trail to accommodate updated locations of the new Traffic Signal and Pedestrian Crossing Signal poles and foundations. Updating includes reconfiguration of sidewalks, storm drainage lines and curb inlets, curb and gutter, grading, and ADA compliant pedestrian crosswalk ramps. 2 Addition to design scope - extend storm drainage infrastructure north of Sam Bass Road and parallel to the railroad tracks (within the previously Wonder Drive ROW limits) to channel increased runoff (from recently developed private properties) vla the proposed storm drainage infrastructure. Also, update drainage area maps and corresponding calculations as per City's recently updated topographic information. 3 Additional survey - extend easement boundary services for the extension of the storm drainage infrastructure listed in above (Item #2). 4 Design coordination (includes office meetings and site visits) with Design Sub -Consultant (HDR-WHM) and Client. TOTALS R�".n�M�S.0 X GSf�fi�P DIRECT COSTS: EXPENSES: UNIT Mail & Deliveries EA d.� TOTAL EXPENSES SUB -CONTRACTS: TOTAL SUB -CONTRACTS TOTAL DIRECT COSTS TOTAL COST $ 3,533.98 $ 2,509.60 $ $ 904.54 6,948.12 RATE $ 5,300.97 $ 3,764.40 $ 1,356.81 $ 10,422.18 TASK QUANTITY 3 8,834.95 $ 6,274.00 $ 2,261.35 $ 17,370.30 TOTAL TOTAL 3 1,060.19 $ 752.86 $ 271.36 $ 2084.44 $ 9,895.14 $ $ 26,673.02 DATE: February 3, 2010 SUBJECT: City Manager Approval — February 5, 2010 ITEM: Consider executing Supplemental Agreement No. 6 with MWM Design Group for the Redesign of Sam Bass Rd. from Meadows Dr. to IH -35 project. Department: Transportation Services Staff Person: Thomas E. Word, P.E., Chief of Public Works Operations Justification: Supplemental Agreement No. 6 with MWM Design Group will provide Engineering Services to update the southeast and southwest corners of Sam Bass Rd. and Chisholm Trail to accommodate updated locations of the new traffic signal and pedestrian crossing signal poles and foundations. It will also provide services related to extending the storm drainage infrastructure north of Sam Bass Rd and parallel to the railroad tracks to channel increased runoff. Also with the project are easement boundary services for the extension of the storm drainage infrastructure. Strategic Plan Relevance: 26.0 Construct major elements of the transportation and mobility system as approved by Council in the Master Transportation Plan Funding: Cost: 2002 General Obligation Bonds Source of funds: $25,573.02 Outside Resources (if applicable): MWM Design Group Public Comment (if applicable): N/A UPDATED APRIL 2008 10 1909 Request for City CounciUCity Manager Action ® City Council ED City Manager Submit completed form for all City Manager and City Council approvals Department Name: Transportation Services Contact Person: Chat Gordon / Kathy Michna Project Mgr/Resource: Bill Stablein Project Coordinator: Tom Word, P.E. Assigned Attorney: Stephan Sheets City Council or City Manager Approval Date: Agenda Wording Received: Tag#: 0.,Y,,- -(12-(6 Original Documents Received: , } Project Name: Redesign of Sam Bass Rd from Meadows Dr. to IH -35. ContractorNendor. MWM Design Group Funding Source: 2002 General Obligation Bonds Additional funding Source: Amount: $ Account Number 2/5/2010 25,573.02 Consider executing Supplemental Agreement No. 6 with MWM Design Group for the Redesign of Sam Bass Rd. from Meadows Dr. to IH -35 project. Finance Information Is Funding Required? Yes C7 No n Initial Construction Contract Q Construction Contract Amendment E:3 Change Order Change in Quantity DUnforeseen Circumstances Q Initial Professional Servlces Agreement Supplemental Professional Service Agreement # 6 Purchasing/Service Agreement Purchase Order Item(s) to be purchased Other (Please clearly Identify action below) Amount S 25,573.02 FiNA'_NCE. N/A Approved Q Finance/CIP Date 1EJ Finance/Acct Date IED Purchasing Date Q Budget Date APPROVALS (to be completed ONLY by Finance) Approved 1 Finance Director Date r,c - I i leen ob t 7. please lcrry rc h ✓ r pat x :i.. for, a o i r: �i o ITEMS WILL NOT BE PLACES} ON THErAGENDA(Ay IORrTOry. SaraMtWhine. COUNCIL WITHOUT F iNANrF ANO LEGA; APPROVAL PRIOR TO 5U@MiSSlON. Reeuired for Submission of ALL City Council and City Manager Items s-1 1 .q Date: 02— / - / 0 Project Mgr. Signature: Dept. Director Signature: 'City Attorney Signature: City Manager Signature: Date: .21r 1! Date: 5-I/ Date: *City Attorney signature is required for all items. REVISED 1/29/2010 10.19.09 Request for City CounciUCity Manager Action ® City Council ED City Manager Submit completed fonn for all City Manager and City Council approvals. Department Name: Transportation Services Contact Person: Chaz Gordon / Kathy Michna Project Mgr/Resource: Bill Sta blein Project Coordinator: Tom Word, P.E. Assigned Attorney: Stephan Sheets City Council or City Manager Approval Date: Agenda Wording For Administration Use ONLY Received: Tag #: Original Documents Received: Project Name: Redesign of Sam Bass Rd from Meadows Dr. to IH -35. Contractor/\/endor: MWM Design Group Funding Source: 2002 General Obligation Bonds Additional funding Source: Amount: $ Account Number: 2/5/2010 25,573.02 Consider executing Supplemental Agreement No. 6 with MWM Design Group for the Redesign of Sam Bass Rd. from Meadows Dr. to IH -35 project. Finance Information EJ 0 0 Is Funding Required? Yes LI No Initial Construction Contract Construction Contract Amendment Change Order # Change in Quantity EUnforeseen Circumstances Initial Professional Services Agreement Supplemental Professional Service Agreement p 6 Purchasing/Service Agreement Purchase Order Item(s) to be purchased Other (Please clearly identify action below) Amount $ 25,573.02 APPROVALS (to be completed ONLY by Finance) FINANCE Final Finance Approval Required WA Approved Approved OFinance/CIP L. Olsen Finance/Acct E. Wilson 0 CI Purchasing CD CI Budget R. Barker P. Bryan Date 2/2/2010 Date 2/2/2010 Date 2/3/2010 Date 2/2/2010 Ix Cheryl Delaney 2/3/2010 Finance Director Date Once approvals have been obtained. please forward the RFA blue sheet, backup information and originals to City Secretary, Sara White. ITEMS WILL NOT BE PLACED ON THE COUNCIL AGENDA WITHOUT FINANCE AND LEGAL APPROVAL PRIOR TO SUBMISSION. Required for Submission of ALL City Council and City Manager Items Project Mgr. Signature: Date: Dept. Director Signature: Date: 'City Attorney Signature: Date: City Manager Signature: Date: City Attorney signature is required for all items. REVISED 2/3/2010 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: PW(Transportation Project Mgr/Resource: Bili Stabiein Council Action: ORDINANCE Agenda Wording Redesign of Sam Bass Rd from Meadows Dr. to Project Name: IH -35. Contractor/Vendor: MWM Design Group ri RESOLUTION City Manager Approval CMA Wording Consider executing Supplemental Agreement No. 6 with MWM Design Group for the Redesign of Barn Bass Rd. from Meadows Dr. to IH -35 project. Ememmimmonumma Attorney Approval AttorneyF ' *' fA ' Date Notes/Comments , t_ a 'r O.\wdoX\SCClnts\0199\0302\MISC100181041.XI S Updated 6/3/08