Loading...
CM-10-03-063NON-STANDARD LIGHTING FIXTURE AGREEMENT - THREE PARTY THIS NON-STANDARD LIGHTING FIXTURE AGREEMENT ("Agreement") is entered into, effective this 19th day of February, 2010, by and between Oncor Electric Delivery Company LLC, a Delaware Iimited liability company, ("Company"), Waterstone Development ("Developer"), and the City of Round Rock, Texas, a municipal corporation (the "Customer"). Recitals a. Whereas, Developer and Customer desire that Company install street lighting fixtures in the Avery Centre development Texas along College Park Drive between University Blvd and Avery -Nelson Way, and along Avery -Nelson Way between AW Grimes Blvd and College Park Drive: said streets as depicted on Exhibit A attached herewith, located in Round Rock, Texas pursuant to the provisions of Company's Tariff for Retail Delivery Service ("Tariff"); and b. Whereas, Developer has requested that Company install street lighting fixtures that are not of a type normally used by Company ("Non -Standard Fixtures"). c. Whereas, Oncor has approved the following non-standard poles, luminaires and brackets: • The poles shall be Dark Bronze (RAL8014), 30' Eurotique stepped aluminum style, anchor base poles with a 10.5" bolt circle. The poles shall fit on Oncor's standard 24" diameter street light foundation, are rated for a 100 MHP wind with a 30% gust factor, shall accept a I" anchor bolt and shall have a minimum 4" X 6" hand hole. Antique Street Lamp's drawing number is SRSP30-7.0-11-RAL9016-4.38X8 O The luminaires shall be Dark Bronze (RAL8014) in color, 250W, MH, pulse start, large 22.5" diameter, 120 volt, Hanover series luminaires with type III distribution and shall use Mogul base 250W MH, ANSI M153/E pulse start lamps. Antique Street Lamp's part number is EH22FT 250M MOG GCF SR3 TB1 IDS CS. • The bracket arm shall be Antique Street Lamp's part number EAL5i 1 PER CS, shall be Dark Bronze (RAL8014) in color, and has the photocell receptacle included in the arm assembly mounted on top oldie pole. Installation of the pole foundations and all civil work shall be per Oncor specifications. NOW, THEREFORE, Company, Developer, and the Customer, in consideration of the mutual benefits to be obtained and in consideration of the covenants and conditions contained herein, agree as follows: I. Installation and Ownership. Company will install, own, and maintain the Non -Standard Fixtures under the following conditions: (a) Developer provides detailed specifications of the proposed Non -Standard Fixtures to Company for review at least 30 days prior to the requested date of installation. (b) (c) Developer receives written authorization for use of the Non -Standard Fixtures from Company. Developer purchases and delivers the Non -Standard Fixtures to a site designated by Company' prior to the scheduled installation date. (d) Developer is responsible for any damage to, or loss of, the Non -Standard Fixtures prior to installation. 2. Installation Costs. Developer shall pay to Company the installation costs for the Non -Standard Fixtures, if any, pursuant to the provisions of the Tariff. NON-STANDARD LIGHTING AGREEMENT - THREE PARTY, P. 1 OF 3 M-lO-o3-o3 3. Maintenance. Company will maintain the Non -Standard Fixtures in accordance with the Tariff. 4. Replacement. In the event a Non -Standard Fixture needs to be replaced or repaired, Company will replace or repair the Non -Standard Fixture, as directed by the Customer or the Customer's retail electric provider, pursuant to one of the following options: (a) Replace the Non -Standard Fixture or a portion thereof with a compatible replacement fixture or parts of a fixture provided to the site by either Customer or Developer;` (b) Replace the Non -Standard Fixture with a fixture of a type normally used by Company', which, in Company's sole discretion, most closely matches the Non -Standard Fixture; or (c) Replace the Non -Standard Fixture with the least expensive standard fixture that Company has in stock at the time of replacement. * Lt the event the Customer or Developer is unable to provide a replacement fixture in a timely manner the Company reserves the right to replace the Non -Standard fixture pursuant to sections (b) or (c) above in order to meet regulatory requirements. 5. Replacement Costs. If Customer later requests Company to remove a fixture installed pursuant to Section 4(b) or (c) above and replace with Customer's Non -Standard fixture, Customer shall also pay Company to make such a replacement. 6. Charges for Lighting Service. Company will charge the Customer's retail electric provider for lighting service for the Non -Standard Fixtures pursuant to Schedule A of Company's Lighting Service Rate Schedule set forth in the Tariff. 7. Other Provisions. (a) Assignment. No party may assign this Agreement without the prior written consent of the other parties, except that any party may, without such consent, assign this Agreement to any affiliate, wholly-owned subsidiary, or parent company of such party. Subject to the foregoing provision of this paragraph, this Agreement is binding on the parties' successors and assigns. (b) Entire Agreement: Modifications. This Agreement constitutes the entire agreement and understanding between the parties hereto with respect to the Non -Standard Fixtures as described herein and supersedes all prior and contemporaneous agreements and understandings of the parties in connection with the Non -Standard Fixtures. No statements, agreements, understandings, representations, warranties or conditions not expressed in this Agreement will be binding upon the parties hereto, or will be effective to interpret, change, or restrict the provisions of this Agreement unless such are in writing signed by both parties hereto and by reference made a part hereof. (c) Effect of this Agreement. In the event of a conflict between the terms of this Agreement and the Tariff, the provisions of the Tariff shall control. (d) Headings. The headings in this Agreement are for convenience and reference only and in no way define, describe, extend, or limit the scope of intent of this Agreement or the intent of any provision contained herein. NON-STANDARD LIGHTING AGREEMENT - THREE PARTY, P. 2 OF 3 IN WITNESS WHEREOF, the pasties have caused this Agreement representatives as of the dates below their respective signatures. ONCOR ELECTRIC DELIVERY COMPANY By: 0-2,44?/k Name: Bob Faikus Title: Sr. Prosect Manager Date: 2 I —/O (Cu 4v %ter) By: Name: Title: Date: 3-la�d D 0 By: Name: Title: Date: to be executed by their duly authorized 2- 2 (-'& NON-STANDARD LIGHTING AGREEMENT - THREE PARTY, P. 3 OF 3 Texas State University Round Rock AW GR 1 Nfl.. S Austin Community College DATE: March 10, 2010 SUBJECT: City Manager Approval — March 12, 2010 ITEM: Consider executing Non -Standard Lighting Fixture Agreement -Three Party with Oncor Electric Delivery Company and Waterstone Development for portions of the Avery Center Development. Department: Staff Person: Engineering and Development Services Department Danny Halden, P.E., City Engineer Justification: This agreement was previously signed with the following justification: Oncor Electric Delivery Company, LLC requires execution of this Three Party agreement with the City and Waterstone Development for the installation and future maintenance of non-standard poles and fixture heads for street lighting in the Avery Centre development. Oncor Electric Delivery Company, LLC does not stock non-standard poles and fixture heads that are desired by the developer. This agreement provides specific details regarding the management of this non-standard lighting. This agreement only addresses lighting on College Park Drive and Avery -Nelson Way as depicted in the exhibit accompanying the agreement. Since that time, it was discovered the technical specification for the color of the Tight pole was incorrect. This updated agreement corrects that error. Strategic Plan Relevance: Goal #2: Prevent neighborhood deterioration Goal #4: Improve the aesthetics, development and redevelopment quality, and sustainability of the City Funding: Cost: $383.60/month ($10.96 per Tight per month) Source of funds: General Funds Outside Resources (if applicable): Oncor Electric Delivery Company, LLC Public Comment (if applicable): UPDATED: October 19, 2009 101909 Request for City CouncillCity Manager Action ED City Council IoJ City Manager Submit completed form for all City Manager and City Council approvals. Department Name: L bS Contact Person: Chaz Gordon / Kathy Michna Project Mgr/Resource: Cindy8emers `'�wnr,� Project Coordinator. Assigned Attorney: Charlie Crossfield City Council or City Manager Approval Date: Agenda Wording 1h- For r cfl»miSt6at c,f�% fr; `ONLY ReceivedA MAR 10201 Tagt DIA. -10-05-045 Original Documents Received: Project Name: Non -Standard Lighting Fixture Agreement Oncor Electric Delivery Company and ContractorNendor. Waterstone Development Funding Source: General Fund Additional funding Source: Amount: $383.60/month ($10.96 per light per month) Account Number: 5272-100-26000 March 12, 2010 Consider executing Non -Standard Lighting Fixture Agreement -Three Party with Oncor Electric Delivery Company and Waterstone Development for portions of the Avery Center Development. Finance Information Is Funding Required? Initial Construction Contract Construction Contract Amendment Change Order =Change in Quantity Initial Professional Services Agreement Supplemental Professional Service Agreement Purchasing/Service Agreement Purchase Order Item(s) to be purchased Yes 0 No [ 1 Unforeseen Circumstances Other (Please clearly identify action below) Adding 35 new street lights to the existing contract with Oncor. Amount $ 383.60 FINANCE N/A Approved oa EJ El 0 00 Finance/CIP Finance/Acct Purchasing Budget Date Data Date Date APPROVALS (to be completed ONLY by Fkrar>ce) Final Finance Approval Required Aeeroved Fl : . Director Date Once approvals have been obtained, please forward the RFA, blue sheet, backup information and originals to City Secretary, Sara White. ITEMS WILL NOT BE PLACED ON THE COUNCIL AGENDA WITHOUT FINANCE AND LEGAL APPROVAL PRIOR TO SUBMISSION. uired for Submission of ALL C Council and CMan Project Mgr. Signature: Dept. Director Signat 'City Attorney Signature: City Manager Signature: Date: 0.3 ,i- 7'w /? Date: /41/ C) Date: 5-I VO Date: 'City Attorney signature is required for all items. REVISED 3/4/2010 LEGAL DEPARTMENT APPROVAL FOR CITY COUNCIL/CITY MANAGER ACTION Required for Submission of ALL City Council and City Manager items Department Name: ENGINEERING AND DEVELOPMENT Project Mgr/Resource: DANNY HALDEN JCouncil Action: ORDINANCE Agenda Wording_ NON-STANDARD I.IGHTING FIXTURE Protect Name: AGREEMENT C on tracto rNe nd or: ONCO R n RESOLUTION City Manager Approval CMA Wording Consider executing Non -Standard Lighting Fixture Agreement - Three Party with Oncor Electric Delivery Company and Waterstone Development for portions of the Avery Center Development, Attorney Approval JAttorney Notes/Cornrnents Date 0:twdoxlSCClnts10125109001M1SC100177334 Updated 813108