CM-10-02-041STATE OF TEXAS § COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: WAELTZ & PRETE, INC. ("Engineer") ADDRESS: 3000 Joe DiMaggio, Suite 72, Round Rock, TX 78665 PROJECT: Red Bud Lane Phase IV This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Waeltz & Prete, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 9th day of April, 2009 for the Red Bud Lane Phase IV Project in the amount of $99,681.51; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $7,183.41 to a total of $106,864,92; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows; 1. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. IL Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $7,183.41 the lump sum amount payable under the Contract for a total of $106,864.92, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract 0199-7099; 400182551 Un- t 0-02- o4 Rev.12/01/08 84275 WAELT & PRETE, INC, •=(// By: 4. zilazmiiit WAlezra , i., Pis. - 9- 10 Date CITY OF ROUND ROCK By: APP VED S T 1 FORM: awes "R.Itie, P.E. Step Date ii\aAlk Supplemental Contract 0199-7099; #00182551 2 n L. Sheets, City Attorney Rev.12/01 /08 84275 ADDENDUM TO EXHIBIT B Engineering Services The changes to the scope of this project are as follows: 1. Deletion of the preparation of a Stoma Water Pollution Prevention Plan (SWPPP) As the' area of disturbance is less than 5 acres the amount of effort to prepare the SWPPP is less than originally anticipated. SWPPP will be in accordance with City of Round Rock policy and will be included in the construction plans. A separate SWPPP booklet will be prepared, however, the SWPPP will not be submitted to the Texas Commission on Environmental Quality (TCEQ). 2. Additional Drainage Design The original Scope of Services anticipated the use of the existing storm sewer line traversing the length of the project. Upon final field verification of the vertical location of the existing force mains in the street, it was determined that a secondary trunk system was the most cost effective solution as the existing storm sewer and force mains were at approximately the same elevation. The design of this secondary system was not anticipated in the original Scope of Services. 3. Street Light Design Add the design of Street Lighting to the Construction Documents 4. Additional Field Time for Location of Existing Force Mains The existing force mains were exposed by City utility crews on three separate occasions necessitating three separate trips for the observation of and surveying of their respective locations. Subsurface Utility Engineering was specifically excluded from the original Scope of Services. 5. Additional Reimbursable Fees Add $475.00 for ADA review and registration fees. ADDENDUM TO EXHIBIT C Work Schedule The changes to the Work Schedule for this project are as follows: The Contract time by this Supplemental Agreement will be extended until December 31, 2010. ADDENDUM TO EXHIBIT D Fee Schedule The changes to the fee schedule for this project are as follows: (Attached Behind This Page) Phase: D.1 - Project Start -Up PE = PD = Man-hour Projection (Civil Scope) Project Engineer EA = Engineering Assistant ECT = Engineer CAD Tech Project Designer SCT = Senior CAD Tech ADM = Administrative Task Description: PE PD EA SCT ECT ADM Total a Project Kick -Off Meeting with City Staff. 2 2 b Gather, assemble and review existing As -Built information and new project information within project limits. 2 8 10 c Prepare letter to all dry utility providers notifying them of proposed project. 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14 Phase: D.2 - Schematic Design PE = PD = Man-hour Projection (Civil Scope) Project Engineer EA = Engineering Assistant ECT = Engineer CAD Tech Project Designer SCT = Senior CAD Tech ADM = Administrative Task Description: PE PD EA SCT ECT ADM Total a Research and review available information on City owned utilities within the project area. 2 4 6 b Research and review available information on dry utilities within the project area. 2 2 c Meet with Inland Geodetics and review topographic survey. 2 2 4 d Prepare preliminary drainage plan. 6 8 14 e Prepare schematic horizontal layout of proposed Improvements. 8 24 32 f Prepare preliminary profile of proposed improvements. 6 24 30 g Prepare schematic design of proposed retaining walls and concrete fence. 4 8 12 h Prepare Preliminary Engineer's Opinion of Probable Cost. 3 8 11 i Submit Schematic Plans to Transportation Department for initial review. 1 4 5 j Meet with City staff to review comments. 2 2 k Revise schematics as required in response to staff comments. 8 12 20 Resubmit schematics and secure staff approval of schematic design. 1 4 5 m Revise Preliminary Engineer's Opinion of Probable Cost as appropriate. 1 3 4 0 0 0 0 147 Phase: D.3 - Final Design PE = PD = Man-hour Projection (Civil Scope) Project Engineer EA = Engineering Assistant ECT = Engineer CAD Tech Project Designer SCT = Senior CAD Tech ADM = Administrative Task Description: PE PD EA SCT ECT ADM Total a CORR General Construction Notes and Project Specific Notes. 2 4 6 b Overall Project Plan. 8 16 24 c Overall Drainage Plan. 8 16 24 d Erosion, Sedimentation, Tree Protection Plan. 8 16 24 e Survey Control Plan. 8 16 24 f Roadway Plan & Profile. 32 40 72 g Prepare Cross Sections on 50 foot intervals. 16 40 72 h Prepare Storm Sewer Plan and Profiles. 32 40 56 i Detail Grading Plan for areas where finite grading is required. 6 12 18 j Utility Plan (Manhole adjustments, relocation of unknown utilities, water line adjustments and adjustments of domestic water, sewer connections as required). 8 20 28 k Prepare details for retaining wail and concrete fencing. 8 16 24 I Prepare Traffic Control Plan. 16 24 40 m Construction Details, as required. 4 16 20 n Prepare plan submittals at 60%,90%,100%. 12 24 36 o Update Engineer's Opinion of Probable Cost for each plan submittal. 16 24 40 0 -hour Summary 0 0 0 432 Man-hour Projection (Civil Scope) Phase: D.4 - Storm Water Pollution Prevention Plan (SWPPP) PE = PD = Project Engineer EA = Engineering Assistant ECT = Engineer CAD Tech Protect Designer SCT = Senior CAD Tech ADM = Administrative Task Description: PE PD EA SCT ECT ADM Total a Prepare a SWPPP for the project. 8 4 12 b Assist Owner/Contractor in filing NOI's. 3 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 , 0 0 0 0 0 15 Phase: D.5 - Permit Processing PE _ PD = Man-hour Projection (Civil Scope) Project Engineer EA = Englneering Assistant ECT = Engineer CAD Tech Project Designer SCT = Senior CAD Tech ADM = Administrative Task Description: PE PD EA SCT ECT ADM Total a Process plans for approval through CORR.(Includes 2 submittals, response to comments, and plan revisions, as required). 4 8 12 b Assist processing plans for approval through Department of Licensing and Regulation for ADA approval. (Includes 2 submittals, response to comments, and plan revisions, as required). 2 6 8 0 0 0 0 0 0 0 0 0 0 0 0 an -Hour summary 0 0 0 0 20 Phase: D.6 - Bidding PE = PD = Man-hour Projection (Civil Scope) Project Engineer EA = Engineering Assistant ECT = Engineer CAD Tech Project Designer SCT = Senior CAD Tech ADM = Administrative Task Description: PE PD EA SCT ECT ADM Total a Assist In the preparation in Contract Documents and Specifications. (Includes Civil Special Conditions, DAC's, Technical Specifications and Civil quantity "Take -offs"). 16 28 44 b Issue addendums/clarifications, as required. 4 4 c Attend Bidding Opening. 2 2 d Assist with the evaluation of bids and recommendation of the Contractor. 4 4 8 0 0 0 0 0 0 0 0 0 0 0 0 an -pour Summary .0 0.0 32.0 0.0 0.0 0.0 0.0 58 Man-hour Projection (Civil Scope) Phase: D.7 - Construction Phase PE = PD = Project Engineer EA = Engineering Assistant ECT = Engineer CAD Tech Project Designer SCT = Senior CAD Tech ADM = Administrative Task Description: PE PD EA SCT ECT ADM Total a Attend Preconstruction Meeting. 3 3 b Attend Bimonthly project progress meetings. (Assumes 6 months construction, 2 Mtgs per months @ 2hrs per Mtg). 24 24 c Assist with Pay Application reviews and recommendations. 9 9 d Review of Submittals, Shop Drawings, and Samples. 8 8 e Respond to RFI's, if required. 8 8 f Period Site Visits (Assumes 4 per month @ 1.0 hours per visit). 24 24 g Assist in preparation of Punch list. (Includes final walk through and generating Civil Punch list). 6 6 h Issue Engineer's Concurrence at project completion. 2 2 i Prepare "Record Drawings". Waeltz & Prete will make changes to plans based upon Contractor "mark-ups". 2 4 6 0 0 0 0 0 0 ■A_._ L_. ._ "_.___-__ _.... 0 .0 0.0 4.0 0.0 0.0 0.0 0.0 90 Exhibit D - FEE SCHEDULE 0 lit a W a Task Description O O O O 0 0 0 0 O O O N O O O O CO O 0 r 11 0 c 0) 0) 0 m 0 0 To O a co 0 co 0 .c rn :.1 N 0) co 0 2 li 0) E i= v G) iL c c _o o8 J Q orirs 0 2 O 0 O 0 CO O O CO 69 0 69 O 0 O 0 00 O 0 O O O N O 2 to w 0 0 ate+ H Tot lab+OH 0 O O • o 0.5 co N .a, c7 t ER 67, 0 03 Total Hours 0) Direct Labor Cost Engineering Services Fee: 0 O I) 1 T N a l• CO N N d' O M Cr? t• CO 6f3 ti CO CV t99 <0 01 03 69 T O N 0) 0 O 0) co rn O Cr) 71. M EA 0 0) O 0 N 44 M 0) 0 0 CM a 0 0 of 0 N 0 0 0 O 69 69 0 O Ln 0) 0 a 0 0 0) 0) 0 a) m c 0 To 0 O M 0 a) E c 4) D n.)o J o o 12 cisQ N cl 0 li. C O d oi c o M ^1- tiS i"VW � O 0) O CO Efi r if) O 07 1.6 69. Li) to 0 0 O O (Y)(0 v ti W c4 W o y 0 cei J ' I-- 69- Z 2 o W 4- .J wm a11 zw D C NW76 lli U) cn j L aOELls S p • rn me`8liW Q C N o c N LL V) • N D0 Msa0iJ 75'C) { c ma}- I— • w A c pQ 0 DATE: February 17, 2010 SUBJECT: City Manager Approval - February 19, 2010 ITEM: Consider executing Supplemental Contract No. 1 with Waeltz & Prete, Inc. for the Red Bud Lane Phase IV Project. Department: Engineering and Development Services Staff Person: Danny Halden, P.E., City Engineer Justification: Supplemental Contract # 1 is needed to adjust manhours for the SWPPP, add additional drainage design, add street Tight design, add additional field time for force main location, and add ADA Fees as a reimbursable expense. Strategic Plan Relevance: Goal 26.0: Construct major element of the transportation and mobility system as approved by Council in the Master Transportation Plan. Goal 29.0: Provide for effective management of storm water. Funding: Cost: $7,183.41 Source of funds: Round Rock Transportation Development Corporation Construction Outside Resources: Waeltz & Prete, Inc. Public Comment: N/A UPDATED: October 19, 2009 10 19 09 Request for City r 'ilncil/City Manager Action ® City Council E1 City Manager Submit completed form for all City Manager and City Council approvals. Department Name: Engineering & Development Services Contact Person: Chaz Gordon / Kathy Michna Project Mgr/Resource: Lance Shellenberer Project Coordinator: N/A Assigned Attorney: Steve Sheets City Council or City Manager Approval Date: Agenda Wording Received: Tag #: 1W14[115WA DAIS Original Documents Received: Project Name: Red Bud Lane Phase Four ContractorNendor: Waeltz & Prete, Inc. Funding Source: RR Trans Dev Corp Construction Additional funding Source: Amount: Account Number: February 19, 2010 $7,183.41 Consider executing Supplemental Contract NO. 1 with Waeltz & Prete, Inc. for the Red Bud Lane Phase IV Project. Finance Information Is Funding Required? Yes n No n Initial Construction Contract Construction Contract Amendment Change Order JChange in Quantity EUnforeseen Circumstances Initial Professional Services Agreement 0 Supplemental Professional Service Agreement # 1 Purchasing/Service Agreement Purchase Order Item(s) to be purchased Other (Please clearly identify action below) Amount $7,183.41 FINANCE N/A Approved 0 0 E H H Finance/CIP Finance/Acct Purchasing Budget Date Date Date Date APPROVALS (to be completed ONLY by Finance) Finai Finance Approval Required Approved Finance Director Date Once approvals have been obtained. please forward the RFA. blue sheet. back up information and originals to City Secretary, Sara White. ITEMS WILL NOT BE PLACED ON THE COUNCIL AGENDA. WITHOUT FINANCE AND LEGAL APPROVAL PRIOR TO SUBMISSION. Required for Submission of ALL City Cou it and City �/ Project Mgr. Signatur���� Date: 2-9 ' f& Dept. Director Signatur ar'Date: 2/'1//0 • *City Attorney Signature: �� ; • Date: 2- LQ' l -10 City Manager Signature: Date: 2 -LI- (iJ *City Attorney signature is required for all items. REVISED 2/9/2010 10 19 09 Request for City CounciUCity Manager Action ® City Council DI City Manager Submit completed form for all City Manager and City Council approvals. Department Name: Engineering & Development Services Contact Person: Chaz Gordon / Kathy Michna Project Mgr/Resource: Lance Shellenberer Project Coordinator: N/A Assigned Attorney: Steve Sheets City Council or City Manager Approval Date: Agenda Wording For Administration Use ONLY Received: Tag #: Original Documents Received: Project Name: Red Bud Lane Phase Four ContractorNendor: Waeltz & Prete, Inc. Funding Source: RR Trans Dev Corp Construction Additional funding Source: Amount: Account Number: February 19, 2010 $7,183.41 Consider executing Supplemental Contract NO. 1 with Waeltz & Prete, Inc. for the Red Bud Lane Phase IV Project. Finance Information Is Funding Required? Yes n No Initial Construction Contract Construction Contract Amendment Change Order EJChange in Quantity Unforeseen Circumstances Initial Professional Services Agreement 0 Supplemental Professional Service Agreement # 1 Purchasing/Service Agreement Purchase Order Item(s) to be purchased Other (Please clearly identify action below) Amount $7,183.41 FINANCE N/A Approved CI CD 0 ED El 00 Finance/CIP L. Olsen Finance/Acct E. Wilson Purchasing EE Bowden Budget P. Bryan APPROVALS (to be completed ONLY by Finance) Final Finance Approval Required Date 2/16/2010 Date 2/16/2010 Date 2/16/2010 Date 2/16/2010 APPnrved x ESW for C. Delaney 2/17/2010 Finance Director Date Once approvals have been obtained, please forward the RFA. blue sheet, back up information and originals to City Secretary, Sara White. ITEMS WILL NOT BE PLACED ON THE COUNCIL AGENDA WITHOUT FINANCE AND LEGAL APPROVAL PRIOR TO SUBMISSION. Required for Submission of ALL City Council and City Manager Items Project Mgr. Signature: Date: Dept. Director Signature: Date: *City Attorney Signature: Date: City Manager Signature: Date: *City Attomey signature is required for all items. REVISED 2/17/2010 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager Items Department Name: PW/Transportation Project Name: Red Bud Lane Phase IV Project Mgr/Resource: Bill Stablein []Council Action: ORDINANCE ContractorNendor: Waeltz & Prete, Inc. F-1 RESOLUTION Agenda Wording City Manager Approval CMA Wording Consider executing Supplemental Contract No. 1 with Waeltz & Prete, Inc. for the Red Bud Lane Phase IV Project. Attorney pproval Attorney Notes/Comments Date q !b O:\wdox\SC CInts\0199170991M ISC100182745.XLS Updated 6/3/08